Material reconciliation is the process of comparing the actual materials used in a project with the estimated materials to ensure accuracy.
Involves comparing the actual quantity of materials used in a project with the estimated quantity
Helps in identifying any discrepancies or variances in material usage
Ensures that the project stays within budget and timelines
Can involve physical counting of materials on site or compa...
Rolling margin is the difference between the selling price and the cost of goods sold, expressed as a percentage.
Rolling margin helps in determining the profitability of a product or service.
It is calculated by subtracting the cost of goods sold from the selling price, dividing the result by the selling price, and then multiplying by 100.
For example, if a product is sold for $100 and the cost of goods sold is $60, the ...
Bend deduction of a ring in BBS is calculated by subtracting the sum of two bend allowances from the total length of the ring.
Calculate the bend allowance for each bend in the ring.
Add the bend allowances together to get the total bend allowance.
Subtract the total bend allowance from the total length of the ring to get the bend deduction.
Bend deduction for ring hook is the amount of material that is removed when bending a ring hook.
Bend deduction is calculated based on the material thickness and bend radius.
It is used to determine the flat pattern length of the material before bending.
For ring hooks, the bend deduction is typically around 1.5 times the material thickness.
The formula for calculating bend deduction is: Bend Deduction = (π/2) x Bend Radiu
I applied via Walk-in and was interviewed in Feb 2023. There were 4 interview rounds.
LD in billing stands for Liquidated Damages, JMR stands for Joint Measurement Report, Mandatory documents include BOQ, drawings, work order, etc.
LD in billing refers to Liquidated Damages, which are penalties imposed on contractors for delays in project completion.
JMR stands for Joint Measurement Report, which is a document used to record measurements taken jointly by the client and contractor to verify quantities of w...
posted on 15 Oct 2023
I applied via Job Portal
Bar methods are deductions taken from a customer's account for services provided at a bar or restaurant.
Bar methods typically include deductions for food, drinks, and any additional services provided at the establishment.
Examples of bar methods deductions may include charges for meals, alcoholic beverages, and gratuity.
These deductions are usually itemized on the customer's bill for transparency and accuracy.
Flyover height methods refer to the different techniques used to determine the height of a flyover structure.
One method is using surveying equipment such as total stations or GPS to measure the height of the flyover from ground level.
Another method is using LiDAR technology to create a 3D model of the flyover and calculate its height.
Drone surveys can also be used to capture aerial images and measurements of the flyove...
IS 1200
I applied via Company Website and was interviewed before Jun 2021. There was 1 interview round.
The interview covered topics such as rates of sub-contractors, billing process, reconciliation, rate analysis, previous project experience, and types of structures encountered.
Explained the process of obtaining rates from sub-contractors and how they are incorporated into the billing process
Discussed the importance of reconciliation in ensuring accurate billing and payment
Described the process of rate analysis and how ...
posted on 16 Jan 2023
I applied via Walk-in and was interviewed in Dec 2022. There were 2 interview rounds.
IS Code of Concrete is IS 456:2000
IS 456:2000 is the Indian Standard code for Plain and Reinforced Concrete
It provides guidelines for the design and construction of concrete structures
The code covers various aspects such as materials, mix design, workmanship, and testing
It ensures the quality and durability of concrete structures
For example, IS 456:2000 specifies the minimum grade of concrete for different types of str
IS 456 is the Indian Standard code for the design and construction of reinforced concrete structures.
IS 456 provides guidelines for the use of reinforced concrete in construction.
It covers the general requirements for the design and construction of reinforced concrete structures.
The code includes provisions for materials, structural design, durability, and safety.
It also provides guidelines for testing and quality cont...
I applied via Approached by Company and was interviewed before Dec 2023. There was 1 interview round.
I applied via Walk-in and was interviewed in Sep 2021. There were 3 interview rounds.
I expect a competitive salary based on my experience and the responsibilities of the role.
Research the average salary range for Senior Billing Engineers in your area
Consider your years of experience and any specialized skills you bring to the role
Factor in the responsibilities and expectations outlined in the job description
Be prepared to negotiate and discuss benefits and other compensation packages
I worked as a Senior Billing Engineer at XYZ Company.
Managed billing processes and systems for multiple clients
Developed and implemented billing strategies to optimize revenue
Collaborated with cross-functional teams to resolve billing issues
Analyzed billing data and generated reports for management
Implemented automation solutions to streamline billing operations
I am an experienced Senior Billing Engineer with a strong background in billing systems and processes.
Over 10 years of experience in billing engineering
Expertise in designing and implementing billing systems
Proficient in analyzing and optimizing billing processes
Strong knowledge of billing software and tools
Proven track record of improving billing accuracy and efficiency
Excellent problem-solving and communication skill
The candidate should politely decline to provide their salary slip.
Politely decline to provide the salary slip
Explain that sharing salary information is confidential and against company policy
Offer to provide other relevant documents or information to demonstrate qualifications
I have worked on multiple government projects related to billing and invoicing.
Developed billing software for a government agency to automate their invoicing process
Managed billing and invoicing for a government healthcare program
Implemented cost tracking system for a government construction project
Collaborated with government officials to ensure compliance with regulations and policies
EPC pattern billing is a method of billing used in engineering, procurement, and construction projects. Item wise billing is a detailed billing method that lists each item separately.
EPC pattern billing is used in large-scale projects where the scope of work is extensive and complex.
It involves breaking down the project into various stages and billing for each stage separately.
Item wise billing is a detailed billing me...
MEP items billing refers to the process of invoicing for mechanical, electrical, and plumbing items used in construction projects.
MEP items include HVAC systems, electrical wiring, plumbing fixtures, and more
Billing is based on the quantity and cost of materials used, as well as labor and overhead expenses
Accurate tracking of MEP items is essential for proper billing and project management
Software such as Bluebeam Revu...
Finishing items billing refers to the process of invoicing for the final stages of a project or service.
Includes billing for any remaining work or materials needed to complete the project
May involve calculating and billing for change orders or additional work
Requires close collaboration with project managers and clients to ensure accuracy
Examples include billing for final touches on a construction project or last-minut...
based on 1 review
Rating in categories
Civil Site Engineer
17
salaries
| ₹1.8 L/yr - ₹4 L/yr |
Project Manager
11
salaries
| ₹6.5 L/yr - ₹12.6 L/yr |
Senior Project Manager
4
salaries
| ₹10.2 L/yr - ₹18 L/yr |
Civil Engineer
4
salaries
| ₹1.8 L/yr - ₹3 L/yr |
Junior Engineer Civil
4
salaries
| ₹2.4 L/yr - ₹2.8 L/yr |
UltraTech Cement
ACC
Ambuja Cements
JK Cement