Q1. What kind of quality of sand required for rcc work?

Ans.

The sand required for RCC work should have specific qualities to ensure strength and durability.

  • The sand should be clean and free from impurities like clay, silt, and organic matter.

  • It should have a proper gradation with a mix of coarse and fine particles.

  • The sand should have a low moisture content to prevent shrinkage and cracking.

  • It should have good bonding properties to ensure proper adhesion with cement and aggregates.

  • The sand should be well-graded and have a high compres...read more

View 1 answer

Q2. How to use m20 concrete in any rcc work?

Ans.

M20 concrete is commonly used in RCC (Reinforced Cement Concrete) work. It has a mix ratio of 1:1.5:3 (cement:sand:aggregate) and a compressive strength of 20 MPa.

  • Prepare the required quantity of materials - cement, sand, and aggregate.

  • Mix the cement, sand, and aggregate in the ratio of 1:1.5:3.

  • Add water gradually and mix thoroughly until a uniform consistency is achieved.

  • Pour the M20 concrete mixture into the desired formwork or mold.

  • Compact the concrete using appropriate to...read more

Add your answer

Q3. How can we check Plastering work?

Ans.

Plastering work can be checked by examining the surface for smoothness, uniformity, and adhesion.

  • Inspect the plastered surface for any cracks, unevenness, or bulges.

  • Check for uniform thickness of plaster throughout the area.

  • Ensure proper adhesion of plaster to the underlying surface.

  • Look for any signs of peeling or flaking of plaster.

  • Verify that the plaster has been applied as per the specified mix ratio.

  • Use a straight edge or level to check for any deviations from the desire...read more

Add your answer

Q4. Rates for building labor work of different items?

Ans.

The rates for building labor work of different items vary based on factors such as location, complexity, and market demand.

  • Labor rates for building work can vary significantly depending on the type of work being done.

  • Factors that can influence labor rates include the location of the project, the complexity of the work, and the current market demand for skilled labor.

  • For example, the labor rate for carpentry work may be different from the labor rate for plumbing work.

  • It is imp...read more

Add your answer
Discover Turnaround International interview dos and don'ts from real experiences

Q5. How calculate steel quantity?

Ans.

Steel quantity can be calculated by using the formula: (D^2/162) x Length of steel

  • Determine the diameter of the steel

  • Calculate the length of the steel required

  • Use the formula (D^2/162) x Length of steel to calculate the steel quantity

  • For example, if the diameter of the steel is 12mm and the length required is 10m, the steel quantity would be (12^2/162) x 10 = 8.89 kg

Add your answer

Q6. How to measure wood work?

Ans.

Wood work can be measured using various tools and techniques.

  • Use a tape measure to measure the length, width, and height of the woodwork.

  • Use a square to ensure the corners are at right angles.

  • Use a level to check if the woodwork is straight and level.

  • Use a caliper to measure the thickness of the wood.

  • Use a protractor to measure angles if necessary.

  • Consider the tolerance and allowances specified in the design or project requirements.

Add your answer

Q7. Different kinds of cement?

Ans.

Different kinds of cement include Portland cement, white cement, rapid hardening cement, and low heat cement.

  • Portland cement is the most common type of cement used in construction.

  • White cement is used for architectural purposes and to create decorative finishes.

  • Rapid hardening cement sets quickly and is used in projects that require early strength gain.

  • Low heat cement generates less heat during hydration and is suitable for large concrete structures.

Add your answer

Q8. Ratio for m20 and m25

Ans.

The ratio for M20 and M25 concrete mix is 1:1.5:3 and 1:1:2 respectively.

  • The ratio for M20 concrete mix is 1 part cement : 1.5 parts sand : 3 parts aggregate.

  • The ratio for M25 concrete mix is 1 part cement : 1 part sand : 2 parts aggregate.

  • The ratio represents the proportion of cement, sand, and aggregate in the concrete mix.

  • For example, for M20 mix, if you have 1 bag of cement, you will need 1.5 bags of sand and 3 bags of aggregate.

Add your answer
Contribute & help others!
Write a review
Share interview
Contribute salary
Add office photos
Interview Tips & Stories
Ace your next interview with expert advice and inspiring stories

Top Site Engineer Interview Questions from Similar Companies

4.0
 • 28 Interview Questions
4.0
 • 20 Interview Questions
4.0
 • 11 Interview Questions
4.2
 • 11 Interview Questions
View all
Share an Interview
Stay ahead in your career. Get AmbitionBox app
qr-code
Helping over 1 Crore job seekers every month in choosing their right fit company
70 Lakh+

Reviews

5 Lakh+

Interviews

4 Crore+

Salaries

1 Cr+

Users/Month

Contribute to help millions
Get AmbitionBox app

Made with ❤️ in India. Trademarks belong to their respective owners. All rights reserved © 2024 Info Edge (India) Ltd.

Follow us
  • Youtube
  • Instagram
  • LinkedIn
  • Facebook
  • Twitter