Filter interviews by
I applied via Walk-in and was interviewed in Jul 2022. There were 2 interview rounds.
I applied via Referral and was interviewed before Jul 2020. There was 1 interview round.
Solventless and solvent-based lamination are two types of lamination processes used in packaging development.
Solventless lamination uses adhesives that do not contain solvents, while solvent-based lamination uses adhesives that contain solvents.
Solventless lamination is considered to be more environmentally friendly and cost-effective than solvent-based lamination.
Solvent-based lamination requires more drying time and ...
I appeared for an interview before Feb 2024.
They have some questions sheet which we need to solve.
I am a passionate software developer with experience in building web applications using various technologies.
Experienced in developing web applications using HTML, CSS, JavaScript, and frameworks like React and Angular
Proficient in backend development with Node.js and databases like MongoDB and MySQL
Familiar with version control systems like Git and deployment tools like Heroku
Strong problem-solving skills and ability
posted on 18 Aug 2023
I applied via Approached by Company and was interviewed in Feb 2023. There were 4 interview rounds.
posted on 22 Sep 2022
I applied via Approached by Company and was interviewed in Apr 2022. There were 2 interview rounds.
Preventive maintenance is a proactive approach to maintenance that aims to prevent equipment failure before it occurs.
Regularly scheduled inspections and maintenance
Replacing worn or damaged parts before they cause a breakdown
Cleaning and lubricating equipment to prevent wear and tear
Keeping accurate records of maintenance activities
Examples: changing the oil in a car, replacing air filters in HVAC systems, inspecting
SAP PM module is used for managing maintenance activities of an organization.
PM stands for Plant Maintenance
It helps in planning and scheduling maintenance tasks
Tracks equipment and maintenance history
Provides cost analysis and reporting
Integrates with other SAP modules like MM and FI
Example: A manufacturing company can use SAP PM to schedule maintenance of their production equipment
I have handled various utilities equipments including generators, chillers, HVAC systems, and water treatment plants.
Generators: responsible for maintenance and repair of diesel and gas generators
Chillers: handled installation and maintenance of air-cooled and water-cooled chillers
HVAC systems: managed repair and maintenance of heating, ventilation, and air conditioning systems
Water treatment plants: responsible for op...
Bearings are used to reduce friction between two moving parts. There are several types of bearings.
Plain bearings
Rolling element bearings
Jewel bearings
Fluid bearings
Magnetic bearings
I appeared for an interview in Mar 2023.
Polymers are large molecules made up of repeating units called monomers.
Polymers can be natural or synthetic.
Examples of natural polymers include proteins, DNA, and cellulose.
Examples of synthetic polymers include plastics, nylon, and rubber.
Polymers have a wide range of applications in industries such as packaging, textiles, and medicine.
Project explain refers to explaining the details and objectives of a particular project. Industrial visit explain refers to explaining the purpose and outcomes of visiting an industrial site.
Project explain involves discussing the scope, goals, timeline, and budget of a project.
Industrial visit explain involves highlighting the benefits of visiting an industrial site, such as gaining practical knowledge, networking, an...
I applied via Campus Placement and was interviewed before May 2023. There were 2 interview rounds.
Aptitude test was similar to Management Exams/ CAT.
Project Management involves planning, organizing, and overseeing the completion of a project within specific constraints.
CPM stands for Critical Path Method, a project management technique used to determine the longest sequence of dependent tasks and the shortest time needed to complete a project.
PERT stands for Program Evaluation and Review Technique, a project management tool used to analyze and represent the tasks i...
Sales Executive
12
salaries
| ₹1.8 L/yr - ₹3.5 L/yr |
Production Supervisor
7
salaries
| ₹2.5 L/yr - ₹4.1 L/yr |
Executive Accountant
7
salaries
| ₹2.2 L/yr - ₹3.5 L/yr |
Process Coordinator
7
salaries
| ₹1.3 L/yr - ₹1.8 L/yr |
Quality Supervisor
6
salaries
| ₹2.3 L/yr - ₹4 L/yr |
Blue Dart Express
GATI-KWE
DTDC Express
Safexpress