Upload Button Icon Add office photos

Filter interviews by

Shyam Indus Power Solutions Interview Questions, Process, and Tips

Updated 25 Dec 2024

Top Shyam Indus Power Solutions Interview Questions and Answers

View all 18 questions

Shyam Indus Power Solutions Interview Experiences

Popular Designations

11 interviews found

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Nov 2024. There were 2 interview rounds.

Round 1 - Group Discussion 

Through group discussion, we get to know more about safety, through which we also get to know new things.

Round 2 - HR 

(3 Questions)

  • Q1. Every interview also gives information about some new things.
  • Q2. Interview reveals the activities of our subordinates and the department in which we work.
  • Q3. Through interview we also get to know and experience our eligibility.

Interview Preparation Tips

Topics to prepare for Shyam Indus Power Solutions Safety Officer interview:
  • Electrical diploma
  • Diploma in industrial fire and s
Interview preparation tips for other job seekers - For career growth and information about new things

Safety Officer Interview Questions asked at other Companies

Q1. If you don't have any safety equipment and documents how to complete the work ?
View answer (17)
Interview experience
4
Good
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
-

I applied via Approached by Company

Round 1 - Technical 

(5 Questions)

  • Q1. Procudure of procuring the item ?
  • Ans. 

    The procedure of procuring an item involves identifying needs, sourcing suppliers, negotiating contracts, and managing delivery.

    • Identify the need for the item

    • Research potential suppliers

    • Negotiate terms and pricing

    • Create and sign contracts

    • Track delivery and manage inventory

  • Answered by AI
  • Q2. What are Payment terms ?
  • Ans. 

    Payment terms refer to the conditions under which a buyer agrees to pay a seller for goods or services.

    • Payment terms can include the amount due, due date, and any discounts for early payment.

    • Common payment terms include Net 30 (payment due 30 days after invoice date) and 2/10 Net 30 (2% discount if paid within 10 days, otherwise payment due in 30 days).

    • Negotiating favorable payment terms can help improve cash flow and

  • Answered by AI
  • Q3. Chronology of delivering s/s items ?
  • Ans. 

    Delivering s/s items involves a series of steps from procurement to final delivery.

    • Identify the need for s/s items

    • Research and select suppliers

    • Negotiate terms and pricing

    • Place orders and track progress

    • Inspect quality upon delivery

    • Ensure timely delivery to meet project deadlines

  • Answered by AI
  • Q4. Vendors of items ?
  • Ans. 

    Vendors of items are suppliers or manufacturers who provide goods or services to a company for procurement purposes.

    • Vendors play a crucial role in the procurement process by supplying necessary items or services to a company.

    • Companies often have relationships with multiple vendors to ensure a steady supply of goods.

    • Vendors can range from small local businesses to large multinational corporations.

    • Negotiating contracts a...

  • Answered by AI
  • Q5. As usuall family background?
Round 2 - Technical 

(7 Questions)

  • Q1. Full form of SLD & EKD ?
  • Ans. 

    SLD - Single Line Diagram, EKD - Equipment Key Diagram

    • SLD is a simplified notation for representing a power system in electrical engineering

    • EKD is a diagram that shows the key components of equipment in a system

    • SLD is commonly used in electrical engineering for system analysis and design

    • EKD helps in identifying and understanding the key components of equipment in a system

  • Answered by AI
  • Q2. Drawing of Nut & Bolt?
  • Ans. 

    A nut and bolt are mechanical fasteners used to secure two or more objects together.

    • A nut is a small metal block with a hole in the center, used to fasten the bolt in place.

    • A bolt is a threaded cylindrical rod with a head at one end, used to fasten objects together.

    • The nut is screwed onto the bolt to secure the objects in place.

    • Different types of nuts and bolts are available, such as hex nuts and carriage bolts.

  • Answered by AI
  • Q3. Swot & pet questions why should we hire you ?
  • Q4. Family background ?
  • Q5. 400/220/132 kV grid meaning?
  • Ans. 

    400/220/132 kV grid refers to a power grid with three different voltage levels: 400 kV, 220 kV, and 132 kV.

    • 400/220/132 kV grid consists of three different voltage levels for transmission of electricity

    • 400 kV, 220 kV, and 132 kV are the specific voltage levels used in this type of grid

    • Each voltage level serves a specific purpose in the transmission and distribution of power

  • Answered by AI
  • Q6. Transformer make of 400 kV 315 MVA of previous executed project ?
  • Ans. 

    The transformer make of the previous executed project was Siemens.

    • The transformer make was Siemens.

    • It was a 400 kV 315 MVA transformer.

    • This information was from a previous executed project.

  • Answered by AI
  • Q7. OLTC & RTCC Full form ?
  • Ans. 

    OLTC - On Load Tap Changer, RTCC - Remote Tap Changer Controller

    • OLTC stands for On Load Tap Changer, used in transformers to regulate the voltage output

    • RTCC stands for Remote Tap Changer Controller, used to remotely control the tap changer operation

    • Both OLTC and RTCC are essential components in power systems for voltage regulation

  • Answered by AI

Top Shyam Indus Power Solutions Senior Procurement Engineer Interview Questions and Answers

Q1. Transformer make of 400 kV 315 MVA of previous executed project ?
View answer (1)

Senior Procurement Engineer Interview Questions asked at other Companies

Q1. 2. What is supplier selection criteria in your organization ?
View answer (1)
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed before Jun 2023. There were 2 interview rounds.

Round 1 - HR 

(4 Questions)

  • Q1. Tell me about yourself.
  • Q2. Whats your qualification?
  • Q3. Where do you put up?
  • Q4. Expectation of salary.
Round 2 - Technical 

(6 Questions)

  • Q1. Work experiences areas and no of years.
  • Q2. Prepaid expenses treatment.
  • Q3. Project based billings procedures.
  • Ans. 

    Project based billings procedures involve tracking and invoicing clients based on specific projects completed.

    • Establish clear project scopes and timelines to accurately bill clients

    • Track project expenses and hours worked to ensure accurate billing

    • Invoice clients based on milestones or completion of project phases

    • Utilize project management software to streamline billing processes

  • Answered by AI
  • Q4. Balance sheet items classification.
  • Q5. Audit procedures of expenses.
  • Ans. 

    Audit procedures of expenses involve reviewing documentation, testing controls, and analyzing trends to ensure accuracy and compliance.

    • Reviewing expense reports and receipts for accuracy and legitimacy

    • Testing controls related to expense approval processes

    • Analyzing expense trends to identify anomalies or potential fraud

    • Comparing expenses to budgeted amounts or industry benchmarks

    • Interviewing employees involved in expens

  • Answered by AI
  • Q6. TDS sections rates and thresholds.

Interview Preparation Tips

Interview preparation tips for other job seekers - Keep your vision clear.

Internal Audit Executive Interview Questions asked at other Companies

Q1. What is the difference between automobiles industry audit & food industry audit
View answer (1)

I applied via Walk-in

Round 1 - Technical 

(6 Questions)

  • Q1. Related from basic electricals engineering
  • Q2. Related from basic electronics subject
  • Q3. Related Transmission and distribution line
  • Q4. Power factor.speed control of dc motor
  • Ans. 

    Power factor and speed control are important aspects of DC motor operation.

    • Power factor is the ratio of real power to apparent power and affects the efficiency of the motor.

    • Speed control can be achieved through varying the armature voltage or field current.

    • Methods of speed control include rheostat control, voltage control, and pulse width modulation.

    • Improving power factor can be done through the use of capacitors or sy...

  • Answered by AI
  • Q5. Transformers. Circuit breaker and relay
  • Q6. Chopper.diode. gate. hydro Power plant.nuclear power plants.national thermal Power plant

Interview Preparation Tips

Interview preparation tips for other job seekers - Isir i am comfortable for interview after end of July months

Graduate Engineer Trainee (Get) Interview Questions asked at other Companies

Q1. Q: 1 What is IC engine? What is the types of IC engine? Q:2 Difference between Otto cycle and Diesel cycle? What is the process of both cycle and what is the effeciency of both cycle ? Which one is good in effeciency? Q:3 Difference between... read more
View answer (2)

Shyam Indus Power Solutions interview questions for popular designations

 Civil Engineer

 (1)

 Finishing Supervisor,interior Site Supervisor

 (1)

 Graduate Engineer Trainee (Get)

 (1)

 Internal Audit Executive

 (1)

 Junior Accountant

 (1)

 Safety Officer

 (1)

 Senior Engineer

 (1)

 Senior Procurement Engineer

 (1)

Round 1 - Bill 

(2 Questions)

  • Q1. Ur think and thought
  • Q2. Tell about self introduced
Round 2 - One-on-one 

(3 Questions)

  • Q1. One way , i am not understanding
  • Q2. Electrical Working example
  • Ans. 

    Electrical working example

    • Electrical working involves the flow of electric current through a circuit

    • The circuit can be either AC or DC

    • The current can be measured in amperes (A)

    • The voltage can be measured in volts (V)

    • The resistance can be measured in ohms (Ω)

    • Ohm's law states that V = IR, where V is voltage, I is current, and R is resistance

    • Electrical working can involve wiring, circuit design, and troubleshooting

    • Example...

  • Answered by AI
  • Q3. Electric power describe
  • Ans. 

    Electric power is the rate at which electrical energy is transferred or consumed.

    • Electric power is measured in watts (W).

    • It is calculated by multiplying voltage (V) and current (I).

    • Power can be either AC (alternating current) or DC (direct current).

    • Electric power is used to operate various electrical devices and appliances.

    • It is generated by power plants using various sources such as coal, natural gas, nuclear energy,

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - I have 2 year training and 6 months on posting

Junior Accountant Interview Questions asked at other Companies

Q1. Explain heads of income under income tax Act, 1961.
View answer (23)

I applied via Walk-in and was interviewed in Mar 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(1 Question)

  • Q1. Related electrical question

Interview Preparation Tips

Interview preparation tips for other job seekers - Job is necessary in today's date

Site Supervisor Interview Questions asked at other Companies

Q1. What are handover process to civil or facillities
View answer (4)

Jobs at Shyam Indus Power Solutions

View all
Interview experience
3
Average
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed before Jan 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Based on Technical Experience
Round 3 - One-on-one 

(1 Question)

  • Q1. Salary negotiations Based on previous salary

Interview Preparation Tips

Topics to prepare for Shyam Indus Power Solutions Senior Engineer interview:
  • Technical
Interview preparation tips for other job seekers - Having complete knowledge in work Experience and Technical requirements, positive attitude, billing to work.

Senior Engineer Interview Questions asked at other Companies

Q1. what is the meaning of M in M20,M25,M30 grade of concrete?
View answer (54)

I applied via Walk-in and was interviewed before Jan 2021. There were 5 interview rounds.

Interview Questionnaire 

3 Questions

  • Q1. Questions asked regarding past experiences related to work.
  • Q2. Location Mobility in regards to job.
  • Ans. 

    Location mobility is the ability to relocate for job opportunities.

    • Location mobility allows for flexibility in accepting job offers in different locations.

    • It may involve moving to a different city, state, or even country.

    • Candidates with location mobility are more likely to be considered for positions that require travel or have multiple office locations.

    • Having location mobility can also demonstrate a willingness to ada...

  • Answered by AI
  • Q3. Team handling capacities

Interview Preparation Tips

Interview preparation tips for other job seekers - Bknowledge related to your career subject.

Past experience & performance.

Team handling capacity.

Case Study Solution

Senior Supervisor Interview Questions asked at other Companies

Q1. What is standard height between WC Outlet centre to Inlet center?
View answer (1)

I applied via Walk-in and was interviewed before Jun 2018. There was 1 interview round.

Interview Questionnaire 

1 Question

  • Q1. Tell us your questions

Interview Preparation Tips

Interview preparation tips for other job seekers - Dear sir,
I am Ashutosh Ranjan giving interview was a technical one but was majorly a stress test. The interviewer wanted to test both my knowledge and communication skills. Most of the questions asked to me were related to my B.Tech curriculum i.e. Electric related topics. He stressed a lot on the basics related to my project topic. Luckily I was able to answer most of the questions correctly. I tried to answer each question with examples. It was my first offcampus interview, and I think I did pretty well for a fresher. You need to stay calm and should apply presence of mind. Please go through the job description thoroughly word-by-word and recheck your resume to ensure that you are a best-fit for the position. Looking for your positive response.
Thanking you
Date Ashutosh Ranja
8 June 2019 *****
Mb:- XXXXX

Service Maintenance Supervisor Interview Questions asked at other Companies

Q1. How work Wtp, stp, etp, boiler and operation, maintainance, monitoring, pump, shift handling ,etc.
View answer (1)

I applied via Walk-in and was interviewed before Jun 2018. There was 1 interview round.

Interview Questionnaire 

1 Question

  • Q1. Tell us the question

Interview Preparation Tips

Interview preparation tips for other job seekers - Dear sir,
H. O. D(sips)
This interview was a technical one but was majorly a stress test.The interviewer wanted to test both my knowledge and communication skills. Most of the questions asked to me were related to my B.Tech curriculum iletrical related topics. He stressed a lot on the basics related to my project topic. Luckily I was able to answer most of the questions correctly. I tried to answer each question with examples explain my theories. It was my first offcampus interview, and I think I did pretty well for a fresher. . Please go through the job description thoroughly word-by-word and recheck your resume to ensure that you are a best-fit for the position.
Looking for your positive repons.
Thanking you,
Ashutosh ranjan
*****
XXXXX,

Finishing Supervisor,interior Site Supervisor Interview Questions asked at other Companies

Q1. Implantation of mast to rail Difference between isolater and insulater How many types of foundation How many types of mast What is the hight of contact wire to rail level What is acc What do you mean by across the track and along the track ... read more
View answer (1)

Shyam Indus Power Solutions Interview FAQs

How many rounds are there in Shyam Indus Power Solutions interview?
Shyam Indus Power Solutions interview process usually has 2 rounds. The most common rounds in the Shyam Indus Power Solutions interview process are Technical, HR and One-on-one Round.
How to prepare for Shyam Indus Power Solutions interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at Shyam Indus Power Solutions. The most common topics and skills that interviewers at Shyam Indus Power Solutions expect are Accounting, Excel, Internal Audit, SAP and Tally ERP.
What are the top questions asked in Shyam Indus Power Solutions interview?

Some of the top questions asked at the Shyam Indus Power Solutions interview -

  1. What is workabilit...read more
  2. Shear force & Bending moment diagram of ...read more
  3. What is your thoughts abot democrac...read more

Tell us how to improve this page.

Shyam Indus Power Solutions Interview Process

based on 3 interviews in last 1 year

Interview experience

4
  
Good

People are getting interviews through

based on 9 Shyam Indus Power Solutions interviews
WalkIn
Job Portal
67%
11%
22% candidates got the interview through other sources.
Moderate Confidence
?
Moderate Confidence means the data is based on a sufficient number of responses received from the candidates

Interview Questions from Similar Companies

Siemens Interview Questions
4.1
 • 421 Interviews
Thermax Limited Interview Questions
4.2
 • 235 Interviews
Adani Power Interview Questions
3.9
 • 201 Interviews
Tata Power Interview Questions
3.9
 • 157 Interviews
NTPC Interview Questions
4.2
 • 157 Interviews
Suzlon Group Interview Questions
4.1
 • 123 Interviews
BHEL Interview Questions
4.2
 • 103 Interviews
Reliance Power Interview Questions
4.1
 • 43 Interviews
Sterlite Power Interview Questions
4.0
 • 25 Interviews
View all

Shyam Indus Power Solutions Reviews and Ratings

based on 217 reviews

3.8/5

Rating in categories

3.7

Skill development

3.6

Work-Life balance

3.2

Salary & Benefits

3.4

Job Security

3.5

Company culture

3.1

Promotions/Appraisal

3.5

Work Satisfaction

Explore 217 Reviews and Ratings
Hiring For HR Generalist For Gurgaon Location

Gurgaon / Gurugram

3-7 Yrs

₹ 3-5 LPA

Hiring For Company Secretary (CS) / Gurgaon Location

Gurgaon / Gurugram

5-10 Yrs

₹ 6-10 LPA

Hiring For Accounts Manager / Gurgaon Location

Gurgaon / Gurugram

7-12 Yrs

Not Disclosed

Explore more jobs
Site Engineer
42 salaries
unlock blur

₹1.9 L/yr - ₹4.4 L/yr

Civil Site Engineer
29 salaries
unlock blur

₹2.2 L/yr - ₹3.9 L/yr

Store Incharge
23 salaries
unlock blur

₹1.3 L/yr - ₹4 L/yr

Assistant Manager
21 salaries
unlock blur

₹3.5 L/yr - ₹8.9 L/yr

Executive Accountant
17 salaries
unlock blur

₹1.6 L/yr - ₹3.5 L/yr

Explore more salaries
Compare Shyam Indus Power Solutions with

Sterlite Power

4.0
Compare

Adani Power

3.9
Compare

Tata Power

3.9
Compare

Reliance Power

4.1
Compare

Calculate your in-hand salary

Confused about how your in-hand salary is calculated? Enter your annual salary (CTC) and get your in-hand salary
Did you find this page helpful?
Yes No
write
Share an Interview