Upload Button Icon Add office photos

SRR Projects

Compare button icon Compare button icon Compare

Filter interviews by

SRR Projects QS & billing engineer Interview Questions and Answers

Updated 3 Oct 2024

SRR Projects QS & billing engineer Interview Experiences

1 interview found

Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - HR 

(2 Questions)

  • Q1. Previous salary
  • Ans. 

    I prefer not to disclose my previous salary as it is confidential information.

    • It is important to focus on the value I can bring to the new role rather than my previous salary.

    • Discussing previous salary may not be relevant to the current position or negotiation.

    • I am open to discussing my salary expectations for this role based on my qualifications and experience.

  • Answered by AI
  • Q2. Expected salary
  • Ans. 

    My expected salary is based on my experience, qualifications, and the industry standards.

    • I have researched the average salary range for QS & Billing Engineers in this industry.

    • I have X years of experience in this field, which I believe adds value to my salary expectations.

    • I am open to negotiation based on the overall compensation package offered.

  • Answered by AI

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed before Dec 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Do not use an unprofessional email address such as cool_boy@email.com. It shows a lack of professionalism by the candidate.
View all tips
Round 2 - Technical 

(5 Questions)

  • Q1. What are you doing at your past company
  • Q2. Salary how much you want😊
  • Q3. Why you want to join our company
  • Q4. Are you dedicated with your work
  • Q5. Are you technically sound

Interview Preparation Tips

Interview preparation tips for other job seekers - Plz send your resume and give your interview confidently
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. Questions will be asked on previous company roles and responsibilities.
  • Q2. Depends upon previous experience.
Round 2 - Technical 

(2 Questions)

  • Q1. Basics on structure and finishings
  • Q2. Questions on structure and finishings

Interview Preparation Tips

Interview preparation tips for other job seekers - Be prepared for what u wrote in resume.

I applied via Recruitment Consultant and was interviewed in May 2019. There were 5 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. Technical, that is what type of shuttering reinforcement works and time cycle of works, quantities of works you done....and last and
  • Q2. Importantly thay asked about safety (for me they asked safety measures in EXCAVATION)

Interview Preparation Tips

Interview preparation tips for other job seekers - Be knowledge what u worked i.e what details in your resume...
Awareness need in safety in every activity

I applied via Recruitment Consultant and was interviewed before Oct 2019. There was 1 interview round.

Interview Questionnaire 

2 Questions

  • Q1. Question ask about previous site experience.
  • Q2. Normal site questions bask about execution about R.C.C and steel

Interview Preparation Tips

Interview preparation tips for other job seekers - If you are aware about site work you can easily cleared interview

I applied via Company Website and was interviewed in Dec 2021. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Assignment 

I'm Selected For Road & Infrastructure. So, they an one program for complete road work activities and assign relationships & baseline, etc in Primavera P6 Software.
It was an Nice & Technically improve every inch of our ideas and do fast as possible to get cleared on it.

Round 3 - HR 

(1 Question)

  • Q1. About Our Knowledge about our technical skills.

Interview Preparation Tips

Interview preparation tips for other job seekers - It was an good and improve our technical knowledge on our desired Field.
Interview experience
1
Bad
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I appeared for an interview before Feb 2024.

Round 1 - Technical 

(1 Question)

  • Q1. What are the steps involved in preparing a baseline schedule?
  • Ans. 

    Steps involved in preparing a baseline schedule

    • Define project scope and objectives

    • Break down the project into smaller tasks

    • Estimate duration and resources for each task

    • Sequence the tasks in logical order

    • Assign responsibilities to team members

    • Develop a timeline for the project

    • Review and finalize the baseline schedule

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - This company is the worst. As a planning engineer, the work experience is extremely frustrating.
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Sep 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Double-check your resume for any spelling mistakes. The recruiter may consider spelling mistakes as careless behavior or poor communication skills.
View all tips
Round 2 - HR 

(1 Question)

  • Q1. 1. Self indirection ? 2. What about the fall ceiling work ? 3. What kind of material using for waterproofing ? 4. What meaning of PPM ? 5. He was supervisor one door key is missing so what can you do ? 6. ...
  • Ans. 

    I am Loganathan Gangadharan I Finished diploma in civil engineering with 10 years experience in Construction Field. Building background to eat not come down

  • Answered Anonymously
Round 3 - Technical 

(4 Questions)

  • Q1. 1. 12 mm Steel Rod using for construction ok that lapping length how much
  • Ans. 

    The lapping length for a 12 mm steel rod used in construction is typically 60 times the diameter of the rod.

    • Lapping length is usually 60 times the diameter of the steel rod

    • For a 12 mm steel rod, the lapping length would be 12 mm x 60 = 720 mm

    • Lapping is done to ensure continuity and strength in the reinforcement

  • Answered by AI
  • Q2. What type of footting using the oman country
  • Ans. 

    In Oman, commonly used footings include spread footings, strip footings, and raft footings.

    • Spread footings are used for individual columns or walls and distribute the load over a larger area.

    • Strip footings are continuous footings that support a line of columns or walls.

    • Raft footings are used for large or irregularly shaped structures to distribute the load over a wider area.

    • In Oman, due to the sandy soil conditions, de...

  • Answered by AI
  • Q3. One concrete floor for broken so rectify the floor what kind of material using
  • Ans. 

    To rectify a broken concrete floor, materials like concrete mix, epoxy resin, or self-leveling compound can be used.

    • Use concrete mix to fill in the broken areas and level the floor.

    • Apply epoxy resin to seal cracks and strengthen the floor.

    • Consider using self-leveling compound for a smooth and even surface.

    • Ensure proper preparation and cleaning of the floor before applying any material.

    • Consult with a structural engineer

  • Answered by AI
  • Q4. Concrete setting times how many days
  • Ans. 

    Concrete setting times can vary depending on factors like temperature and mix design.

    • Concrete typically sets within 24-48 hours, but continues to harden over time.

    • Factors affecting setting time include temperature, humidity, and mix design.

    • For example, in hot weather, concrete may set faster, while in cold weather it may take longer.

    • Accelerators or retarders can be added to the mix to adjust setting times as needed.

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Only one advice strong answer

Interview Questionnaire 

6 Questions

  • Q1. They were asked about previous work experience in detail.
  • Q2. Previous Project details.
  • Q3. Previous projects shuttering area and type of formwork
  • Ans. 

    The previous projects involved various types of formwork with a total shuttering area of approximately 10,000 square meters.

    • Used traditional timber formwork for a residential building project

    • Implemented modular steel formwork for a commercial complex

    • Utilized aluminum formwork for a high-rise construction

    • Employed tunnel formwork for an underground structure

  • Answered by AI
  • Q4. Build-up area
  • Q5. About subcontractors billing.
  • Q6. Formwork,steel and masonry work daily productive

Interview Preparation Tips

Interview preparation tips for other job seekers - Be prepared about your work.
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed before Jan 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(3 Questions)

  • Q1. What was your previous salary what is your expect
  • Ans. 

    I am unable to provide my previous salary as it is confidential. However, I am expecting a competitive salary based on my qualifications and experience.

    • My previous salary is confidential and I am unable to disclose it.

    • I am expecting a salary that is commensurate with my qualifications and experience.

    • I am open to discussing salary expectations during the negotiation process.

    • I believe that a competitive salary is importa...

  • Answered by AI
  • Q2. Previous salary 1 expected salary 2 whatever.
  • Q3. Educational mass card certificate documents previous salary certificate if you worked

Interview Preparation Tips

Interview preparation tips for other job seekers - Before going to interview take your food eat well don't be scared that person also a human

SRR Projects Interview FAQs

How many rounds are there in SRR Projects QS & billing engineer interview?
SRR Projects interview process usually has 1 rounds. The most common rounds in the SRR Projects interview process are HR.
How to prepare for SRR Projects QS & billing engineer interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at SRR Projects. The most common topics and skills that interviewers at SRR Projects expect are Billing Engineering, Civil Cases, Client Billing, Kubernetes and NFS.

Tell us how to improve this page.

SRR Projects QS & billing engineer Interview Process

based on 1 interview

Interview experience

4
  
Good
View more

Interview Questions from Similar Companies

Eversendai Interview Questions
3.7
 • 28 Interviews
J K Fenner Interview Questions
3.9
 • 27 Interviews
Archirodon Interview Questions
3.9
 • 16 Interviews
TPF Engineering Interview Questions
3.8
 • 13 Interviews
View all
Senior Engineer
25 salaries
unlock blur

₹4.3 L/yr - ₹8 L/yr

Site Engineer
16 salaries
unlock blur

₹2.4 L/yr - ₹5 L/yr

Civil Site Engineer
14 salaries
unlock blur

₹2.4 L/yr - ₹5.9 L/yr

Junior Engineer Civil
13 salaries
unlock blur

₹2.1 L/yr - ₹3.2 L/yr

Safety Supervisor
13 salaries
unlock blur

₹1.6 L/yr - ₹3.6 L/yr

Explore more salaries
Compare SRR Projects with

J K Fenner

3.9
Compare

Saudi Binladin Group

4.1
Compare

Bahwan Engineering

4.2
Compare

Eversendai

3.7
Compare
Did you find this page helpful?
Yes No
write
Share an Interview