Delay analysis is a process of identifying and analyzing the causes of delay in a project.
Delay analysis helps in identifying the root cause of delay in a project
It involves analyzing the critical path of the project and identifying the activities that caused the delay
Delay analysis can be done using various techniques such as retrospective analysis, prospective analysis, and windows analysis
It helps in determining the...
EOT claim is made when a project is delayed beyond the agreed completion date.
EOT claim is made when there is a delay in the project beyond the agreed completion date.
It is usually made by the contractor to the client or employer.
The claim should be supported by evidence such as records of delays, weather reports, etc.
The claim should also include a detailed analysis of the impact of the delay on the project schedule a...
Top trending discussions
posted on 4 Jul 2021
posted on 5 Dec 2023
I applied via Walk-in and was interviewed before Dec 2022. There were 2 interview rounds.
I applied via Walk-in and was interviewed before Jan 2022. There were 2 interview rounds.
I am unable to provide my previous salary as it is confidential. However, I am expecting a competitive salary based on my qualifications and experience.
My previous salary is confidential and I am unable to disclose it.
I am expecting a salary that is commensurate with my qualifications and experience.
I am open to discussing salary expectations during the negotiation process.
I believe that a competitive salary is importa...
posted on 6 Apr 2024
M25 ratio refers to the mix ratio of concrete, commonly used in construction projects.
M25 ratio is 1:1:2, which means 1 part cement, 1 part sand, and 2 parts aggregate.
This mix is commonly used for structural concrete works like columns, beams, and slabs.
The strength of concrete with M25 ratio is typically around 25 megapascals after 28 days of curing.
I applied via Recruitment Consulltant and was interviewed before May 2021. There was 1 interview round.
Blinding is the process of isolating a section of a pipeline or equipment to prevent flow or contamination.
Temporary or permanent blinds can be used depending on the situation
Common types of blinds include spectacle blinds, paddle blinds, and bleed rings
Blinding is often used during maintenance or repair work to ensure safety
Blinding can also be used to prevent contamination during storage or transportation
Blinding can...
Before starting work in a refinery equipment, certain procedures must be followed.
Obtain a work permit
Perform a safety check of the equipment
Ensure proper personal protective equipment is worn
Verify that all valves are in the correct position
Confirm that the equipment is properly grounded
Check for any leaks or abnormal conditions
Communicate with other workers in the area
Follow all established procedures and protocols
I will follow the emergency response plan and evacuate the area immediately.
Activate the alarm system to alert others in the area
Put on personal protective equipment (PPE) including a respirator
Evacuate the area immediately and move to a safe location
Notify emergency services and follow the emergency response plan
Monitor the situation and wait for the all-clear signal before returning to the area
I would advise my workers to start unbolting the heat exchanger head from the top and work their way down.
Start from the top and work your way down
Use appropriate tools and safety equipment
Follow proper procedures and guidelines
Ensure all bolts are properly labeled and accounted for
Inspect the gasket and replace if necessary
posted on 28 Jul 2022
I applied via LinkedIn and was interviewed in Jun 2022. There were 2 interview rounds.
CFBC Boiler related questions
I applied via Naukri.com and was interviewed in May 2021. There were 3 interview rounds.
The height of top guard rails, mid rails, and toe board rails varies depending on the specific application and regulations.
The height of top guard rails is typically between 42 and 45 inches above the walking surface.
Mid rails are typically located halfway between the top rail and the walking surface.
Toe board rails are typically between 4 and 6 inches high and are installed at the base of the guardrail system.
Specific...
Safe working load is the maximum weight a structure or equipment can safely support without risk of failure.
SWL is determined by factors such as material strength, design, and intended use.
Formula for SWL varies depending on the type of equipment or structure.
For example, the SWL formula for a crane may take into account the boom length, angle, and weight distribution.
It is important to always follow the manufacturer's...
The previous projects involved various types of formwork with a total shuttering area of approximately 10,000 square meters.
Used traditional timber formwork for a residential building project
Implemented modular steel formwork for a commercial complex
Utilized aluminum formwork for a high-rise construction
Employed tunnel formwork for an underground structure
based on 1 review
Rating in categories
Project Engineer
10
salaries
| ₹12 L/yr - ₹24 L/yr |
Civil Site Engineer
8
salaries
| ₹6 L/yr - ₹10.2 L/yr |
Store Incharge
8
salaries
| ₹4.2 L/yr - ₹8.1 L/yr |
Quantity Surveyor
6
salaries
| ₹20 L/yr - ₹25 L/yr |
QA QC Engineer
6
salaries
| ₹7.8 L/yr - ₹18.9 L/yr |
J K Fenner
Saudi Binladin Group
Congruex Asia Pacific
Bahwan Engineering