  • Q1. How to use m20 concrete in any rcc work?
  • Ans. 

    M20 concrete is commonly used in RCC (Reinforced Cement Concrete) work. It has a mix ratio of 1:1.5:3 (cement:sand:aggregate) and a compressive strength of 20 MPa.

    • Prepare the required quantity of materials - cement, sand, and aggregate.

    • Mix the cement, sand, and aggregate in the ratio of 1:1.5:3.

    • Add water gradually and mix thoroughly until a uniform consistency is achieved.

    • Pour the M20 concrete mixture into the desired ...

  • Answered by AI
  • Q2. How calculate steel quantity?
  • Ans. 

    Steel quantity can be calculated by using the formula: (D^2/162) x Length of steel

    • Determine the diameter of the steel

    • Calculate the length of the steel required

    • Use the formula (D^2/162) x Length of steel to calculate the steel quantity

    • For example, if the diameter of the steel is 12mm and the length required is 10m, the steel quantity would be (12^2/162) x 10 = 8.89 kg

  • Answered by AI
  • Q3. Different kinds of cement?
  • Ans. 

    Different kinds of cement include Portland cement, white cement, rapid hardening cement, and low heat cement.

    • Portland cement is the most common type of cement used in construction.

    • White cement is used for architectural purposes and to create decorative finishes.

    • Rapid hardening cement sets quickly and is used in projects that require early strength gain.

    • Low heat cement generates less heat during hydration and is suitabl

  • Answered by AI
  • Q4. Ratio for m20 and m25
  • Ans. 

    The ratio for M20 and M25 concrete mix is 1:1.5:3 and 1:1:2 respectively.

    • The ratio for M20 concrete mix is 1 part cement : 1.5 parts sand : 3 parts aggregate.

    • The ratio for M25 concrete mix is 1 part cement : 1 part sand : 2 parts aggregate.

    • The ratio represents the proportion of cement, sand, and aggregate in the concrete mix.

    • For example, for M20 mix, if you have 1 bag of cement, you will need 1.5 bags of sand and 3 bag

  • Answered by AI
  • Q5. How can we check Plastering work?
  • Ans. 

    Plastering work can be checked by examining the surface for smoothness, uniformity, and adhesion.

    • Inspect the plastered surface for any cracks, unevenness, or bulges.

    • Check for uniform thickness of plaster throughout the area.

    • Ensure proper adhesion of plaster to the underlying surface.

    • Look for any signs of peeling or flaking of plaster.

    • Verify that the plaster has been applied as per the specified mix ratio.

    • Use a straight...

  • Answered by AI
  • Q6. What kind of quality of sand required for rcc work?
  • Ans. 

    The sand required for RCC work should have specific qualities to ensure strength and durability.

    • The sand should be clean and free from impurities like clay, silt, and organic matter.

    • It should have a proper gradation with a mix of coarse and fine particles.

    • The sand should have a low moisture content to prevent shrinkage and cracking.

    • It should have good bonding properties to ensure proper adhesion with cement and aggrega...

  • Answered by AI
  • Q7. Rates for building labor work of different items?
  • Ans. 

    The rates for building labor work of different items vary based on factors such as location, complexity, and market demand.

    • Labor rates for building work can vary significantly depending on the type of work being done.

    • Factors that can influence labor rates include the location of the project, the complexity of the work, and the current market demand for skilled labor.

    • For example, the labor rate for carpentry work may be...

  • Answered by AI
  • Q8. How to measure wood work?
  • Ans. 

    Wood work can be measured using various tools and techniques.

    • Use a tape measure to measure the length, width, and height of the woodwork.

    • Use a square to ensure the corners are at right angles.

    • Use a level to check if the woodwork is straight and level.

    • Use a caliper to measure the thickness of the wood.

    • Use a protractor to measure angles if necessary.

    • Consider the tolerance and allowances specified in the design or project

  • Answered by AI

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Not Selected

I applied via LinkedIn and was interviewed in Jul 2024. There were 7 interview rounds.

Round 1 - Aptitude Test 

If vinay is 6 months old, how much old is his younger brother, 6 years different

Round 2 - Assignment 

About civil engineering, structure engineering, construction, bill of materials

Round 3 - Group Discussion 

About concrete, pro and cons

Round 4 - Assignment 

About Design Concrete

Round 5 - Case Study 

Case study leaning tower of pissa

Round 6 - HR 

(2 Questions)

  • Q1. What's your name
  • Ans. 

    My name is John Smith.

    • My first name is John

    • My last name is Smith

    • I go by the name John Smith

  • Answered by AI
  • Q2. When did you complete BE
Round 7 - Technical 

(2 Questions)

  • Q1. What's your name
  • Ans. 

    My name is John Smith.

    • Full name is John Smith

    • Common name

    • No middle name or initial

  • Answered by AI
  • Q2. How old are you
  • Ans. 

    I am 28 years old.

    • I am currently 28 years old.

    • My age is 28.

    • I was born in 1993.

  • Answered by AI
Interview experience
2
Poor
Difficulty level
-
Process Duration
-
Result
-
Round 1 - One-on-one 

(2 Questions)

  • Q1. Trouble shooting
  • Q2. Monitoring log dob maven

Interview Preparation Tips

Interview preparation tips for other job seekers - prepare well
Interview experience
2
Poor
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. Oops concepts php
  • Q2. Aggregate function php
Interview experience
3
Average
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(1 Question)

  • Q1. HDD related Fttx
Round 2 - HR 

(1 Question)

  • Q1. Expected CTC Why you want to join the company
Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Recruitment Consulltant and was interviewed in Jul 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(5 Questions)

  • Q1. SURVEY, GRADE of concrete
  • Q2. Are U join my company
  • Q3. Yes, I'm interested in your company
  • Q4. I'm join your company
  • Q5. What are you doing now in Tech Mahindra company

Interview Preparation Tips

Topics to prepare for Tech Mahindra Site Engineer interview:
  • Diploma
  • Construction
  • Survey
Interview preparation tips for other job seekers - No share data other company, I'm interested to join your meeting 🤝
Interview experience
1
Bad
Difficulty level
Hard
Process Duration
More than 8 weeks
Result
No response

I applied via LinkedIn and was interviewed before Jan 2022. There were 2 interview rounds.

Round 1 - Aptitude Test 

Hard to learn what they wanted

Round 2 - One-on-one 

(2 Questions)

  • Q1. What is your greatest weakness
  • Q2. How will you add value to our team

Interview Preparation Tips

Interview preparation tips for other job seekers - Was rough for a new person out of school and the experience required was difficult to meet

I applied via Recruitment Consultant and was interviewed before Dec 2020. There was 1 interview round.

Interview Questionnaire 

3 Questions

  • Q1. Pointer usages.
  • Q2. Stack implementation
  • Q3. Multi process

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident, and have open thought.
Interview experience
3
Average
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Aptitude Test 

Aptitude n reasoning

Round 2 - Coding Test 

Basic DSA questions, like prime numbers

Interview Questionnaire 

1 Question

  • Q1. [07/04, 1:22 PM] kamalrAj: Un akka metar video venuma da [07/04, 1:29 PM] kamalrAj: Un akkava poyi kelu daaaa..... [07/04, 1:31 PM] kamalrAj: Un nilamai ninaicha vadivel mosama Irukumula

Sthapatya Consultants Interview FAQs

What are the top questions asked in Sthapatya Consultants Site Engineer interview?

Some of the top questions asked at the Sthapatya Consultants Site Engineer interview -

  1. What kind of quality of sand required for rcc wor...read more
  2. How to use m20 concrete in any rcc wor...read more
  3. How can we check Plastering wor...read more

Tell us how to improve this page.

Software Developer
9 salaries
unlock blur

₹3 L/yr - ₹8.5 L/yr

Surveyor
7 salaries
unlock blur

₹2.4 L/yr - ₹3.8 L/yr

Senior Software Developer
5 salaries
unlock blur

₹3.6 L/yr - ₹6 L/yr

Software Engineer
4 salaries
unlock blur

₹2.5 L/yr - ₹6.2 L/yr

Junior Software Developer
4 salaries
unlock blur

₹1.8 L/yr - ₹4 L/yr

Explore more salaries
Compare Sthapatya Consultants with

Edifice Consultants

3.6
Compare

Design Forum International

4.1
Compare

CP Kukreja Architects

4.0
Compare

Morphogenesis

3.5
Compare
Did you find this page helpful?
Yes No
write
Share an Interview