Upload Button Icon Add office photos

Filter interviews by

Spl Infrastructure Interview Questions, Process, and Tips

Updated 5 Aug 2024

Top Spl Infrastructure Interview Questions and Answers

View all 7 questions

Spl Infrastructure Interview Experiences

Popular Designations

4 interviews found

Road Over Bridge, Railway (Senior engineer structure)( Bridges) Project Incharge Interview Questions & Answers

user image Anonymous

posted on 3 Aug 2024

Interview experience
3
Average
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Referral and was interviewed in Jul 2024. There were 2 interview rounds.

Round 1 - HR 

(4 Questions)

  • Q1. What is your experience
  • Ans. 

    I have over 10 years of experience in designing and managing road over bridge and railway bridge projects.

    • 10+ years of experience in designing and managing road over bridge and railway bridge projects

    • Extensive knowledge of structural engineering principles and bridge construction techniques

    • Successfully completed multiple projects within budget and timeline constraints

    • Experience working with a team of engineers, archite...

  • Answered by AI
  • Q2. What is your expectation salary
  • Ans. 

    My expectation salary is based on my experience, qualifications, and the industry standard for this position.

    • Consider my years of experience in the field

    • Take into account my qualifications and certifications

    • Research the industry standard salary for this position

    • Negotiate based on the responsibilities and scope of the role

  • Answered by AI
  • Q3. What types of pile used at site
  • Ans. 

    Various types of piles used at the site include driven piles, bored piles, and micropiles.

    • Driven piles are installed by driving them into the ground using impact hammers or vibratory hammers.

    • Bored piles are created by drilling a hole into the ground and then filling it with concrete and reinforcing steel.

    • Micropiles are small diameter piles typically used in limited access areas or where there is a need for minimal vibr...

  • Answered by AI
  • Q4. What is M35 Concrete ratio
  • Ans. 

    M35 concrete ratio refers to the mix ratio of cement, sand, and aggregate used in concrete construction.

    • M35 concrete ratio is 1:1.6:2.907 (cement:sand:aggregate)

    • It is a high strength concrete mix used in heavy-duty construction projects

    • The higher the grade of concrete, the stronger it is and the more load it can bear

  • Answered by AI
Round 2 - Technical 

(2 Questions)

  • Q1. Types of pile and Pile details?
  • Ans. 

    Types of pile include driven piles, bored piles, and screw piles. Pile details include material, length, diameter, and load capacity.

    • Driven piles are installed by driving them into the ground using impact hammers or vibratory hammers.

    • Bored piles are created by drilling a hole into the ground and then filling it with concrete.

    • Screw piles are twisted into the ground using a machine, providing a quick and efficient founda...

  • Answered by AI
  • Q2. Minor bridge and Major bridge?
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
-
Result
Selected Selected

I applied via Company Website

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(3 Questions)

  • Q1. Retaining walls
  • Q2. Re Wall leeving pad
  • Ans. 

    Wall leevling pad is a structure used to level the ground surface for construction of walls.

    • Wall leevling pad is made of concrete or compacted gravel.

    • It is used to provide a level surface for the construction of walls.

    • It helps to distribute the weight of the wall evenly.

    • It also helps to prevent settling or shifting of the wall over time.

  • Answered by AI
  • Q3. Erection and casting

Interview Preparation Tips

Interview preparation tips for other job seekers - Re Wall erection and casting

Civil Site Engineer Interview Questions asked at other Companies

Q1. What is the minimum Grade of Concrete used in R.C.C. works?
View answer (63)
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Jan 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. What you know about Structural design?
  • Ans. 

    Structural design involves the analysis and design of structures to resist loads and ensure safety and stability.

    • Structural design is a branch of civil engineering

    • It involves analyzing and designing structures such as buildings, bridges, and towers

    • Factors considered in structural design include load capacity, stability, and safety

    • Structural design also involves selecting appropriate materials and construction methods

    • Ex...

  • Answered by AI
  • Q2. What about you know twin towers?
  • Ans. 

    The Twin Towers were two skyscrapers in New York City that were destroyed in a terrorist attack on September 11, 2001.

    • The Twin Towers were located in the World Trade Center complex in Lower Manhattan.

    • They were both 110 stories tall and were completed in 1973.

    • On September 11, 2001, terrorists hijacked two planes and flew them into the towers, causing them to collapse and killing nearly 3,000 people.

    • The attacks led to a ...

  • Answered by AI
Round 3 - HR 

(2 Questions)

  • Q1. What is your salary expectation
  • Q2. When you are joining our company

Interview Preparation Tips

Interview preparation tips for other job seekers - Structural design is the most important thing in civil engineer field

Site Engineer Interview Questions asked at other Companies

Q1. 1.BBS calculation of slab? 2.Stairs case riser and tread dimension? 3.Types of cement? 4.Full form of tmt, pcc, rcc, tmx, dpc 5.Definition of plinth area, courtyard area, built-up area? 6.function of dpc 8.standard size of brick? 9. Write g... read more
View answer (2)

EHS Officer Interview Questions & Answers

user image Anonymous

posted on 27 Oct 2021

I applied via Naukri.com and was interviewed in Apr 2021. There were 3 interview rounds.

Interview Questionnaire 

4 Questions

  • Q1. What is your roll and responsibility at site ?
  • Q2. Why you change organisation?
  • Q3. Describe piling job and launching girder
  • Ans. 

    Piling job involves driving piles into the ground to create a foundation for a structure. Launching girder is the process of placing girders onto the piles to form the bridge deck.

    • Piling job requires heavy machinery such as pile drivers and cranes.

    • The piles are driven deep into the ground to provide a stable foundation for the structure.

    • Launching girder involves lifting and placing pre-fabricated girders onto the piles...

  • Answered by AI
  • Q4. What is HIRA &JHA

Interview Preparation Tips

Interview preparation tips for other job seekers - Most of the questions asked to me were related to my project topic

EHS Officer Interview Questions asked at other Companies

Q1. What's the KPI and how we prepare a strategy to achieve. What's the ISO certification and how do we implement and adhered in organization. What are the legal compliance in terms of EHS. How do we manage EHS functions and how typically we tr... read more
View answer (1)

Spl Infrastructure interview questions for popular designations

 Civil Site Engineer

 (1)

 EHS Officer

 (1)

 Site Engineer

 (1)

Interview questions from similar companies

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Nov 2024. There were 5 interview rounds.

Round 1 - One-on-one 

(2 Questions)

  • Q1. Store work details
  • Q2. Store inventory
Round 2 - One-on-one 

(2 Questions)

  • Q1. Job change reason
  • Ans. 

    Seeking new challenges and opportunities for growth

    • Desire to expand skill set and knowledge in a new environment

    • Opportunity for career advancement and professional development

    • Seeking a more challenging and rewarding role

    • Interest in exploring different aspects of the industry

  • Answered by AI
  • Q2. Self growth
Round 3 - One-on-one 

(2 Questions)

  • Q1. Site job work ready
  • Q2. Guest house facility
Round 4 - One-on-one 

(2 Questions)

  • Q1. Ready work 10 hours
  • Q2. Good waking in hitech
Round 5 - One-on-one 

(2 Questions)

  • Q1. Working system is good
  • Q2. Job time is good

Interview Preparation Tips

Interview preparation tips for other job seekers - Good job in hitech in all site
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Company Website and was interviewed in Nov 2024. There was 1 interview round.

Round 1 - One-on-one 

(5 Questions)

  • Q1. How to grow up to other company
  • Ans. 

    To grow your career and transition to another company, focus on networking, gaining new skills, updating your resume, and preparing for interviews.

    • Network with professionals in your industry to learn about job opportunities

    • Attend industry events, conferences, and workshops to expand your knowledge and skills

    • Update your resume with your latest projects, achievements, and certifications

    • Practice for interviews by research...

  • Answered by AI
  • Q2. How will do interview with another company
  • Q3. I want to know everything is new company
  • Q4. I want to know new company wor management and had office staff
  • Q5. I want know my new company work location

Interview Preparation Tips

Interview preparation tips for other job seekers - Time management it very important with manpower and machine
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
-
Result
-

I applied via campus placement at Hooghly Engineering & Technology College, Hoogly and was interviewed in Nov 2024. There were 4 interview rounds.

Round 1 - Aptitude Test 

All basic quantitative aptitude.

Round 2 - Group Discussion 

Topic was "Automation creating or destroing jobs."

Round 3 - Technical 

(2 Questions)

  • Q1. Shear stress, Theory of failures, FOS, How Fusion word is related to mechanical engineering, Why we use thermodynamics,
  • Q2. Allowing elements compositions of steel and there properties,Welding technology basic data based question,
Round 4 - HR 

(1 Question)

  • Q1. Why this company over other.(this will be a bit tricky 🤔 be honest and gather some knoledge about the company). What you prefer more job security or money.(be honest)- I told job security,further they a...
Interview experience
3
Average
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via campus placement at Delhi College of Engineering (DCE), Delhi and was interviewed in Dec 2024. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. Basis Electrical Questions like Relation between Voltage and current, Reactive Power, Series Parallel Connections etc
  • Q2. About Projects and Internships

Interview Preparation Tips

Topics to prepare for Tractebel Pget interview:
  • Electricals
  • Power Electronics
  • Basic
Interview preparation tips for other job seekers - Guys, stick to basics and try to give crisp answers
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
-
Result
Not Selected

I applied via Recruitment Consulltant and was interviewed in Sep 2024. There was 1 interview round.

Round 1 - Technical 

(7 Questions)

  • Q1. What are the Pump head loss calculation parameters
  • Ans. 

    Pump head loss calculation parameters include friction loss, elevation change, velocity head, and fittings.

    • Friction loss due to pipe roughness

    • Elevation change between inlet and outlet

    • Velocity head due to fluid velocity

    • Losses from fittings like elbows, tees, and valves

  • Answered by AI
  • Q2. What is the AHU components
  • Ans. 

    AHU components refer to the various parts of an Air Handling Unit that work together to regulate and circulate air in a building.

    • Filters - to remove dust and particles from the air

    • Coils - for heating or cooling the air

    • Fans - to circulate the air

    • Dampers - to control the flow of air

    • Humidifiers/dehumidifiers - to adjust the humidity levels

  • Answered by AI
  • Q3. Which type of blowers are use in AHU
  • Ans. 

    Centrifugal blowers are commonly used in AHUs for their efficiency and ability to handle high volumes of air.

    • Centrifugal blowers are preferred for AHUs due to their ability to handle high volumes of air efficiently.

    • They are more energy efficient compared to other types of blowers.

    • Examples of centrifugal blowers commonly used in AHUs include forward curved, backward inclined, and airfoil designs.

  • Answered by AI
  • Q4. What is the difference between primary pump or secondary pump
  • Ans. 

    Primary pump is the main pump responsible for the majority of the pumping work, while secondary pump is a backup pump used in case the primary pump fails.

    • Primary pump is the main pump in a system, while secondary pump is a backup pump.

    • Primary pump is responsible for the majority of the pumping work, while secondary pump is used only when needed.

    • Examples: In a heating system, the primary pump circulates hot water throug...

  • Answered by AI
  • Q5. What is the AHU valve conection
  • Ans. 

    AHU valve connection refers to the connection of valves in an air handling unit for controlling the flow of air.

    • AHU valve connection is essential for regulating the flow of air in an air handling unit.

    • Valves are typically connected to the AHU ductwork to control the amount of air entering or exiting the unit.

    • Properly connected valves ensure efficient operation of the AHU system.

    • Examples of AHU valves include damper val

  • Answered by AI
  • Q6. What things are required in chilled water pipe size
  • Ans. 

    Chilled water pipe size requirements depend on flow rate, pressure drop, material, insulation, and system design.

    • Flow rate: Determine the required flow rate of chilled water in the system.

    • Pressure drop: Calculate the pressure drop to ensure efficient operation.

    • Material: Select appropriate pipe material based on temperature and pressure requirements.

    • Insulation: Insulate the pipes to prevent heat gain or loss.

    • System desi...

  • Answered by AI
  • Q7. What is the chiller conection
  • Ans. 

    The chiller connection refers to the method by which a chiller unit is connected to a building's HVAC system.

    • Chiller connection typically involves piping to transport chilled water from the chiller to the building's air handling units.

    • The connection may also include electrical wiring for power supply and control signals.

    • Proper chiller connection is crucial for efficient cooling and proper functioning of the HVAC system

  • Answered by AI

Interview Preparation Tips

Topics to prepare for Sterling & Wilson Project Manager interview:
  • prepare in HVAC chiller system
Interview preparation tips for other job seekers - I advice to the job seekers gained the practical knowledge in our field.
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(3 Questions)

  • Q1. What are the details regarding different types of shuttering materials?
  • Q2. What is inventory?
  • Q3. What is the process for receiving materials?

Spl Infrastructure Interview FAQs

How many rounds are there in Spl Infrastructure interview?
Spl Infrastructure interview process usually has 2-3 rounds. The most common rounds in the Spl Infrastructure interview process are Technical, Resume Shortlist and HR.
How to prepare for Spl Infrastructure interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at Spl Infrastructure. The most common topics and skills that interviewers at Spl Infrastructure expect are Bridge Construction, Client Billing, Construction Management, Cost Estimation and Planning Engineering.
What are the top questions asked in Spl Infrastructure interview?

Some of the top questions asked at the Spl Infrastructure interview -

  1. What you know about Structural desi...read more
  2. What about you know twin towe...read more
  3. What types of pile used at si...read more

Tell us how to improve this page.

People are getting interviews through

based on 4 Spl Infrastructure interviews
Company Website
WalkIn
Job Portal
Referral
25%
25%
25%
25%
Moderate Confidence
?
Moderate Confidence means the data is based on a sufficient number of responses received from the candidates

Interview Questions from Similar Companies

Larsen & Toubro Limited Interview Questions
4.0
 • 1.4k Interviews
Tata Projects Interview Questions
4.3
 • 399 Interviews
GMR Group Interview Questions
4.1
 • 75 Interviews
Simplex Infrastructures Interview Questions
3.3
 • 65 Interviews
GAMMON INDIA Interview Questions
3.9
 • 29 Interviews
Reliance Infrastructure Interview Questions
4.1
 • 23 Interviews
IRB Infrastructure Interview Questions
4.0
 • 17 Interviews
View all

Spl Infrastructure Reviews and Ratings

based on 100 reviews

4.0/5

Rating in categories

3.8

Skill development

3.7

Work-Life balance

3.6

Salary & Benefits

3.7

Job Security

3.5

Company culture

3.3

Promotions/Appraisal

3.6

Work Satisfaction

Explore 100 Reviews and Ratings
Senior Engineer
23 salaries
unlock blur

â‚ą2.6 L/yr - â‚ą7.8 L/yr

Highway Engineer
18 salaries
unlock blur

â‚ą3 L/yr - â‚ą4.3 L/yr

Site Engineer
18 salaries
unlock blur

â‚ą1.8 L/yr - â‚ą4.6 L/yr

Structural Engineer
15 salaries
unlock blur

â‚ą3 L/yr - â‚ą5.4 L/yr

Quantity Surveyor
14 salaries
unlock blur

â‚ą2.2 L/yr - â‚ą4.5 L/yr

Explore more salaries
Compare Spl Infrastructure with

Larsen & Toubro Limited

4.0
Compare

Tata Projects

4.3
Compare

GMR Group

4.1
Compare

Reliance Infrastructure

4.1
Compare

Calculate your in-hand salary

Confused about how your in-hand salary is calculated? Enter your annual salary (CTC) and get your in-hand salary
Did you find this page helpful?
Yes No
write
Share an Interview