Upload Button Icon Add office photos
Engaged Employer

i

This company page is being actively managed by Syscon Wires Team. If you also belong to the team, you can get access from here

Syscon Wires Verified Tick

Compare button icon Compare button icon Compare
3.9

based on 10 Reviews

Filter interviews by

Syscon Wires Interview Questions and Answers

Be the first one to contribute and help others!

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - HR 

(2 Questions)

  • Q1. Why you are applying for this job?
  • Ans. 

    I am applying for this job because of my passion for managing civil projects and my proven track record of successful project completions.

    • Passion for managing civil projects

    • Proven track record of successful project completions

    • Excited about the opportunity to contribute to impactful infrastructure projects

  • Answered by AI
  • Q2. Why you requested for salary hike?
  • Ans. 

    I requested a salary hike due to increased responsibilities, achievements, and market value.

    • Increased responsibilities in current role

    • Achievements such as successful completion of projects or exceeding targets

    • Market value based on industry standards and experience

    • Cost of living increase or inflation affecting expenses

  • Answered by AI
Round 2 - Technical 

(2 Questions)

  • Q1. Explain about the various stages of construction of the foundation of building.
  • Ans. 

    The various stages of construction of the foundation of a building include site preparation, excavation, foundation design, footing construction, and foundation pouring.

    • Site preparation involves clearing the area and leveling the ground for construction.

    • Excavation is the process of digging a hole in the ground to create space for the foundation.

    • Foundation design is crucial to ensure the building's stability and load-be...

  • Answered by AI
  • Q2. What will be the Design mix for Concrete .
  • Ans. 

    The design mix for concrete is the proportion of various ingredients like cement, sand, aggregates, and water to achieve the desired strength and durability.

    • Design mix is determined based on the required strength and durability of the concrete

    • It involves selecting the right proportions of cement, sand, aggregates, and water

    • Various factors like type of construction, exposure conditions, and desired workability influence...

  • Answered by AI
Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Sep 2024. There were 2 interview rounds.

Round 1 - Group Discussion 

Very nicely & strictly selected

Round 2 - One-on-one 

(2 Questions)

  • Q1. About my job professiinal
  • Q2. Details about work profile
Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in May 2024. There were 2 interview rounds.

Round 1 - One-on-one 

(2 Questions)

  • Q1. What is life cycle of asset
  • Ans. 

    The life cycle of an asset refers to the stages it goes through from acquisition to disposal.

    • Acquisition: The asset is obtained and put into use.

    • Utilization: The asset is used for its intended purpose.

    • Maintenance: Regular maintenance and repairs are performed to ensure optimal performance.

    • Depreciation: The asset loses value over time due to wear and tear.

    • Disposal: The asset is either sold, scrapped, or otherwise dispos...

  • Answered by AI
  • Q2. Difference between depreciation and amortization
  • Ans. 

    Depreciation is for tangible assets like buildings and machinery, while amortization is for intangible assets like patents and copyrights.

    • Depreciation is the allocation of the cost of tangible assets over their useful life.

    • Amortization is the allocation of the cost of intangible assets over their useful life.

    • Depreciation is typically used for assets like buildings, machinery, and vehicles.

    • Amortization is typically used...

  • Answered by AI
Round 2 - Technical 

(2 Questions)

  • Q1. What is Asset under construction
  • Ans. 

    Asset under construction refers to assets that are being constructed or developed but are not yet completed and ready for use.

    • Assets under construction are not yet in use and are still being developed or built.

    • These assets are typically recorded as a separate category on the balance sheet until they are completed and ready for use.

    • Examples include buildings, machinery, and infrastructure projects that are still in the

  • Answered by AI
  • Q2. What is Asset revaluation
  • Ans. 

    Asset revaluation is the process of adjusting the value of assets on a company's balance sheet to reflect their current market value.

    • Asset revaluation is typically done to ensure that the assets are not carried on the balance sheet at a value that is significantly different from their current market value.

    • Revaluation can result in an increase or decrease in the value of assets, which can impact the company's financial ...

  • Answered by AI

Interview Preparation Tips

Topics to prepare for Rio Tinto Advisor interview:
  • Fixed Assets
  • Depreciation
  • Amortization
  • Sale of fixed asset
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Recruitment Consulltant and was interviewed in Mar 2024. There was 1 interview round.

Round 1 - Technical 

(5 Questions)

  • Q1. Automation related questions basic of PLC like AB and Siemens make plc,encoder,pannel min earthing voltage, scada,starter software
  • Q2. Electrical maintenance related questions basics
  • Q3. What Is MTTR and MTBF
  • Ans. 

    MTTR stands for Mean Time To Repair and MTBF stands for Mean Time Between Failures.

    • MTTR is the average time taken to repair a failed component or system.

    • MTBF is the average time between failures of a component or system.

    • MTTR is calculated as total downtime divided by the number of failures.

    • MTBF is calculated as total uptime divided by the number of failures.

    • For example, if a system has an MTTR of 2 hours and an MTBF of...

  • Answered by AI
  • Q4. Substation related questions basics
  • Q5. What is data type,string in plc
  • Ans. 

    Data type string in PLC is used to store alphanumeric characters or text data.

    • String data type is used to store text data in PLC programming.

    • Strings can be used to store alphanumeric characters, words, sentences, etc.

    • Example: STRING name := 'John Smith';

  • Answered by AI

Skills evaluated in this interview

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. Which material to less ph?
  • Ans. 

    Acidic materials can be used to lower pH levels.

    • Use sulfuric acid to lower pH levels in water treatment processes.

    • Add citric acid to adjust pH in food and beverages.

    • Use vinegar (acetic acid) to lower pH in cooking recipes.

  • Answered by AI
  • Q2. Dm plant regeneration
Round 2 - HR 

(2 Questions)

  • Q1. Eductaion study
  • Q2. Why to join china steel
  • Ans. 

    China Steel offers a stable career with opportunities for growth and development in the steel industry.

    • China Steel is a reputable company with a strong presence in the steel industry.

    • Opportunities for career growth and development within the company.

    • Stable job security and benefits for employees.

    • Chance to work with cutting-edge technology and processes in the steel manufacturing sector.

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Salary
Interview experience
3
Average
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Apr 2024. There was 1 interview round.

Round 1 - One-on-one 

(3 Questions)

  • Q1. Sahre your views on job.
  • Q2. Technical knowledge about mineral plants
  • Q3. Legal subjects and authority handling

Interview Preparation Tips

Interview preparation tips for other job seekers - 1. Operation excellence.
2. Legal.
3. Maintenance knowledge
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Aptitude Test 

2 hours of psychometric test including English test

Round 2 - Technical 

(2 Questions)

  • Q1. Scenario based interview
  • Q2. Asked about codes, standards
Interview experience
3
Average
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Not Selected

I applied via Naukri.com and was interviewed before Jul 2021. There were 2 interview rounds.

Round 1 - HR 

(1 Question)

  • Q1. My self Navdeep Chahal. I'm working in Oswal castings pvt. Ltd as a engineer in business excellence. My responsibility to manage company all over safety, 5S, improvement through kaizen. Provide training to...
  • Ans. Better results related to safety management.
  • Answered Anonymously
Round 2 - Assignment 

Creating and updating of safety manuals, SOPs, WIs, OPLs, records for effective awareness in shop floor Safety

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - HR 

(2 Questions)

  • Q1. Tell me about yourself
  • Q2. What's your experience
Interview experience
3
Average
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
Not Selected

I applied via Walk-in and was interviewed in Oct 2023. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. Where do you see yourself after 5 years
  • Q2. Do you have knowledge of Solvent extraction plants
  • Ans. 

    Yes, I have knowledge of solvent extraction plants.

    • I have experience working with solvent extraction plants in my previous roles.

    • I am familiar with the process of extracting solvents from various materials.

    • I have knowledge of the equipment and machinery used in solvent extraction plants.

    • I understand the importance of safety protocols in solvent extraction processes.

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Rather then more technical interview turns towards commercial.

Syscon Wires Interview FAQs

How to prepare for Syscon Wires interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at Syscon Wires. The most common topics and skills that interviewers at Syscon Wires expect are Attendance Management, Background Verification, Bulk Hiring, Daily Operations and Exit Formalities.

Tell us how to improve this page.

Interview Questions from Similar Companies

Nava Limited Interview Questions
3.7
 • 18 Interviews
NLMK India Interview Questions
3.7
 • 16 Interviews
Imerys Interview Questions
3.9
 • 9 Interviews
Nagata India Interview Questions
4.0
 • 9 Interviews
Bradken India Interview Questions
4.5
 • 7 Interviews
Oswal Castings Interview Questions
3.9
 • 5 Interviews
View all

Syscon Wires Reviews and Ratings

based on 10 reviews

3.9/5

Rating in categories

4.1

Skill development

4.0

Work-life balance

3.2

Salary

3.4

Job security

4.1

Company culture

3.4

Promotions

4.1

Work satisfaction

Explore 10 Reviews and Ratings
Operations Executive
3 salaries
unlock blur

₹3 L/yr - ₹6 L/yr

Assistant Manager Quality
3 salaries
unlock blur

₹5.2 L/yr - ₹5.5 L/yr

Store Incharge
3 salaries
unlock blur

₹4.2 L/yr - ₹4.8 L/yr

Explore more salaries
Compare Syscon Wires with

African Industries

4.1
Compare

Nava Limited

3.8
Compare

Nagata India

4.0
Compare

Imerys

3.9
Compare
Did you find this page helpful?
Yes No
write
Share an Interview