IS codes for rock testing in geotechnical engineering
IS 10082:1982 - Method for determination of unconfined compressive strength of rock materials
IS 10083:1982 - Method for determination of point load strength index of rock materials
IS 10086:1982 - Method for determination of direct shear strength of rock materials
IS 10087:1982 - Method for determination of tensile strength of natural building stones
IS 1121:1974 - Meth...
I applied via Referral and was interviewed in Aug 2023. There was 1 interview round.
posted on 14 Oct 2023
I applied via Approached by Company and was interviewed before Oct 2022. There were 2 interview rounds.
Density of bentonite and prestressing formula are two separate topics in civil engineering.
Density of bentonite is typically around 2.0-2.5 g/cm^3.
Prestressing formula involves calculating the stress in a structure due to applied loads and prestressing forces.
Example of prestressing formula: Stress = Load / Area + Prestressing Force / Area
posted on 26 Jan 2025
CoS billing procedure involves categorizing and prioritizing traffic for billing purposes.
CoS (Class of Service) is a method used in networking to prioritize different types of traffic.
Billing procedures based on CoS involve assigning costs or charges to different classes of service.
Examples include charging more for high-priority traffic like VoIP calls compared to lower-priority data traffic.
I applied via Company Website and was interviewed in Jun 2023. There were 3 interview rounds.
P6 is a project management software used for scheduling, Float is the amount of time an activity can be delayed without delaying the project, Critical activities are tasks that must be completed on time to prevent project delays.
P6 is a software used for project scheduling and management
Float is the amount of time an activity can be delayed without affecting the project deadline
Critical activities are tasks that have z...
I applied via Naukri.com and was interviewed in Apr 2024. There was 1 interview round.
Minimum gap between two structures for seismic point of view is typically around 1.5 times the height of the taller structure.
Minimum gap is usually 1.5 times the height of the taller structure to reduce seismic interaction.
This gap helps prevent collision or structural damage during an earthquake.
Building codes and regulations may specify minimum gaps for seismic safety.
Example: If one building is 100 feet tall, the m...
I applied via LinkedIn and was interviewed before Aug 2023. There were 2 interview rounds.
Managed various projects including software development, system integration, and process improvement.
Led a team in developing a new software application for streamlining customer data management
Implemented system integration solutions to improve communication between different departments
Executed process improvement initiatives to increase efficiency and reduce costs
Collaborated with cross-functional teams to ensure pr
Continuous learning, growth, challenging projects, leadership opportunities, work-life balance
Continuous learning and skill development through training and certifications
Opportunities for career growth and advancement
Challenging projects that allow for problem-solving and innovation
Leadership opportunities to mentor and guide junior team members
Maintaining a healthy work-life balance to prevent burnout
I applied via Job Portal and was interviewed in Oct 2020. There was 1 interview round.
The question is unclear and lacks context.
Please provide more information about the 'update shuttering system'.
Specify the time frame for the updates.
Clarify the purpose or objective of the updates.
Provide any relevant examples or scenarios.
I want to work as an execution engineer because I enjoy the challenge of overseeing and coordinating all aspects of a project.
As an execution engineer, I would have the opportunity to work on a variety of projects and oversee all aspects of their execution.
I enjoy the challenge of coordinating different teams and ensuring that everything runs smoothly.
While working on a formwork or quality team would be valuable experi...
Concrete is the most important as it provides the strength and durability to the structure.
Concrete is the backbone of any RCC structure.
It provides the strength and durability to the structure.
Reinforcements and formwork are important too, but without concrete, they are useless.
Proper mix design and curing of concrete are crucial for the longevity of the structure.
based on 1 interview
Interview experience
based on 1 review
Rating in categories
Structural Engineer
32
salaries
| ₹0 L/yr - ₹0 L/yr |
Architect
31
salaries
| ₹0 L/yr - ₹0 L/yr |
CAD Technician
28
salaries
| ₹0 L/yr - ₹0 L/yr |
Section Engineer
24
salaries
| ₹0 L/yr - ₹0 L/yr |
Site Engineer
23
salaries
| ₹0 L/yr - ₹0 L/yr |
AECOM
Jacobs Engineering Group
WSP
Parsons Corporation