Filter interviews by
I applied via Walk-in and was interviewed before Mar 2022. There were 4 interview rounds.
Answering questions related to Planning Engineer role
Prepare a site schedule with sequencing and duration to determine project duration in MSP/on paper
Critical Path Method (CPM) is a project management technique to identify the longest path of planned activities to determine the shortest possible project duration
To identify critical path on paper, draw a network diagram and calculate the earliest start and finish times...
I applied via Walk-in and was interviewed in Sep 2023. There were 3 interview rounds.
I applied via Referral and was interviewed before Jul 2022. There were 3 interview rounds.
Curing is done to strengthen and protect the wood, a carpenter can work efficiently depending on their skills and experience.
Curing is done to remove moisture from the wood, preventing warping and cracking.
Carpenters with experience can work faster and more efficiently due to their knowledge of different techniques and tools.
The amount of work a carpenter can do also depends on the complexity of the project and the ava...
I applied via Naukri.com and was interviewed in Jul 2021. There was 1 interview round.
The Single Line Diagram (SLD) shows the electrical connections from the HT panel to the meter room.
The SLD should include all the electrical components and their interconnections.
It should show the main HT panel, distribution boards, transformers, cables, and meters.
The SLD should indicate the ratings, sizes, and types of equipment used.
It should follow the electrical code and standards applicable to the project.
The SL...
Earthing and grounding are terms used interchangeably, but they have different meanings and applications.
Earthing refers to the process of connecting electrical systems to the ground to prevent electric shock and protect against lightning strikes.
Grounding, on the other hand, involves creating a low-resistance path between an electrical circuit and the earth to ensure proper functioning and safety.
Earthing is primarily...
A work method statement outlines the procedures and steps involved in slab conduiting, plumbing pipe installation, and fire fighting pipe installation.
Slab conduiting involves the installation of conduits within the concrete slab to accommodate electrical and communication wiring.
Plumbing pipe installation includes the fitting and connection of pipes for water supply and drainage systems.
Fire fighting pipe installation...
SCON Projects interview questions for popular designations
I applied via Walk-in and was interviewed before Jul 2020. There was 1 interview round.
The density of steel and cement varies depending on the type and composition.
The density of steel ranges from 7,750 to 8,050 kg/m³.
The density of cement ranges from 1,100 to 1,500 kg/m³.
Different types of steel and cement may have slightly different densities.
Density is an important property to consider in construction and engineering calculations.
Cutting length of beam ring is the length of steel required to form a complete ring around the beam.
The cutting length of beam ring is calculated by adding the circumference of the beam to twice the development length of the steel.
The development length of the steel is the length required for the steel to fully bond with the concrete.
The cutting length of beam ring is important for determining the amount of steel requi...
Top trending discussions
I appeared for an interview before Jul 2016.
posted on 20 Feb 2015
posted on 10 Sep 2015
I applied via PLACEMENT
posted on 10 Sep 2017
I appeared for an interview before Sep 2016.
based on 10 interviews
Interview experience
based on 136 reviews
Rating in categories
Planning Engineer
36
salaries
| ₹3 L/yr - ₹8.4 L/yr |
Safety Officer
27
salaries
| ₹2 L/yr - ₹4.5 L/yr |
Senior Engineer
20
salaries
| ₹4 L/yr - ₹7.4 L/yr |
Junior Engineer Civil
18
salaries
| ₹1.2 L/yr - ₹3.5 L/yr |
Junior Engineer
17
salaries
| ₹1.8 L/yr - ₹4.8 L/yr |
Larsen & Toubro Limited
TCS
Hindustan Construction Company
BHEL