Filter interviews by
I applied via Referral and was interviewed in Jul 2024. There were 2 interview rounds.
I have over 10 years of experience in designing and managing road over bridge and railway bridge projects.
10+ years of experience in designing and managing road over bridge and railway bridge projects
Extensive knowledge of structural engineering principles and bridge construction techniques
Successfully completed multiple projects within budget and timeline constraints
Experience working with a team of engineers, archite...
My expectation salary is based on my experience, qualifications, and the industry standard for this position.
Consider my years of experience in the field
Take into account my qualifications and certifications
Research the industry standard salary for this position
Negotiate based on the responsibilities and scope of the role
Various types of piles used at the site include driven piles, bored piles, and micropiles.
Driven piles are installed by driving them into the ground using impact hammers or vibratory hammers.
Bored piles are created by drilling a hole into the ground and then filling it with concrete and reinforcing steel.
Micropiles are small diameter piles typically used in limited access areas or where there is a need for minimal vibr...
M35 concrete ratio refers to the mix ratio of cement, sand, and aggregate used in concrete construction.
M35 concrete ratio is 1:1.6:2.907 (cement:sand:aggregate)
It is a high strength concrete mix used in heavy-duty construction projects
The higher the grade of concrete, the stronger it is and the more load it can bear
Types of pile include driven piles, bored piles, and screw piles. Pile details include material, length, diameter, and load capacity.
Driven piles are installed by driving them into the ground using impact hammers or vibratory hammers.
Bored piles are created by drilling a hole into the ground and then filling it with concrete.
Screw piles are twisted into the ground using a machine, providing a quick and efficient founda...
I applied via Company Website
Wall leevling pad is a structure used to level the ground surface for construction of walls.
Wall leevling pad is made of concrete or compacted gravel.
It is used to provide a level surface for the construction of walls.
It helps to distribute the weight of the wall evenly.
It also helps to prevent settling or shifting of the wall over time.
I applied via Walk-in and was interviewed in Jan 2023. There were 3 interview rounds.
Structural design involves the analysis and design of structures to resist loads and ensure safety and stability.
Structural design is a branch of civil engineering
It involves analyzing and designing structures such as buildings, bridges, and towers
Factors considered in structural design include load capacity, stability, and safety
Structural design also involves selecting appropriate materials and construction methods
Ex...
The Twin Towers were two skyscrapers in New York City that were destroyed in a terrorist attack on September 11, 2001.
The Twin Towers were located in the World Trade Center complex in Lower Manhattan.
They were both 110 stories tall and were completed in 1973.
On September 11, 2001, terrorists hijacked two planes and flew them into the towers, causing them to collapse and killing nearly 3,000 people.
The attacks led to a ...
I applied via Naukri.com and was interviewed in Apr 2021. There were 3 interview rounds.
Piling job involves driving piles into the ground to create a foundation for a structure. Launching girder is the process of placing girders onto the piles to form the bridge deck.
Piling job requires heavy machinery such as pile drivers and cranes.
The piles are driven deep into the ground to provide a stable foundation for the structure.
Launching girder involves lifting and placing pre-fabricated girders onto the piles...
Spl Infrastructure interview questions for popular designations
Top trending discussions
posted on 23 Dec 2024
I applied via Walk-in and was interviewed in Nov 2024. There were 5 interview rounds.
Seeking new challenges and opportunities for growth
Desire to expand skill set and knowledge in a new environment
Opportunity for career advancement and professional development
Seeking a more challenging and rewarding role
Interest in exploring different aspects of the industry
posted on 11 Dec 2024
I applied via Company Website and was interviewed in Nov 2024. There was 1 interview round.
To grow your career and transition to another company, focus on networking, gaining new skills, updating your resume, and preparing for interviews.
Network with professionals in your industry to learn about job opportunities
Attend industry events, conferences, and workshops to expand your knowledge and skills
Update your resume with your latest projects, achievements, and certifications
Practice for interviews by research...
posted on 26 Dec 2024
I applied via campus placement at Hooghly Engineering & Technology College, Hoogly and was interviewed in Nov 2024. There were 4 interview rounds.
All basic quantitative aptitude.
Topic was "Automation creating or destroing jobs."
I applied via campus placement at Delhi College of Engineering (DCE), Delhi and was interviewed in Dec 2024. There was 1 interview round.
I applied via Recruitment Consulltant and was interviewed in Sep 2024. There was 1 interview round.
Pump head loss calculation parameters include friction loss, elevation change, velocity head, and fittings.
Friction loss due to pipe roughness
Elevation change between inlet and outlet
Velocity head due to fluid velocity
Losses from fittings like elbows, tees, and valves
AHU components refer to the various parts of an Air Handling Unit that work together to regulate and circulate air in a building.
Filters - to remove dust and particles from the air
Coils - for heating or cooling the air
Fans - to circulate the air
Dampers - to control the flow of air
Humidifiers/dehumidifiers - to adjust the humidity levels
Centrifugal blowers are commonly used in AHUs for their efficiency and ability to handle high volumes of air.
Centrifugal blowers are preferred for AHUs due to their ability to handle high volumes of air efficiently.
They are more energy efficient compared to other types of blowers.
Examples of centrifugal blowers commonly used in AHUs include forward curved, backward inclined, and airfoil designs.
Primary pump is the main pump responsible for the majority of the pumping work, while secondary pump is a backup pump used in case the primary pump fails.
Primary pump is the main pump in a system, while secondary pump is a backup pump.
Primary pump is responsible for the majority of the pumping work, while secondary pump is used only when needed.
Examples: In a heating system, the primary pump circulates hot water throug...
AHU valve connection refers to the connection of valves in an air handling unit for controlling the flow of air.
AHU valve connection is essential for regulating the flow of air in an air handling unit.
Valves are typically connected to the AHU ductwork to control the amount of air entering or exiting the unit.
Properly connected valves ensure efficient operation of the AHU system.
Examples of AHU valves include damper val
Chilled water pipe size requirements depend on flow rate, pressure drop, material, insulation, and system design.
Flow rate: Determine the required flow rate of chilled water in the system.
Pressure drop: Calculate the pressure drop to ensure efficient operation.
Material: Select appropriate pipe material based on temperature and pressure requirements.
Insulation: Insulate the pipes to prevent heat gain or loss.
System desi...
The chiller connection refers to the method by which a chiller unit is connected to a building's HVAC system.
Chiller connection typically involves piping to transport chilled water from the chiller to the building's air handling units.
The connection may also include electrical wiring for power supply and control signals.
Proper chiller connection is crucial for efficient cooling and proper functioning of the HVAC system
posted on 8 Jan 2025
based on 100 reviews
Rating in categories
Senior Engineer
23
salaries
| â‚ą2.6 L/yr - â‚ą7.8 L/yr |
Highway Engineer
18
salaries
| â‚ą3 L/yr - â‚ą4.3 L/yr |
Site Engineer
18
salaries
| â‚ą1.8 L/yr - â‚ą4.6 L/yr |
Structural Engineer
15
salaries
| â‚ą3 L/yr - â‚ą5.4 L/yr |
Quantity Surveyor
14
salaries
| â‚ą2.2 L/yr - â‚ą4.5 L/yr |
Larsen & Toubro Limited
Tata Projects
GMR Group
Reliance Infrastructure