Section and elevation drawings of a bathroom
Include dimensions for all fixtures and fittings
Show the placement of plumbing lines and electrical outlets
Label materials and finishes for walls, floors, and fixtures
A leading engineering company specializing in innovative solutions for various industries.
Provides cutting-edge engineering solutions
Works with a wide range of industries such as automotive, aerospace, and technology
Focuses on research and development to stay ahead of the competition
Received positive feedback on technical skills and leadership abilities.
Received commendation for successfully leading a team in completing a major project ahead of schedule
Recognized for consistently providing innovative solutions to complex technical challenges
Received high ratings for communication skills and ability to collaborate effectively with cross-functional teams
Execution of steel and shuttering involves the proper planning, design, and installation of these materials for construction projects.
Steel reinforcement bars must be placed in the correct location and spacing to ensure structural integrity.
Shuttering must be properly designed and installed to create the desired shape and size of concrete structures.
Both steel and shuttering must be inspected regularly to ensure they a...
I applied via Campus Placement and was interviewed in May 2024. There were 2 interview rounds.
The aptitude test consists of logical reasoning, quantity and time related questions. The questions aren't that difficult if prepared well.
I applied via Walk-in and was interviewed in Sep 2023. There were 3 interview rounds.
RCC structure is a reinforced concrete structure commonly used in construction.
RCC structures consist of concrete reinforced with steel bars for added strength
Common types of RCC structures include beams, columns, slabs, and walls
RCC structures are designed to withstand heavy loads and provide durability
Proper reinforcement detailing is crucial for the structural integrity of RCC structures
MEP drawings are detailed plans that show the mechanical, electrical, and plumbing systems of a building.
MEP drawings include layouts for HVAC systems, electrical wiring, plumbing fixtures, and fire protection systems.
They are essential for coordinating the installation of these systems during construction.
MEP drawings also indicate the location of equipment, materials, and connections needed for the systems to functio...
A section of plumbing typically includes pipes, fittings, and fixtures for water supply and drainage systems.
Include pipes for both water supply and drainage systems
Show fittings such as elbows, tees, and couplings
Include fixtures like sinks, toilets, and showers
posted on 23 May 2024
Internal plaster thickness and ratio are important factors in construction projects.
The standard thickness of internal plaster is usually 12mm for walls and 15mm for ceilings.
The ratio of internal plaster is typically 1:6 (1 part cement to 6 parts sand).
The thickness and ratio may vary depending on the specific requirements of the project and the type of surface being plastered.
Slab checking involves verifying the structural integrity and load-bearing capacity of concrete slabs.
Check for proper reinforcement placement and spacing
Verify concrete mix design and curing process
Inspect for any cracks or defects
Ensure slab thickness meets design specifications
Perform load testing if necessary
External plaster thickness and ratio are determined based on the type of surface and desired finish.
External plaster thickness typically ranges from 12mm to 20mm depending on the surface condition.
The ratio of external plaster mix is usually 1:4 (cement:sand) for rough surfaces and 1:6 for smooth finishes.
For better adhesion, a bonding agent may be added to the plaster mix.
Proper curing is essential to ensure the stren
based on 1 interview
Interview experience
based on 1 review
Rating in categories
Assistant Manager
32
salaries
| ₹5 L/yr - ₹9.4 L/yr |
Junior Engineer
19
salaries
| ₹2.5 L/yr - ₹3.7 L/yr |
Senior Engineer
18
salaries
| ₹6 L/yr - ₹9.8 L/yr |
Site Engineer
18
salaries
| ₹3.6 L/yr - ₹8.6 L/yr |
Executive
17
salaries
| ₹1.9 L/yr - ₹5.2 L/yr |
Realty Assistant
Kunal Structure
Omkar Realtors and Developers Group
HM Group