Premium Employer

i

This company page is being actively managed by Suroj Buildcon Team. If you also belong to the team, you can get access from here

Suroj Buildcon Verified Tick

Compare button icon Compare button icon Compare

Filter interviews by

Suroj Buildcon Assistant Resident Engineer Interview Questions and Answers

Updated 22 Feb 2024

Suroj Buildcon Assistant Resident Engineer Interview Experiences

1 interview found

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
-
Result
Selected Selected

I appeared for an interview before Feb 2023.

Round 1 - Technical 

(1 Question)

  • Q1. Which IS code is following for mix design, cube test, slump test etc.
  • Ans. 

    IS code 10262 is followed for mix design, IS code 516 for cube test, IS code 1199 for slump test.

    • Mix design follows IS code 10262

    • Cube test follows IS code 516

    • Slump test follows IS code 1199

  • Answered by AI

Interview questions from similar companies

I applied via Company Website and was interviewed in Jun 2021. There was 1 interview round.

Interview Questionnaire 

2 Questions

  • Q1. Why you left from your current company? What is your job profile? How to manage all things? To whom reported? How many employee in your current & previous company? What was the roll in previous company? Ho...
  • Q2. What is your current job location. What is the project cost? How much percentage hike my salary? What is the leave policy, HR Policies extra .

Interview Preparation Tips

Interview preparation tips for other job seekers - What is the achievements in previous companies.

I applied via Naukri.com and was interviewed before Jan 2021. There were 3 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. Quality checking methods
  • Q2. Design reviews checking.

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident and answers only technically.

I applied via Referral and was interviewed before Jan 2021. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Mainly consantraint for pump and high temp lines and material.

Interview Preparation Tips

Interview preparation tips for other job seekers - As above questions mention
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
4-6 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed before Jun 2023. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. EHS Defination with explanation
  • Ans. 

    EHS stands for Environment, Health, and Safety. It refers to the laws, rules, standards, and programs that are designed to protect the health and safety of employees and the public as well as the environment.

    • EHS involves identifying and assessing risks in the workplace related to health, safety, and the environment.

    • It includes implementing measures to control and mitigate these risks, such as providing proper training,...

  • Answered by AI
  • Q2. BOCW Act with Factory Act

Interview Preparation Tips

Interview preparation tips for other job seekers - Good
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I appeared for an interview in Feb 2023.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(7 Questions)

  • Q1. Details of Procurement Process
  • Ans. 

    Procurement process involves identifying needs, selecting suppliers, negotiating contracts, and managing relationships.

    • Identify needs and requirements

    • Research and select potential suppliers

    • Negotiate terms and conditions

    • Create and sign contracts

    • Manage supplier relationships and performance

    • Monitor and evaluate procurement process effectiveness

  • Answered by AI
  • Q2. Understanding the material to be purchased
  • Q3. Suppliers database ans popular suppliers
  • Q4. Achievements in given project assignment
  • Q5. Supplier evaluation and selection process
  • Q6. Awareness of terms and conditions used in EPC projects
  • Q7. Integrity with internal stake holders
  • Ans. 

    Integrity with internal stakeholders is crucial for building trust and maintaining a positive work environment.

    • Communicate openly and honestly with colleagues and superiors

    • Respect confidentiality and avoid gossip or spreading rumors

    • Follow through on commitments and hold yourself accountable

    • Act with fairness and impartiality in decision-making

    • Admit mistakes and take responsibility for correcting them

    • Lead by example and

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - While attending the interview, keep your responses to the point.
Keep your involvement in your existing job and mark/ keep abreast on all such tiny issues, that will represent your strength for the required position.
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
4-6 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Nov 2023. There were 3 interview rounds.

Round 1 - HR 

(1 Question)

  • Q1. Introduction about yourself
  • Ans. I'm answering Smoothly about my self
  • Answered Anonymously
Round 2 - Technical 

(1 Question)

  • Q1. Technical Questions Like 1- Estimation and Costing 2- Rate Analysis 3- Planning and Praposal 4- Vendor Selection and Database 6- What do you mean by Hydrocarbon
Round 3 - Assignment 

1- Material Calculation
2- Bar bending Schedule
3- Planning and Chart
4- Making Praposal

Interview Preparation Tips

Interview preparation tips for other job seekers - 1- Special thing is that you should speak in English and be Confident.
2- Learn that before you to interview about which post you choose etc.

I applied via Company Website and was interviewed in Mar 2021. There were 5 interview rounds.

Interview Questionnaire 

5 Questions

  • Q1. Realted work
  • Q2. IS code amendments
  • Q3. Lab tests And relevant is codes
  • Q4. Feild tests and relevant IS codes
  • Q5. QMS - Breifing

Interview Preparation Tips

Interview preparation tips for other job seekers - Prepare well and go through your resume prior to interview.Fake it but atleast have technical knowledge
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Jul 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Telephonic Call 

(1 Question)

  • Q1. Offshore projects, Inch dia calculations, P&ID, Launcher receiver information, Piping fittings
Round 3 - One-on-one 

(1 Question)

  • Q1. Proposal estimation, offshore process, overall crude process

Interview Preparation Tips

Interview preparation tips for other job seekers - Go with politely. L&T peoples are very co-operative
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Campus Placement and was interviewed before Oct 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Will ask all related questions.
  • Q2. Do u know Piping engineering?
  • Ans. 

    Yes, I have knowledge in Piping engineering.

    • I have a degree in Mechanical Engineering which includes coursework in Piping design and analysis.

    • I have practical experience working on piping projects in my previous roles.

    • I am familiar with industry standards and codes related to piping engineering such as ASME B31.3 and API 570.

  • Answered by AI
Round 3 - HR 

(1 Question)

  • Q1. Expectation of salary, why job switch.

Suroj Buildcon Interview FAQs

How many rounds are there in Suroj Buildcon Assistant Resident Engineer interview?
Suroj Buildcon interview process usually has 1 rounds. The most common rounds in the Suroj Buildcon interview process are Technical.

Tell us how to improve this page.

Suroj Buildcon Assistant Resident Engineer Interview Process

based on 1 interview

Interview experience

4
  
Good
View more
Join Suroj Buildcon COMMITTED TO GO BEYOND

Interview Questions from Similar Companies

AECOM Interview Questions
4.2
 • 118 Interviews
Apco Infratech Interview Questions
3.7
 • 116 Interviews
Bechtel Interview Questions
3.9
 • 68 Interviews
Samsung E&A Interview Questions
4.0
 • 61 Interviews
Wood Group Interview Questions
3.8
 • 60 Interviews
Psp Projects Interview Questions
3.9
 • 51 Interviews
View all
Suroj Buildcon Assistant Resident Engineer Salary
based on 5 salaries
₹6.5 L/yr - ₹9.3 L/yr
19% less than the average Assistant Resident Engineer Salary in India
View more details

Suroj Buildcon Assistant Resident Engineer Reviews and Ratings

based on 3 reviews

4.5/5

Rating in categories

4.5

Skill development

4.5

Work-life balance

4.4

Salary

4.5

Job security

4.5

Company culture

3.7

Promotions

4.5

Work satisfaction

Explore 3 Reviews and Ratings
Safety Officer
73 salaries
unlock blur

₹2 L/yr - ₹5 L/yr

Junior Engineer
63 salaries
unlock blur

₹2 L/yr - ₹3.6 L/yr

Senior Engineer
55 salaries
unlock blur

₹4.1 L/yr - ₹9.5 L/yr

Junior Engineer Civil
42 salaries
unlock blur

₹2.2 L/yr - ₹4.4 L/yr

Quantity Surveyor
35 salaries
unlock blur

₹3 L/yr - ₹8.5 L/yr

Explore more salaries
Compare Suroj Buildcon with

AECOM

4.2
Compare

L&T Energy Hydrocarbon

3.9
Compare

Apco Infratech

3.7
Compare

Saipem

4.2
Compare
Did you find this page helpful?
Yes No
write
Share an Interview