Filter interviews by
I was interviewed in Aug 2024.
I applied via Walk-in and was interviewed before Feb 2022. There were 2 interview rounds.
Top trending discussions
I was interviewed in Dec 2016.
I will communicate effectively, follow instructions, seek feedback, and collaborate with my supervisor.
Communicate regularly with supervisor to provide updates on progress and ask for clarification when needed
Follow instructions carefully and ask for help if unsure about a task
Seek feedback on my work to improve and grow professionally
Collaborate with supervisor and team members to achieve project goals
Provide suggesti
I applied via Campus Placement and was interviewed in Oct 2022. There were 2 interview rounds.
I applied via Campus Placement and was interviewed in Oct 2022. There were 3 interview rounds.
I applied via Indeed and was interviewed in Nov 2021. There was 1 interview round.
I was interviewed in Aug 2024.
Six Sigma is a data-driven methodology for improving processes by reducing defects and variation.
Six Sigma aims to achieve near-perfect quality by identifying and eliminating causes of defects or errors.
It uses statistical tools and techniques to measure and analyze process performance.
The goal of Six Sigma is to reduce variation and improve efficiency, ultimately leading to cost savings and customer satisfaction.
Compa...
Implemented a kaizen to streamline production process, reducing lead time by 20%.
Identified bottlenecks in the production process
Implemented visual management tools to track progress
Trained team members on new processes and best practices
Absenteeism and attrition can be controlled through various strategies such as improving work culture, offering competitive benefits, and providing opportunities for growth.
Improve work culture by promoting work-life balance and creating a positive work environment.
Offer competitive benefits such as health insurance, flexible work hours, and performance bonuses.
Provide opportunities for growth and development through t...
The OE Calculation Formula is used to determine the efficiency of a process or system.
OE (Overall Equipment) = (Operating Time - Downtime) / Operating Time
Operating Time is the total time the equipment is available for production.
Downtime is the total time the equipment is not available for production.
OE value ranges from 0 to 1, with 1 indicating perfect efficiency.
Example: OE = (500 hours - 50 hours) / 500 hours = 0.
I have 5 years of experience in sales, including managing a team and exceeding sales targets consistently.
Managed a team of 10 sales representatives
Exceeded sales targets by 20% for 3 consecutive years
Implemented new sales strategies that increased revenue by 30%
I applied via Approached by Company and was interviewed in Jul 2024. There were 6 interview rounds.
Different types of banners include vinyl banners, mesh banners, fabric banners, and retractable banners.
Vinyl banners are durable and weather-resistant, suitable for outdoor use.
Mesh banners are perforated for wind resistance, ideal for outdoor events.
Fabric banners are lightweight and can be easily transported, great for indoor displays.
Retractable banners are portable and easy to set up, perfect for trade shows and e
STeM apps are educational tools that focus on science, technology, engineering, and mathematics.
STeM apps provide interactive learning experiences for users
They often include simulations, quizzes, and tutorials to help users understand complex concepts
Examples of STeM apps include Khan Academy, Duolingo, and Codecademy
based on 2 interviews
Interview experience
based on 35 reviews
Rating in categories
Assistant Manager Quality
7
salaries
| ₹0 L/yr - ₹0 L/yr |
Production Manager
5
salaries
| ₹0 L/yr - ₹0 L/yr |
Merchant
5
salaries
| ₹0 L/yr - ₹0 L/yr |
Supervisor
5
salaries
| ₹0 L/yr - ₹0 L/yr |
Textile Engineer
4
salaries
| ₹0 L/yr - ₹0 L/yr |
ABC CORPORATION
Sunrise Technologies
Golden Gate Properties
Silver Star Logistics Services