i
Siemens
Filter interviews by
I applied via Campus Placement and was interviewed in Jan 2024. There were 3 interview rounds.
It was of 3 section 18-25 questions , just basic QA and verbal ability
Again aptitude of similar level
ABOUT TPM quality control and 5s
Test improvement process involves identifying areas for enhancement and implementing strategies to increase efficiency and effectiveness.
Conducting regular reviews of testing processes and identifying areas for improvement
Implementing new tools or technologies to streamline testing procedures
Providing training and support to team members to enhance their testing skills
Analyzing test results and feedback to identify pat...
Test metrics used in release include test coverage, defect density, test execution progress, and test pass/fail rates.
Test coverage: Percentage of requirements covered by tests
Defect density: Number of defects found per test case or test suite
Test execution progress: Percentage of test cases executed
Test pass/fail rates: Number of test cases passed/failed
Siemens interview questions for popular designations
I applied via Naukri.com and was interviewed in Aug 2024. There was 1 interview round.
Get interview-ready with Top Siemens Interview Questions
I applied via Campus Placement and was interviewed in Jan 2024. There was 1 interview round.
To change the odd bits in a binary number, flip the bits at odd positions and convert the new binary number to decimal form.
Start by converting the given number into binary form.
Identify the odd bits in the binary number (counting from right to left, starting at 1).
Flip the odd bits by changing 1s to 0s and 0s to 1s.
Convert the new binary number into decimal form.
For example, if the given number is 13 (binary 1101), th...
Primary memory is volatile and directly accessible by the CPU, while secondary memory is non-volatile and used for long-term storage.
Primary memory is faster but has limited capacity, while secondary memory is slower but has larger capacity.
Examples of primary memory include RAM and cache memory, while examples of secondary memory include hard drives and SSDs.
Primary memory stores data that is currently being used by t...
I applied via Campus Placement and was interviewed in Jan 2024. There were 2 interview rounds.
Questions based on c++,DSA
To reverse a linked list, iterate through the list and change the direction of pointers.
Iterate through the linked list while keeping track of the previous, current, and next nodes.
Update the pointers of each node to reverse the direction.
Set the new head of the reversed list as the original list's tail.
To return the largest and second largest numbers from an array
Sort the array in descending order
Return the first element as the largest number and the second element as the second largest number
I applied via Company Website and was interviewed before Aug 2023. There were 4 interview rounds.
IEC/IEEE standards provide guidelines for addressing power quality issues in testing.
IEC 61000 series provides standards for electromagnetic compatibility (EMC) testing
IEEE 1159 standard focuses on monitoring and analyzing power quality
IEC 61000-4-30 standardizes measurement methods for power quality parameters
Compliance with these standards ensures reliable and accurate testing results
PQ harmonics refer to the quality of power in electrical grids, including voltage and current harmonics.
PQ harmonics are regulated by grid codes to ensure the quality of power supplied to consumers.
Grid codes specify limits on harmonic distortion levels to prevent negative impacts on equipment and systems.
Examples of grid codes include IEEE 519 and EN 50160.
Harmonics can cause issues such as overheating in transformers
Yes, application software for power quality and energy metering monitoring works effectively.
Application software can effectively monitor power quality and energy metering data
These software can provide real-time data analysis and reporting
Examples include Power Monitoring Software, Energy Management Software, and Smart Metering Software
Present organization at PQ issues encountered? How mitigated,which PQ devices or analyzer used,How it's reported in software etc
I applied via Company Website and was interviewed in Feb 2024. There was 1 interview round.
Top trending discussions
Some of the top questions asked at the Siemens interview -
The duration of Siemens interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 359 interviews
Interview experience
based on 4.7k reviews
Rating in categories
Senior Software Engineer
1.6k
salaries
| ₹9.7 L/yr - ₹33.6 L/yr |
Software Developer
1.6k
salaries
| ₹4.7 L/yr - ₹22.7 L/yr |
Software Engineer
1.5k
salaries
| ₹6 L/yr - ₹23.4 L/yr |
Manager
604
salaries
| ₹8.2 L/yr - ₹32 L/yr |
Senior Executive
484
salaries
| ₹5 L/yr - ₹20.1 L/yr |
Schneider Electric
Siemens Energy
ABB
BHEL