I applied via Recruitment Consulltant and was interviewed in Oct 2024. There was 1 interview round.
I applied via Approached by Company
I applied via Approached by Company and was interviewed in Jul 2022. There were 2 interview rounds.
I applied via Naukri.com and was interviewed in Mar 2022. There were 3 interview rounds.
Maths
Shivalaya Construction interview questions for popular designations
I applied via Naukri.com and was interviewed in Jul 2021. There was 1 interview round.
Yes, I do price escalation.
Price escalation is the practice of adjusting the cost of a project or product to account for changes in market conditions, such as inflation or fluctuations in material prices.
As an Assistant Quantity Surveyor, I would be responsible for monitoring and managing the cost of a project, which includes considering price escalation factors.
I would analyze market trends, review contracts, and asse...
Yes, sub-contractors often prepare bills as part of their contractual obligations.
Sub-contractors are responsible for providing detailed bills for the work they have completed.
These bills typically include the quantity of materials used, labor costs, and any additional expenses.
Sub-contractors may also include their profit margin in the bill.
The bills prepared by sub-contractors are then reviewed and verified by the ma...
MORTH stands for Ministry of Road Transport and Highways.
MORTH is the abbreviation for Ministry of Road Transport and Highways.
It is a government ministry in India responsible for the development and maintenance of national highways and road infrastructure.
MORTH plays a crucial role in planning, coordinating, and implementing policies for the road transport sector.
The ministry is involved in various activities such as ...
The formula for the length of steel is used to calculate the length of steel required for a project.
The formula for the length of steel is: Length = (Weight / Density) * 1000
Weight is the weight of the steel in kilograms
Density is the density of the steel in kilograms per cubic meter
The result is multiplied by 1000 to convert the length from meters to millimeters
For example, if the weight of the steel is 1000 kg and th...
I applied via Walk-in and was interviewed before Nov 2021. There were 2 interview rounds.
I applied via Company Website and was interviewed before Aug 2021. There were 3 interview rounds.
I am currently earning a CTC of Rs X per annum.
My current CTC is Rs X per annum.
I am earning a total compensation of Rs X annually.
My current salary package is Rs X per year.
I am being paid a CTC of Rs X per annum.
My current annual package is Rs X.
Top trending discussions
Quantitative reasoning
posted on 22 Dec 2024
The output voltage of an AAAC Rabbit conductor is typically around 600 volts.
The output voltage of an AAAC Rabbit conductor is usually around 600 volts.
The exact output voltage may vary depending on the specific application and conditions.
It is important to consult the manufacturer's specifications for accurate information.
My execution work plan involves setting clear goals, creating a timeline, assigning tasks, monitoring progress, and adjusting as needed.
Set clear goals and objectives for the project
Create a detailed timeline with milestones and deadlines
Assign tasks to team members based on their strengths and expertise
Regularly monitor progress and make adjustments as needed
Communicate effectively with team members and stakeholders
Ut...
Job safety analysis is a process of identifying potential hazards in a job task and implementing controls to mitigate risks.
Involves breaking down a job task into steps
Identifying potential hazards for each step
Determining preventive measures to reduce risks
Ensures workers are aware of safety procedures
Examples: construction site JSA, manufacturing plant JSA
Hazard identification is the process of identifying potential sources of harm in the workplace, while risk assessment involves evaluating the likelihood and severity of those hazards.
Hazard identification involves identifying potential sources of harm such as chemicals, machinery, or ergonomic factors.
Risk assessment involves evaluating the likelihood and severity of harm from these hazards.
The goal is to implement con...
Fire safety refers to measures taken to prevent and protect against the risks of fire.
Fire safety includes having working smoke detectors in place.
It also involves creating and practicing a fire escape plan.
Proper storage and handling of flammable materials is crucial for fire safety.
Regular maintenance of fire extinguishers and other fire safety equipment is important.
Training employees on fire safety protocols is ess
A hazard site is a location where there is a potential risk of harm to people, property, or the environment.
Hazard sites can include industrial facilities, chemical plants, nuclear power plants, and construction sites.
These sites may contain hazardous materials, dangerous equipment, or unsafe conditions.
Proper safety measures and protocols must be followed at hazard sites to prevent accidents and injuries.
Examples of h...
Interview experience
based on 179 reviews
Rating in categories
Executive Accountant
23
salaries
| ₹2.4 L/yr - ₹4.8 L/yr |
Highway Engineer
23
salaries
| ₹2.4 L/yr - ₹6 L/yr |
Structural Engineer
22
salaries
| ₹1.5 L/yr - ₹5.4 L/yr |
Civil Site Engineer
16
salaries
| ₹1.6 L/yr - ₹4.5 L/yr |
Mechanical Engineer
14
salaries
| ₹2.4 L/yr - ₹3.7 L/yr |
Larsen & Toubro Limited
Tata Projects
Punj Lloyd
GAMMON INDIA