Mivan formwork is a construction technique that uses aluminum formwork system for casting concrete structures.
Mivan formwork involves setting up aluminum formwork panels, fixing reinforcement bars, pouring concrete, and removing the formwork after the concrete has set.
It is a fast and efficient construction method commonly used for high-rise buildings and large residential projects.
The system allows for smooth finishes...
I applied via Naukri.com and was interviewed in Dec 2019. There were 3 interview rounds.
I applied via Referral and was interviewed before May 2023. There was 1 interview round.
RMC reconciliation involves comparing the quantity of materials ordered with the quantity used in construction to ensure accuracy.
Collect all the data related to RMC (Ready Mix Concrete) orders and deliveries.
Compare the quantity of RMC ordered with the quantity actually used in construction.
Identify any discrepancies and investigate the reasons behind them.
Adjust the records accordingly to ensure accurate billing and
BBS (Bar Bending Schedule) is calculated by determining the quantity of steel reinforcement required for a particular concrete structure.
Calculate the total length of bars required for each diameter and type of reinforcement.
Determine the number of bars required for each diameter and type of reinforcement.
Calculate the total weight of bars required for each diameter and type of reinforcement.
Prepare a detailed schedule...
Paint measurements can be checked using a paint thickness gauge to ensure compliance with specifications.
Use a paint thickness gauge to measure the thickness of the paint layer.
Compare the measured thickness with the specified thickness in the project specifications.
Ensure that the paint thickness is uniform across the surface.
Repeat the measurements at multiple points to ensure accuracy.
Adjust the paint application if...
Extra items for WO amendment can be found by reviewing project specifications, consulting with stakeholders, conducting site visits, and analyzing previous change orders.
Review project specifications for any missed items or changes
Consult with stakeholders such as architects, engineers, and contractors for input
Conduct site visits to identify any additional work required
Analyze previous change orders to see if any item
Consider JMR based on project specifications, quantities, rates, and market conditions.
Review project specifications to ensure accurate billing
Verify quantities of materials and work done
Check rates for labor, materials, and equipment
Consider market conditions for pricing accuracy
I applied via Company Website and was interviewed in Mar 2024. There was 1 interview round.
Mix design is the process of determining the proportions of cement, water, aggregates, and admixtures in concrete to achieve desired properties.
Determine the required strength and durability of the concrete
Select suitable materials such as cement, aggregates, water, and admixtures
Calculate the proportions of each material based on desired properties and specifications
Perform trial mixes to test the properties of the co...
I applied via Walk-in and was interviewed before Nov 2023. There were 2 interview rounds.
25 Civil Engineering related Questions
posted on 22 Nov 2023
I applied via Naukri.com and was interviewed before Nov 2022. There were 3 interview rounds.
I applied via Walk-in and was interviewed in May 2022. There were 2 interview rounds.
Construction material and techniques
Construction labour management
Site work
I applied via Newspaper Ad and was interviewed before Aug 2021. There were 2 interview rounds.
based on 1 interview
Interview experience
based on 8 reviews
Rating in categories
Structural Engineer
26
salaries
| ₹1.5 L/yr - ₹5.4 L/yr |
Highway Engineer
25
salaries
| ₹2.5 L/yr - ₹6 L/yr |
Executive Accountant
23
salaries
| ₹2.4 L/yr - ₹4.8 L/yr |
Store Keeper
16
salaries
| ₹2.5 L/yr - ₹5.4 L/yr |
Civil Site Engineer
15
salaries
| ₹1.6 L/yr - ₹4.5 L/yr |
Lea Associates South Asia
McNally Bharat Engineering
R.V.R. PROJECTS
ABCI Infrastructures