I applied via Approached by Company and was interviewed before Apr 2022. There were 4 interview rounds.
Managed projects with challenges solved and process improvement initiative
Managed a software development project with a tight deadline and limited resources
Challenges faced included scope creep and communication issues with stakeholders
Solved challenges by implementing agile methodologies and holding regular meetings with stakeholders
Initiated a process improvement by introducing a project management tool to streamline
Challenges faced, process improvement ideas, and use case discussion for Project Manager role
Challenges faced: managing stakeholder expectations, resource allocation, and project scope
Process improvement ideas: implementing agile methodologies, automating manual processes, and improving communication channels
Use case discussion: discussing a recent project and identifying areas for improvement based on feedback from st
Top trending discussions
posted on 4 Jul 2024
Project management and project planning
The NPD process with full project involves stages from idea generation to product launch.
Idea generation and screening
Concept development and testing
Business analysis
Prototype development
Market testing
Commercialization
posted on 6 May 2024
I applied via Campus Placement
I applied via Naukri.com and was interviewed before May 2022. There were 2 interview rounds.
APQP has five stages: Planning, Product Design, Process Design, Product and Process Validation, and Launch, Assessment and Corrective Action.
Stage 1: Planning - Define the project scope, objectives, and requirements.
Stage 2: Product Design - Develop the product design and engineering specifications.
Stage 3: Process Design - Develop the manufacturing process and control plan.
Stage 4: Product and Process Validation - Ver...
Gate audit is a review process to ensure that a project has met specific criteria before proceeding to the next phase.
Gate audit is conducted at the end of each project phase to ensure that the project is on track and meets the predefined criteria.
It involves a review of project deliverables, budget, schedule, and risks to ensure that they are in line with the project plan.
The gate audit process helps to identify poten...
There are three types of corner units: L-shaped, U-shaped, and diagonal. Sizes vary depending on the specific unit.
L-shaped corner units have two sides that meet at a right angle.
U-shaped corner units have three sides that meet at right angles.
Diagonal corner units are used to connect two non-adjacent sides at an angle.
Sizes can vary based on the specific unit and manufacturer.
I applied via Referral and was interviewed before Aug 2022. There were 3 interview rounds.
I applied via Referral and was interviewed before Mar 2023. There was 1 interview round.
Takt time is calculated by dividing the available production time by the customer demand.
Calculate the total available production time in a specified period (e.g. 1 day)
Determine the customer demand for the same period
Divide the total available production time by the customer demand to get the takt time
Takt Time = Total Production Time / Customer Demand
Line balancing is the process of assigning tasks to workstations in a way that evens out the workload and maximizes efficiency.
Identify the tasks required to complete a process
Determine the cycle time for each task
Assign tasks to workstations based on cycle time and workload
Ensure that workstations are balanced to avoid bottlenecks
Regularly review and adjust the line balancing to optimize efficiency
Capacity analysis involves evaluating the ability of a system or process to handle a certain amount of workload or demand.
Identify the key components of the system or process that contribute to its capacity
Collect data on the current workload or demand placed on the system
Use mathematical models or simulations to predict how the system will perform under different levels of workload
Consider factors such as resource ava...
I applied via Company Website and was interviewed before Aug 2019. There was 1 interview round.
I have 3 years of experience in lean manufacturing, focusing on process improvement and waste reduction.
Implemented lean manufacturing principles to optimize production processes
Identified and eliminated non-value-added activities to improve efficiency
Led cross-functional teams to implement lean initiatives
Reduced lead times by 20% through the implementation of Kanban system
Implemented 5S methodology to improve workpla
Developing a lean system in the shop floor area involves identifying and eliminating waste to improve efficiency.
Identify the value stream and map out the current process
Identify and eliminate waste (muda) such as overproduction, waiting, defects, excess inventory, unnecessary motion, overprocessing, and unused talent
Implement a pull system to reduce inventory and improve flow
Standardize work processes and create a cul...
I'm sorry, but I don't have any information about KODAVARY system.
N/A
posted on 4 Jul 2024
Project management and project planning
based on 1 review
Rating in categories
Senior Engineer
259
salaries
| ₹5 L/yr - ₹19.1 L/yr |
Assistant Manager
210
salaries
| ₹7 L/yr - ₹16.4 L/yr |
Deputy Manager
144
salaries
| ₹9.5 L/yr - ₹21.5 L/yr |
Senior Manager
121
salaries
| ₹15 L/yr - ₹38.5 L/yr |
Manager
97
salaries
| ₹11.2 L/yr - ₹30 L/yr |
Tata Motors
Mahindra & Mahindra
Maruti Suzuki
Ashok Leyland