Q1. Work method statement of slab conduiting, Plumbing pipe installation, Fire Fighting pipe installation.
A work method statement outlines the procedures and steps involved in slab conduiting, plumbing pipe installation, and fire fighting pipe installation.
Slab conduiting involves the installation of conduits within the concrete slab to accommodate electrical and communication wiring.
Plumbing pipe installation includes the fitting and connection of pipes for water supply and drainage systems.
Fire fighting pipe installation involves the installation of pipes and fittings for fire ...read more
Q2. Difference between earthing and grounding
Earthing and grounding are terms used interchangeably, but they have different meanings and applications.
Earthing refers to the process of connecting electrical systems to the ground to prevent electric shock and protect against lightning strikes.
Grounding, on the other hand, involves creating a low-resistance path between an electrical circuit and the earth to ensure proper functioning and safety.
Earthing is primarily concerned with safety, while grounding focuses on electri...read more
Q3. Building SLD FROM HT PANEL TO METER ROOM
The Single Line Diagram (SLD) shows the electrical connections from the HT panel to the meter room.
The SLD should include all the electrical components and their interconnections.
It should show the main HT panel, distribution boards, transformers, cables, and meters.
The SLD should indicate the ratings, sizes, and types of equipment used.
It should follow the electrical code and standards applicable to the project.
The SLD helps in understanding the electrical system layout and ...read more
Q4. Prepare a small given example site schedule with sequencing and duration determine project duration in MSP/on Paper What is critical path method? How will you identify while making on paper rather than MSP? How...
read moreAnswering questions related to Planning Engineer role
Prepare a site schedule with sequencing and duration to determine project duration in MSP/on paper
Critical Path Method (CPM) is a project management technique to identify the longest path of planned activities to determine the shortest possible project duration
To identify critical path on paper, draw a network diagram and calculate the earliest start and finish times for each activity
Schedule tracking involves comparing act...read more
Q5. What is density of steel, cement?
The density of steel and cement varies depending on the type and composition.
The density of steel ranges from 7,750 to 8,050 kg/m³.
The density of cement ranges from 1,100 to 1,500 kg/m³.
Different types of steel and cement may have slightly different densities.
Density is an important property to consider in construction and engineering calculations.
Q6. Why curing done, how much carpentor can do work
Curing is done to strengthen and protect the wood, a carpenter can work efficiently depending on their skills and experience.
Curing is done to remove moisture from the wood, preventing warping and cracking.
Carpenters with experience can work faster and more efficiently due to their knowledge of different techniques and tools.
The amount of work a carpenter can do also depends on the complexity of the project and the availability of materials.
Properly cured wood is easier to wo...read more
Q7. Cutting length of beam ring
Cutting length of beam ring is the length of steel required to form a complete ring around the beam.
The cutting length of beam ring is calculated by adding the circumference of the beam to twice the development length of the steel.
The development length of the steel is the length required for the steel to fully bond with the concrete.
The cutting length of beam ring is important for determining the amount of steel required for the reinforcement of the beam.
The formula for calc...read more