I applied via Naukri.com and was interviewed in Sep 2023. There was 1 interview round.
Concrete compensation percentage varies based on factors like experience, location, and company size.
Concrete compensation percentage can range from 5% to 20% of the total project cost.
Factors influencing concrete compensation percentage include experience level of the engineer, location of the project, and size of the company.
For example, a junior civil site engineer may receive a lower percentage compared to a senior...
Concrete setting is the process in which concrete hardens and gains strength over time.
Concrete setting is the transformation of concrete from a plastic state to a hardened state.
It involves a chemical reaction called hydration, where water reacts with the cement in the concrete mixture.
The setting time of concrete can vary depending on factors like temperature, humidity, and mix design.
Proper curing is essential to en...
Column cover size refers to the dimensions of the material used to cover or encase a structural column.
Column cover size is typically specified in terms of width, depth, and height.
It is important to consider the aesthetic and functional requirements when determining the column cover size.
Examples of column cover materials include metal, wood, stone, or composite materials.
Column cover size can vary depending on the de...
The size of a parapet wall can vary depending on the specific design requirements and building codes.
The typical height of a parapet wall is around 3 feet, but it can be higher for safety reasons or aesthetic purposes.
The thickness of a parapet wall is usually around 8 inches to provide structural support.
The length of a parapet wall will depend on the length of the building facade it is protecting.
Parapet walls can be...
Concrete ratio is the proportion of cement, sand, and aggregate in a concrete mix.
Concrete ratio is typically expressed as a ratio of cement:sand:aggregate, such as 1:2:4.
The ratio may vary depending on the strength and durability requirements of the concrete mix.
Common concrete ratios include 1:1.5:3, 1:2:4, and 1:3:6.
The grade of concrete (e.g. M20, M25) also determines the concrete ratio.
Beam cover is the distance between the outer face of the concrete beam and the outer face of the column or slab.
Beam cover is important for protecting the reinforcement bars from corrosion and fire damage.
It also helps in providing adequate strength and durability to the structure.
The beam cover requirement may vary based on the type of structure and environmental conditions.
For example, in coastal areas where there is...
posted on 13 Nov 2023
I applied via Approached by Company and was interviewed in Oct 2023. There were 3 interview rounds.
Civil engineering building construction, metro project surveying
posted on 18 Oct 2024
I applied via Referral and was interviewed before Oct 2023. There was 1 interview round.
Allowable wastage of steel in construction projects is typically around 2-3%.
Allowable wastage of steel is usually around 2-3% in construction projects.
Wastage can occur due to cutting, bending, and handling of steel bars.
Excessive wastage can lead to cost overruns and delays in construction.
Contractors should aim to minimize wastage through careful planning and efficient use of materials.
Building construction process involves planning, designing, permitting, and construction phases.
Planning phase includes site selection, feasibility studies, and budgeting.
Designing phase involves architectural and structural design.
Permitting phase requires obtaining necessary approvals and permits from local authorities.
Construction phase includes site preparation, foundation work, structural framing, and finishing.
Qu...
Quantity estimation of concrete, steel, and earthwork involves calculating the amount of materials needed for a construction project.
Calculate the volume of concrete required by multiplying the dimensions of the structure (length, width, height) and adding a suitable wastage factor.
Estimate the quantity of steel by determining the total length of bars needed based on the structural drawings and specifications.
For earth...
posted on 30 Jun 2022
I applied via Referral and was interviewed in May 2022. There were 4 interview rounds.
Question related to civil engineering
Civil site engineers are responsible for overseeing construction projects and ensuring they meet safety and quality standards.
Supervising construction projects
Ensuring compliance with safety and quality standards
Collaborating with architects and contractors
Managing budgets and timelines
Performing site inspections and surveys
Preparing reports and documentation
Assignment of any RCC work which done on site.
I applied via Naukri.com and was interviewed in Apr 2021. There were 4 interview rounds.
I applied via Approached by Company and was interviewed before Feb 2023. There were 2 interview rounds.
The question asks about years of experience in a construction company, plaster work size, and M20 grade concrete ratio.
Years of experience in a construction company
Plaster work size
M20 grade concrete ratio
posted on 7 Oct 2021
The size of bricks varies depending on the country and region they are used in.
In the United States, the standard size for bricks is 2 1/4 x 3 3/4 x 8 inches.
In the United Kingdom, the standard size for bricks is 65mm x 102.5mm x 215mm.
Bricks can also come in different shapes and sizes for specific purposes, such as bullnose bricks for rounded edges.
The size of bricks can affect the strength and stability of a structur...
posted on 19 Jul 2021
A site engineer is responsible for overseeing construction projects and ensuring they are completed according to plans and specifications. A supervisor is a higher-level position that manages and coordinates the work of site engineers and other construction personnel.
Site engineer: responsible for overseeing construction projects, ensuring compliance with plans and specifications
Supervisor: higher-level position that m...
based on 2 reviews
Rating in categories
Civil Site Engineer
14
salaries
| ₹2.4 L/yr - ₹4 L/yr |
Accountant
6
salaries
| ₹1.9 L/yr - ₹3.2 L/yr |
Senior Engineer
4
salaries
| ₹3.6 L/yr - ₹6.2 L/yr |
Project Engineer
4
salaries
| ₹1.5 L/yr - ₹5.4 L/yr |
Junior Engineer
4
salaries
| ₹1.5 L/yr - ₹3 L/yr |
Larsen & Toubro Limited
Tata Projects
Hindustan Construction Company
Simplex Infrastructures