Filter interviews by
I applied via Naukri.com and was interviewed in Jun 2022. There were 3 interview rounds.
Process Capability is the ability of a process to consistently produce products within specification limits.
It is a statistical measure of the ability of a process to produce output within specification limits
It is calculated using the process capability index (Cpk) which compares the process variability to the specification limits
A process with a Cpk value of 1 or higher is considered capable
Process Capability is impo...
Process capability index is a statistical measure of a process's ability to produce consistent results within specification limits.
Process capability index is used to evaluate the ability of a process to meet customer requirements.
It is calculated by dividing the specification width by the process width.
A process capability index of 1 indicates that the process is capable of producing within the specification limits.
A ...
APQP stands for Advanced Product Quality Planning. It is a structured approach to product development.
APQP is a process used in the automotive industry to ensure that new products meet customer requirements and are launched on time and within budget.
There are five phases of APQP: Planning and Program Definition, Product Design and Development, Process Design and Development, Product and Process Validation, and Launch, ...
PPAP stands for Production Part Approval Process. It is a standardized process in the automotive industry to ensure product quality.
PPAP is a set of documents and procedures used to demonstrate that a product meets customer requirements.
It includes documents such as control plans, design records, process flow diagrams, and measurement system analysis.
PPAP is typically required for new product introductions or when chan...
Control plan is a document that outlines the steps to be taken to ensure quality control during manufacturing.
It includes details on the process, inspection methods, and frequency of checks.
Types of control plans include Prototype, Pre-Launch, Production, and After-Launch.
Prototype control plans are used during the development phase, while Pre-Launch control plans are used before mass production.
Production control plan...
Supreme Group interview questions for popular designations
I was interviewed before Jul 2016.
I applied via Referral and was interviewed before Jul 2021. There were 3 interview rounds.
General information about electronic products which is used in daily life and technical questions related about the electronic equipments.
I applied via Referral and was interviewed before Sep 2017. There were 2 interview rounds.
I was interviewed in Apr 2017.
based on 81 reviews
Rating in categories
Engineer
10
salaries
| ₹0 L/yr - ₹0 L/yr |
Assistant Manager
7
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Engineer
7
salaries
| ₹0 L/yr - ₹0 L/yr |
Civil Site Engineer
7
salaries
| ₹0 L/yr - ₹0 L/yr |
Production Engineer
7
salaries
| ₹0 L/yr - ₹0 L/yr |
Reliance Industries
Tata Group
Adani Group
Bharti Enterprises