M20 concrete is commonly used in RCC (Reinforced Cement Concrete) work. It has a mix ratio of 1:1.5:3 (cement:sand:aggregate) and a compressive strength of 20 MPa.
Prepare the required quantity of materials - cement, sand, and aggregate.
Mix the cement, sand, and aggregate in the ratio of 1:1.5:3.
Add water gradually and mix thoroughly until a uniform consistency is achieved.
Pour the M20 concrete mixture into the desired ...
Steel quantity can be calculated by using the formula: (D^2/162) x Length of steel
Determine the diameter of the steel
Calculate the length of the steel required
Use the formula (D^2/162) x Length of steel to calculate the steel quantity
For example, if the diameter of the steel is 12mm and the length required is 10m, the steel quantity would be (12^2/162) x 10 = 8.89 kg
Different kinds of cement include Portland cement, white cement, rapid hardening cement, and low heat cement.
Portland cement is the most common type of cement used in construction.
White cement is used for architectural purposes and to create decorative finishes.
Rapid hardening cement sets quickly and is used in projects that require early strength gain.
Low heat cement generates less heat during hydration and is suitabl
The ratio for M20 and M25 concrete mix is 1:1.5:3 and 1:1:2 respectively.
The ratio for M20 concrete mix is 1 part cement : 1.5 parts sand : 3 parts aggregate.
The ratio for M25 concrete mix is 1 part cement : 1 part sand : 2 parts aggregate.
The ratio represents the proportion of cement, sand, and aggregate in the concrete mix.
For example, for M20 mix, if you have 1 bag of cement, you will need 1.5 bags of sand and 3 bag
Plastering work can be checked by examining the surface for smoothness, uniformity, and adhesion.
Inspect the plastered surface for any cracks, unevenness, or bulges.
Check for uniform thickness of plaster throughout the area.
Ensure proper adhesion of plaster to the underlying surface.
Look for any signs of peeling or flaking of plaster.
Verify that the plaster has been applied as per the specified mix ratio.
Use a straight...
The sand required for RCC work should have specific qualities to ensure strength and durability.
The sand should be clean and free from impurities like clay, silt, and organic matter.
It should have a proper gradation with a mix of coarse and fine particles.
The sand should have a low moisture content to prevent shrinkage and cracking.
It should have good bonding properties to ensure proper adhesion with cement and aggrega...
The rates for building labor work of different items vary based on factors such as location, complexity, and market demand.
Labor rates for building work can vary significantly depending on the type of work being done.
Factors that can influence labor rates include the location of the project, the complexity of the work, and the current market demand for skilled labor.
For example, the labor rate for carpentry work may be...
Wood work can be measured using various tools and techniques.
Use a tape measure to measure the length, width, and height of the woodwork.
Use a square to ensure the corners are at right angles.
Use a level to check if the woodwork is straight and level.
Use a caliper to measure the thickness of the wood.
Use a protractor to measure angles if necessary.
Consider the tolerance and allowances specified in the design or project
Top trending discussions
I applied via LinkedIn and was interviewed in Jul 2024. There were 7 interview rounds.
If vinay is 6 months old, how much old is his younger brother, 6 years different
About civil engineering, structure engineering, construction, bill of materials
About concrete, pro and cons
About Design Concrete
Case study leaning tower of pissa
My name is John Smith.
My first name is John
My last name is Smith
I go by the name John Smith
My name is John Smith.
Full name is John Smith
Common name
No middle name or initial
I am 28 years old.
I am currently 28 years old.
My age is 28.
I was born in 1993.
I applied via Recruitment Consulltant and was interviewed in Jul 2022. There were 2 interview rounds.
I applied via LinkedIn and was interviewed before Jan 2022. There were 2 interview rounds.
Hard to learn what they wanted
I applied via Recruitment Consultant and was interviewed before Dec 2020. There was 1 interview round.
Aptitude n reasoning
Basic DSA questions, like prime numbers
Software Developer
9
salaries
| ₹3 L/yr - ₹8.5 L/yr |
Surveyor
7
salaries
| ₹2.4 L/yr - ₹3.8 L/yr |
Senior Software Developer
5
salaries
| ₹3.6 L/yr - ₹6 L/yr |
Software Engineer
4
salaries
| ₹2.5 L/yr - ₹6.2 L/yr |
Junior Software Developer
4
salaries
| ₹1.8 L/yr - ₹4 L/yr |
Edifice Consultants
Design Forum International
CP Kukreja Architects
Morphogenesis