I applied via Recruitment Consulltant and was interviewed in Nov 2024. There were 3 interview rounds.
I applied via Recruitment Consulltant and was interviewed in May 2024. There were 2 interview rounds.
Utility load shifting to DG manually involves following a standard operating procedure (SOP) to ensure smooth transition.
Ensure DG is in good working condition before shifting load
Isolate utility power source before transferring load to DG
Monitor DG performance during load shifting process
Gradually shift load to DG to prevent overload
Regularly check and maintain DG for optimal performance
Temperature refers to the degree of hotness or coldness of a body or environment, while humidity is the amount of water vapor present in the air.
Temperature is measured in degrees Celsius or Fahrenheit, while humidity is measured in percentage.
Temperature affects how hot or cold we feel, while humidity affects how sticky or dry the air feels.
High temperature with high humidity can make it feel hotter than it actually i...
Maintaining incident involves documenting, analyzing, and resolving issues to prevent recurrence. RCA stands for Root Cause Analysis.
Document all incidents in a log with details of what happened and how it was resolved
Analyze incidents to identify the root cause using techniques like 5 Whys or Fishbone Diagram
Implement corrective actions to prevent similar incidents from happening in the future
Regularly review incident...
Electrical safety refers to practices and measures taken to prevent electrical hazards and accidents.
Ensuring proper grounding of electrical systems
Using insulated tools and equipment
Implementing lockout/tagout procedures before working on electrical systems
Regular inspection and maintenance of electrical equipment
Training employees on electrical safety protocols
Following national and local electrical codes and regulat
I applied via Recruitment Consulltant and was interviewed in Sep 2023. There was 1 interview round.
I am currently monitoring a data center with a total IT load of 500 kW. The equivalent installed in the battery room for Hydrogen sensing is 50 sensors. We use a setup with a neutral breaker to ensure safety. UPS is loaded up to 80% capacity for optimal performance. Consumables are managed efficiently to reduce waste. The total buildup area I am managing is 10,000 square feet.
IT load of data center: 500 kW
Equivalent in...
Managing chiller plant involves understanding the chiller cycle, as well as the functions of turbocharger and governor in DG sets.
Chiller plant management involves monitoring and controlling the chiller cycle to ensure efficient cooling of a building or facility.
The chiller cycle consists of four main components: evaporator, compressor, condenser, and expansion valve. Refrigerant circulates through these components to ...
I applied via LinkedIn and was interviewed before Dec 2023. There was 1 interview round.
STT Global Data Centres India interview questions for popular designations
I applied via Recruitment Consulltant and was interviewed in Sep 2022. There were 2 interview rounds.
A receptionist is responsible for greeting visitors, answering phone calls, and directing inquiries to the appropriate person or department.
Greeting visitors and directing them to the appropriate person or department
Answering phone calls and transferring them to the correct department or person
Providing information to visitors and callers
Maintaining a clean and organized reception area
Assisting with administrative task...
Get interview-ready with Top STT Global Data Centres India Interview Questions
I applied via Referral and was interviewed before Apr 2022. There were 4 interview rounds.
I applied via Naukri.com and was interviewed in Oct 2021. There was 1 interview round.
Building Management System (BMS) is a facility that allows centralized control and monitoring of various building systems.
BMS enables efficient management of HVAC systems, lighting, security, and other building systems.
It provides real-time monitoring and control of energy consumption, optimizing energy efficiency.
BMS helps in identifying and resolving issues quickly, improving maintenance and reducing downtime.
It allo...
I applied via Referral and was interviewed in Mar 2021. There was 1 interview round.
I applied via Recruitment Consultant and was interviewed before Aug 2020. There were 3 interview rounds.
Top trending discussions
Some of the top questions asked at the STT Global Data Centres India interview -
based on 6 interviews
Interview experience
based on 180 reviews
Rating in categories
5-10 Yrs
Not Disclosed
Shift Engineer
72
salaries
| ₹2.5 L/yr - ₹7 L/yr |
Assistant Manager
52
salaries
| ₹5.5 L/yr - ₹17.5 L/yr |
Associate Engineer
43
salaries
| ₹1.5 L/yr - ₹4 L/yr |
Data Center Engineer
33
salaries
| ₹2.2 L/yr - ₹4.5 L/yr |
BMS Engineer
21
salaries
| ₹2.3 L/yr - ₹5.1 L/yr |
CtrlS
Web Werks
Nxtgen Datacenter Cloud Technologies
Sify Technologies