I applied via Approached by Company and was interviewed in Jul 2024. There were 2 interview rounds.
Creating a schedule for building completions involves identifying key milestones, setting realistic timelines, allocating resources efficiently, and regularly monitoring progress.
Identify key milestones such as foundation completion, structural framing, and interior finishing.
Set realistic timelines for each milestone based on factors like project scope, budget, and available resources.
Allocate resources efficiently by...
Erection procedure refers to the process of assembling and installing metal building components on site.
Site preparation including clearing and leveling the ground
Assembling structural components like columns, beams, and trusses
Using cranes or other equipment to lift and position components into place
Securing components together with bolts or welding
Checking alignment and making adjustments as needed
Completing finishin...
Start erection at the corner of the building where the largest column is located.
Begin by setting up the largest column at the corner of the building.
Ensure the column is plumb and secure before moving on to the next section.
Continue erecting the building in a sequential manner, following the building plans.
Use appropriate equipment and safety measures throughout the erection process.
To prepare a schedule, start by identifying project tasks, estimating durations, sequencing tasks, assigning resources, and monitoring progress.
Identify all project tasks and break them down into smaller, manageable components.
Estimate the duration of each task based on historical data, expert judgment, or industry standards.
Sequence the tasks in the order they need to be completed, considering dependencies and constra...
I applied via Referral and was interviewed in Jun 2021. There was 1 interview round.
Daylight panel fixing details in SSR sheet
SSR sheet is a type of roofing sheet used for industrial and commercial buildings
Daylight panels are used to allow natural light into the building
Fixing details include the type of fasteners used and the spacing between them
Proper installation is important to prevent leaks and ensure structural integrity
I applied via Naukri.com and was interviewed before Jun 2021. There were 2 interview rounds.
Smith Structures interview questions for popular designations
Top trending discussions
posted on 25 Dec 2021
I applied via Recruitment Consultant and was interviewed in Nov 2021. There was 1 interview round.
To achieve the desired target, it is important to set clear goals, create a strategic plan, motivate and empower the team, monitor progress, and make necessary adjustments.
Set clear and specific goals that are aligned with the overall objectives
Create a strategic plan outlining the steps and resources required
Motivate and empower the team by providing support, training, and recognition
Monitor progress regularly through...
I applied via Campus Placement and was interviewed in Oct 2023. There were 4 interview rounds.
Their is Aptitude test of 70 Marks and Cut off of 60
I applied via Recruitment Consultant and was interviewed in Feb 2021. There were 3 interview rounds.
I applied via Walk-in and was interviewed before Dec 2023. There was 1 interview round.
I applied via Naukri.com and was interviewed in Apr 2022. There were 3 interview rounds.
based on 2 interviews
Interview experience
based on 63 reviews
Rating in categories
Assistant Manager
14
salaries
| ₹3.7 L/yr - ₹11.2 L/yr |
Senior Engineer
14
salaries
| ₹4.6 L/yr - ₹7.5 L/yr |
Design Engineer
11
salaries
| ₹3.6 L/yr - ₹7 L/yr |
Mechanical Engineer
11
salaries
| ₹2 L/yr - ₹4.8 L/yr |
Project Engineer
10
salaries
| ₹3.6 L/yr - ₹5.9 L/yr |
Ozone Overseas
Flipspaces
Eglo India
Shakti Hormann