Cement is a binding material used in construction to hold together bricks, stones, and other materials. Sand is a fine aggregate used in concrete mixes.
Cement is a powdery substance made from limestone and clay, which when mixed with water forms a paste that hardens to bind materials together.
Sand is a granular material composed of finely divided rock and mineral particles, commonly used as a fine aggregate in concrete...
Aggregate and sand are materials commonly used in construction for creating concrete and mortar.
Aggregate is a mixture of sand, gravel, crushed stone, or other materials used in construction.
Sand is a granular material composed of finely divided rock and mineral particles.
Aggregate is used in concrete to provide bulk and strength, while sand is used in mortar for bonding materials together.
Examples of aggregate include...
Top trending discussions
I applied via Naukri.com and was interviewed in Oct 2023. There was 1 interview round.
I applied via Referral and was interviewed before Mar 2022. There was 1 interview round.
I applied via Naukri.com and was interviewed before Jul 2022. There were 2 interview rounds.
I applied via Company Website and was interviewed before Dec 2020. There were 3 interview rounds.
I applied via Campus Placement and was interviewed in Jan 2024. There were 3 interview rounds.
The communication system in a Power Substation involves various technologies and protocols to ensure efficient and reliable transmission of data.
Communication between control room and substation equipment
SCADA systems for monitoring and control
Fiber optic cables for high-speed data transmission
Protocols like DNP3, Modbus, and IEC 61850 for data exchange
Remote terminal units (RTUs) for collecting data from field devices
SLD of a Power Substation is a graphical representation of the electrical system showing how different components are connected and interact.
SLD typically includes transformers, circuit breakers, switches, relays, and other electrical equipment.
It shows the flow of electricity from the power source to the distribution lines and various loads.
Components are represented by standardized symbols and lines indicating connec...
Wave traps are devices used in electrical systems to prevent the passage of high-frequency currents while allowing the flow of power frequency currents.
Wave traps are typically used in power systems to protect equipment from high-frequency currents generated by lightning strikes or switching operations.
They work by providing a low impedance path for power frequency currents to flow through, while blocking high-frequenc...
I have a strong background in renewable energy and project management, with a passion for sustainability and innovation.
I have a degree in Environmental Science with a focus on renewable energy technologies.
I have previous experience working on solar power projects, including overseeing installation and maintenance.
I am familiar with industry regulations and standards related to solar power projects.
I have a track reco...
I have over 5 years of experience in retail management, leading teams and driving sales.
Managed a team of 15 sales associates, providing training and support to improve performance
Implemented new sales strategies that resulted in a 10% increase in revenue
Handled inventory management, including ordering and restocking products to meet customer demand
Experienced retail professional with strong leadership skills and a passion for customer service.
Over 5 years of experience in retail management
Proven track record of increasing sales and improving customer satisfaction
Strong leadership skills, able to motivate and manage a team effectively
Passionate about providing excellent customer service
Excellent communication and problem-solving skills
In my previous company, I was responsible for overseeing daily operations, managing staff, and ensuring customer satisfaction.
Managed a team of employees and delegated tasks effectively
Handled customer inquiries and resolved issues in a timely manner
Created and implemented strategies to improve sales and profitability
Conducted performance evaluations and provided feedback to staff
Ensured compliance with company policie
I applied via Company Website and was interviewed before Nov 2023. There were 4 interview rounds.
Concrete pouring method involves the process of placing and compacting concrete into a formwork to create a solid structure.
Ensure formwork is properly prepared and secured before pouring concrete
Use appropriate equipment such as concrete pumps or buckets for pouring
Monitor concrete flow and consistency to avoid segregation or honeycombing
Properly compact the concrete to remove air voids and ensure strength
Allow suffic...
Shuttering of columns is the process of creating temporary formwork to support concrete until it sets.
Shuttering is usually made of plywood, timber, or steel.
It is important to ensure the shuttering is properly supported and aligned before pouring concrete.
The shuttering should be removed after the concrete has set to the required strength.
Properly designed and constructed shuttering helps in achieving a smooth and uni
Tiles can be placed using various methods such as grid layout, random pattern, or specific design layout.
Tiles can be placed in a grid layout for a uniform and organized look.
Random pattern placement can create a more eclectic and unique design.
Specific design layout involves placing tiles according to a pre-determined pattern or design.
Consider factors like tile size, shape, color, and grout spacing when deciding on t
The flooring method for stone work typically involves using mortar or adhesive to secure the stones in place.
Prepare the subfloor by ensuring it is clean, level, and dry
Apply mortar or adhesive to the back of each stone before placing it on the subfloor
Use spacers to maintain consistent spacing between stones
Allow the mortar or adhesive to dry completely before grouting the joints
Seal the finished stone floor to protec
based on 1 interview
Interview experience
based on 12 reviews
Rating in categories
Assistant Manager
111
salaries
| ₹3.5 L/yr - ₹12.5 L/yr |
Senior Engineer
63
salaries
| ₹4.3 L/yr - ₹9 L/yr |
Senior Executive
44
salaries
| ₹2.8 L/yr - ₹6.8 L/yr |
Civil Engineer
35
salaries
| ₹2.2 L/yr - ₹7.2 L/yr |
Senior Civil Engineer
32
salaries
| ₹4 L/yr - ₹8.5 L/yr |
Pittie Group
Advance India Projects
Vestian Global Workplace Services
Enrich Energy