I applied via Referral and was interviewed before Jun 2023. There were 2 interview rounds.
Root Cause Analysis is a systematic process used to identify the underlying causes of problems or issues.
Identify the problem or issue that needs to be addressed
Gather data and evidence related to the problem
Identify possible causes of the problem
Use tools like Fishbone diagram, 5 Whys, or Fault Tree Analysis to analyze the causes
Determine the root cause or causes of the problem
Develop and implement solutions to addres
Continuity equation is a fundamental principle in fluid dynamics that states mass flow rate must remain constant in a steady flow.
States that the mass flow rate into a control volume must equal the mass flow rate out of the control volume
Mathematically represented as A1V1 = A2V2, where A is the cross-sectional area and V is the velocity of the fluid
Used in various engineering applications such as pipe flow, open channe
Volume, area & surface area of cube, sphere & cylinder are important geometric calculations.
Volume of cube = side length^3
Area of cube = 6 * side length^2
Surface area of cube = 6 * side length^2
Volume of sphere = (4/3) * π * radius^3
Area of sphere = 4 * π * radius^2
Surface area of sphere = 4 * π * radius^2
Volume of cylinder = π * radius^2 * height
Area of cylinder = 2 * π * radius * (radius + height)
Surface area of cyli
Top trending discussions
I applied via Indeed and was interviewed in Nov 2024. There was 1 interview round.
It is important for a Public Limited company to provide facilities to employees regardless of the literacy level of the Departmental HOD.
It is essential for a Public Limited company to adhere to labor laws and regulations regarding employee rights and facilities.
Providing facilities to employees, such as proper working conditions, safety measures, and benefits, is crucial for employee satisfaction and productivity.
Igno...
posted on 28 Jul 2024
posted on 12 May 2024
I applied via Job Fair and was interviewed in Apr 2024. There were 2 interview rounds.
Production productivity type refers to the method or approach used to measure and improve productivity in a manufacturing setting.
Different types include labor productivity, machine productivity, and overall equipment effectiveness (OEE).
Labor productivity measures the output per worker or per labor hour.
Machine productivity measures the output per machine or equipment.
OEE measures the overall efficiency of a productio...
Production productivity type refers to the method used to measure and improve efficiency in manufacturing processes.
Different types include OEE (Overall Equipment Effectiveness), Takt time, and Cycle time
OEE measures the percentage of planned production time that is truly productive
Takt time is the rate at which a product must be produced to meet customer demand
Cycle time is the total time it takes to complete a proces
I have over 10 years of experience working in various companies, ranging from startups to multinational corporations.
Started my career at a small startup where I learned the importance of agility and adaptability
Moved on to a mid-sized company where I honed my leadership skills and managed cross-functional teams
Currently working at a multinational corporation where I have gained experience in global operations and stra
I applied via LinkedIn and was interviewed in Apr 2024. There was 1 interview round.
I applied via Indeed and was interviewed in Apr 2024. There were 2 interview rounds.
Very easy questions. Consist of quants and reasoning and one analytical question (not mandatory to answer seriously)
I am a detail-oriented professional with experience in managing catalogues and ensuring accuracy in product listings.
I have a strong attention to detail and organizational skills
I am proficient in data management and analysis
I have experience in creating and updating product catalogues
I prioritize accuracy and consistency in product listings
posted on 22 Apr 2024
Interview experience
based on 26 reviews
Rating in categories
Purchase Engineer
8
salaries
| ₹2.6 L/yr - ₹4.2 L/yr |
Assistant Sales Manager
6
salaries
| ₹6.6 L/yr - ₹10.4 L/yr |
Design Engineer
4
salaries
| ₹3 L/yr - ₹4.2 L/yr |
Senior Design Engineer
4
salaries
| ₹4.3 L/yr - ₹6.1 L/yr |
Service Engineer
4
salaries
| ₹2 L/yr - ₹2.5 L/yr |
Thermax Limited
Forbes Marshall
Praj Industries
Kirloskar Brothers