Upload Button Icon Add office photos

Filter interviews by

STT Global Data Centres India Assistant Manager Interview Questions and Answers

Updated 30 Oct 2023

STT Global Data Centres India Assistant Manager Interview Experiences

2 interviews found

Interview experience
3
Average
Difficulty level
Moderate
Process Duration
More than 8 weeks
Result
Not Selected

I applied via Recruitment Consulltant and was interviewed in Sep 2023. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. What is the IT load of data center you currently monitoring? What is the equivalent installed in battery room for Hydrogen sensing? What setup used to break the neutral of data center? Why we load UPS upto...
  • Ans. 

    I am currently monitoring a data center with a total IT load of 500 kW. The equivalent installed in the battery room for Hydrogen sensing is 50 sensors. We use a setup with a neutral breaker to ensure safety. UPS is loaded up to 80% capacity for optimal performance. Consumables are managed efficiently to reduce waste. The total buildup area I am managing is 10,000 square feet.

    • IT load of data center: 500 kW

    • Equivalent in...

  • Answered by AI
  • Q2. How you Managing chiller plant? What is the chiller cycle? What is the function of turbocharger in DG sets? What is the function of governor in DG sets?
  • Ans. 

    Managing chiller plant involves understanding the chiller cycle, as well as the functions of turbocharger and governor in DG sets.

    • Chiller plant management involves monitoring and controlling the chiller cycle to ensure efficient cooling of a building or facility.

    • The chiller cycle consists of four main components: evaporator, compressor, condenser, and expansion valve. Refrigerant circulates through these components to ...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Prepare about your current site too alongwith the technical knowledge before interview

I applied via Recruitment Consultant and was interviewed before Aug 2020. There were 3 interview rounds.

Interview Questionnaire 

3 Questions

  • Q1. More technical about data center operations
  • Q2. Chiller operation
  • Q3. IBMS operation

Interview Preparation Tips

Interview preparation tips for other job seekers - Technically preparation required

Assistant Manager Interview Questions Asked at Other Companies

asked in Axis Bank
Q1. You are Handling cash operations then how you manage operations w ... read more
asked in JSW Steel
Q2. 1. Whats is Cooling tower performance aspects, Vacuume breaker us ... read more
asked in Jio
Q3. What are the different layers of OSI model?
asked in Adani Group
Q4. What IS Codes do you follow for structural steel fabrication and ... read more
Q5. Why is SAS used of there are other open source tools available?

Interview questions from similar companies

Assistant Manager Interview Questions & Answers

VDart user image Chakravarthy Namasivayam

posted on 16 Aug 2023

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed before Aug 2022. There were 4 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(1 Question)

  • Q1. Brief explanation on our resume
Round 3 - Technical 

(2 Questions)

  • Q1. Finance background questions
  • Q2. Basic Journal entries
Round 4 - HR 

(1 Question)

  • Q1. Final level discussion

Interview Preparation Tips

Topics to prepare for VDart Assistant Manager interview:
  • Basic Accountacy
  • Corporate Communication
  • Email ettique
Interview preparation tips for other job seekers - Always give your answers in a polite manner with accuracy.

Assistant Manager Interview Questions & Answers

VDart user image Chakravarthy Namasivayam

posted on 16 Aug 2023

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed before Aug 2022. There were 4 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - HR 

(1 Question)

  • Q1. Brief explanation on our resume
Round 3 - Technical 

(2 Questions)

  • Q1. Finance background questions
  • Q2. Basic Journal entries
Round 4 - HR 

(1 Question)

  • Q1. Final level discussion

Interview Preparation Tips

Topics to prepare for VDart Assistant Manager interview:
  • Basic Accountacy
  • Corporate Communication
  • Email ettique
Interview preparation tips for other job seekers - Always give your answers in a polite manner with accuracy.

STT Global Data Centres India Interview FAQs

How many rounds are there in STT Global Data Centres India Assistant Manager interview?
STT Global Data Centres India interview process usually has 2 rounds. The most common rounds in the STT Global Data Centres India interview process are Resume Shortlist and Technical.
What are the top questions asked in STT Global Data Centres India Assistant Manager interview?

Some of the top questions asked at the STT Global Data Centres India Assistant Manager interview -

  1. What is the IT load of data center you currently monitoring? What is the equiva...read more
  2. How you Managing chiller plant? What is the chiller cycle? What is the function...read more
  3. More technical about data center operati...read more

Tell us how to improve this page.

STT Global Data Centres India Assistant Manager Interview Process

based on 1 interview

Interview experience

3
  
Average
View more

Interview Questions from Similar Companies

Sify Technologies Interview Questions
3.9
 • 121 Interviews
Magic Edtech Interview Questions
3.1
 • 49 Interviews
Affine Interview Questions
3.3
 • 48 Interviews
Cyfuture Interview Questions
2.9
 • 45 Interviews
Revature Interview Questions
3.5
 • 39 Interviews
IT By Design Interview Questions
4.0
 • 39 Interviews
View all
STT Global Data Centres India Assistant Manager Salary
based on 52 salaries
₹5.5 L/yr - ₹17.5 L/yr
50% more than the average Assistant Manager Salary in India
View more details

STT Global Data Centres India Assistant Manager Reviews and Ratings

based on 10 reviews

4.4/5

Rating in categories

4.3

Skill development

4.0

Work-life balance

4.4

Salary

4.5

Job security

4.0

Company culture

3.7

Promotions

3.9

Work satisfaction

Explore 10 Reviews and Ratings
Shift Engineer
73 salaries
unlock blur

₹2.5 L/yr - ₹7 L/yr

Assistant Manager
52 salaries
unlock blur

₹5.5 L/yr - ₹17.5 L/yr

Associate Engineer
43 salaries
unlock blur

₹1.5 L/yr - ₹4 L/yr

Data Center Engineer
33 salaries
unlock blur

₹2.2 L/yr - ₹4.5 L/yr

BMS Engineer
21 salaries
unlock blur

₹2.3 L/yr - ₹5.1 L/yr

Explore more salaries
Compare STT Global Data Centres India with

CtrlS

3.8
Compare

Web Werks

2.6
Compare

Nxtgen Datacenter Cloud Technologies

3.7
Compare

Sify Technologies

3.9
Compare
Did you find this page helpful?
Yes No
write
Share an Interview