Water cement ratio in concrete is the ratio of the weight of water to the weight of cement used in the mixture.
Water cement ratio is an important factor in determining the strength and durability of concrete.
A lower water cement ratio generally results in higher strength concrete.
If the cube strength differs by 12%, it indicates a significant variation in the concrete mix.
To address this, the water cement ratio can be ...
Necessary steps during excavation work 5 meter deep by Excavator
Ensure proper shoring and bracing to prevent cave-ins
Regularly inspect the excavation site for any signs of instability
Provide adequate lighting and ventilation in the excavation area
Ensure proper communication between the excavator operator and ground personnel
Have a rescue plan in place in case of emergencies
I will assign tasks based on the strengths of each worker and use machines for heavy lifting and repetitive tasks.
Assess the skills and abilities of each worker
Assign tasks based on their strengths
Use machines for heavy lifting and repetitive tasks
Train workers to use machines safely and efficiently
Regularly maintain and repair machines to ensure they are functioning properly
Safety aspect is essential. PPE stands for Personal Protective Equipment. Precautions include proper ventilation and use of gas detectors.
Safety is a top priority in any construction project.
PPE includes hard hats, safety glasses, gloves, and respirators.
Working in a remote and gaseous 2 meter deep area requires proper ventilation and use of gas detectors.
Workers should also be trained on emergency procedures in case o
based on 1 review
Rating in categories
Assistant Manager
193
salaries
| ₹3.5 L/yr - ₹11.1 L/yr |
Assistant Engineer
164
salaries
| ₹1.8 L/yr - ₹5.1 L/yr |
Assistant Engineer - Civil
161
salaries
| ₹2.6 L/yr - ₹4.7 L/yr |
Project Engineer
145
salaries
| ₹2.9 L/yr - ₹7.8 L/yr |
Deputy Manager
115
salaries
| ₹5.5 L/yr - ₹12.6 L/yr |
Larsen & Toubro Limited
Tata Projects
Hindustan Construction Company
GAMMON INDIA