Filter interviews by
Clear (1)
I applied via Recruitment Consulltant and was interviewed in May 2024. There were 2 interview rounds.
Utility load shifting to DG manually involves following a standard operating procedure (SOP) to ensure smooth transition.
Ensure DG is in good working condition before shifting load
Isolate utility power source before transferring load to DG
Monitor DG performance during load shifting process
Gradually shift load to DG to prevent overload
Regularly check and maintain DG for optimal performance
Temperature refers to the degree of hotness or coldness of a body or environment, while humidity is the amount of water vapor present in the air.
Temperature is measured in degrees Celsius or Fahrenheit, while humidity is measured in percentage.
Temperature affects how hot or cold we feel, while humidity affects how sticky or dry the air feels.
High temperature with high humidity can make it feel hotter than it actually i...
Maintaining incident involves documenting, analyzing, and resolving issues to prevent recurrence. RCA stands for Root Cause Analysis.
Document all incidents in a log with details of what happened and how it was resolved
Analyze incidents to identify the root cause using techniques like 5 Whys or Fishbone Diagram
Implement corrective actions to prevent similar incidents from happening in the future
Regularly review incident...
Electrical safety refers to practices and measures taken to prevent electrical hazards and accidents.
Ensuring proper grounding of electrical systems
Using insulated tools and equipment
Implementing lockout/tagout procedures before working on electrical systems
Regular inspection and maintenance of electrical equipment
Training employees on electrical safety protocols
Following national and local electrical codes and regulat
Top trending discussions
posted on 28 Sep 2023
I was interviewed before Sep 2022.
I applied via Company Website and was interviewed before Aug 2021. There were 2 interview rounds.
The backup port number for SQL is 1433.
The default backup port number for SQL is 1433.
This port number can be changed during installation or configuration.
It is important to ensure that the backup port is open and accessible for backup and restore operations.
posted on 27 Nov 2023
I applied via Naukri.com and was interviewed before Nov 2022. There were 3 interview rounds.
Discussing about troubleshooting process in NOC.
I applied via Naukri.com and was interviewed in Jan 2023. There were 6 interview rounds.
Testing procedures for piping and duct involve pressure testing, leak testing, and visual inspection.
Pressure testing involves pressurizing the system with air or water to check for leaks.
Leak testing can be done using soap solution or electronic leak detectors.
Visual inspection includes checking for proper installation, support, and connections.
Testing procedures should follow industry standards and regulations.
Docume...
Fire pump room is designed to provide water supply at high pressure to the sprinkler system in case of fire emergency.
Fire pump room houses pumps that are capable of delivering water at high pressure to the sprinkler system
The pumps are usually powered by electricity or diesel engines
The room is equipped with controllers and alarms to monitor and control the water flow
Regular maintenance and testing of the pumps are es...
Insulation material specification includes type, thickness, density, and thermal conductivity.
Specify the type of insulation material (e.g. fiberglass, foam, mineral wool)
Provide the thickness of the insulation material in inches or millimeters
Include the density of the insulation material in pounds per cubic foot or kilograms per cubic meter
State the thermal conductivity of the insulation material in BTU/(hr*ft*F) or
The steel weight refers to the weight of steel used in a construction project.
Steel weight is calculated based on the design and specifications of the project.
It is important to accurately estimate the steel weight to ensure structural integrity.
Reconciliation of raw material involves comparing the actual usage of steel with the planned usage.
This helps identify any discrepancies or wastage in the steel consumption.
Ste...
posted on 20 Mar 2023
I applied via Naukri.com and was interviewed in Nov 2022. There were 5 interview rounds.
posted on 8 May 2024
I applied via Naukri.com and was interviewed in Apr 2024. There were 2 interview rounds.
Reasoning logical apti
Python, linux , networking
posted on 25 May 2022
I applied via Naukri.com and was interviewed before May 2021. There was 1 interview round.
posted on 1 Apr 2023
I applied via Approached by Company and was interviewed before Apr 2022. There were 2 interview rounds.
To improve network availability in 4G architecture, we can implement redundancy, load balancing, and network optimization techniques.
Implementing redundancy by adding backup components such as routers, switches, and servers to ensure network availability in case of failure.
Load balancing can be achieved by distributing network traffic across multiple servers to prevent overloading of a single server.
Network optimizatio...
SMPS stands for Switched Mode Power Supply. It converts AC to DC voltage using high-frequency switching.
SMPS uses a high-frequency switching circuit to convert AC to DC voltage
It is more efficient than traditional linear power supplies
New rollouts can be deployed by following a structured project management approach
This includes planning, testing, and implementation phases
Regular communication with stakeholders is impo
One problem faced in the operation of network is frequent network outages.
Frequent network outages disrupt the workflow and productivity.
It leads to communication breakdown and delays in completing tasks.
Network outages can result in loss of important data and affect customer satisfaction.
Troubleshooting network issues takes time and resources.
Implementing backup systems and redundancy can help mitigate the impact of n
based on 1 interview
Interview experience
Shift Engineer
72
salaries
| ₹0 L/yr - ₹0 L/yr |
Assistant Manager
52
salaries
| ₹0 L/yr - ₹0 L/yr |
Associate Engineer
43
salaries
| ₹0 L/yr - ₹0 L/yr |
Data Center Engineer
33
salaries
| ₹0 L/yr - ₹0 L/yr |
BMS Engineer
21
salaries
| ₹0 L/yr - ₹0 L/yr |
CtrlS
Web Werks
Nxtgen Datacenter Cloud Technologies
Sify Technologies