I applied via Walk-in and was interviewed in Sep 2023. There were 3 interview rounds.
I applied via Walk-in and was interviewed before Mar 2022. There were 4 interview rounds.
Answering questions related to Planning Engineer role
Prepare a site schedule with sequencing and duration to determine project duration in MSP/on paper
Critical Path Method (CPM) is a project management technique to identify the longest path of planned activities to determine the shortest possible project duration
To identify critical path on paper, draw a network diagram and calculate the earliest start and finish times...
I applied via Referral and was interviewed before Jul 2022. There were 2 interview rounds.
Curing is done to strengthen and protect the wood, a carpenter can work efficiently depending on their skills and experience.
Curing is done to remove moisture from the wood, preventing warping and cracking.
Carpenters with experience can work faster and more efficiently due to their knowledge of different techniques and tools.
The amount of work a carpenter can do also depends on the complexity of the project and the ava...
I applied via Naukri.com and was interviewed in Jul 2021. There was 1 interview round.
The Single Line Diagram (SLD) shows the electrical connections from the HT panel to the meter room.
The SLD should include all the electrical components and their interconnections.
It should show the main HT panel, distribution boards, transformers, cables, and meters.
The SLD should indicate the ratings, sizes, and types of equipment used.
It should follow the electrical code and standards applicable to the project.
The SL...
Earthing and grounding are terms used interchangeably, but they have different meanings and applications.
Earthing refers to the process of connecting electrical systems to the ground to prevent electric shock and protect against lightning strikes.
Grounding, on the other hand, involves creating a low-resistance path between an electrical circuit and the earth to ensure proper functioning and safety.
Earthing is primarily...
A work method statement outlines the procedures and steps involved in slab conduiting, plumbing pipe installation, and fire fighting pipe installation.
Slab conduiting involves the installation of conduits within the concrete slab to accommodate electrical and communication wiring.
Plumbing pipe installation includes the fitting and connection of pipes for water supply and drainage systems.
Fire fighting pipe installation...
SCON Projects interview questions for popular designations
I applied via Walk-in and was interviewed before Jul 2020. There was 1 interview round.
The density of steel and cement varies depending on the type and composition.
The density of steel ranges from 7,750 to 8,050 kg/m³.
The density of cement ranges from 1,100 to 1,500 kg/m³.
Different types of steel and cement may have slightly different densities.
Density is an important property to consider in construction and engineering calculations.
Cutting length of beam ring is the length of steel required to form a complete ring around the beam.
The cutting length of beam ring is calculated by adding the circumference of the beam to twice the development length of the steel.
The development length of the steel is the length required for the steel to fully bond with the concrete.
The cutting length of beam ring is important for determining the amount of steel requi...
Top trending discussions
posted on 10 Feb 2025
I was interviewed in Jan 2025.
Quantitative reasoning
posted on 22 Dec 2024
The output voltage of an AAAC Rabbit conductor is typically around 600 volts.
The output voltage of an AAAC Rabbit conductor is usually around 600 volts.
The exact output voltage may vary depending on the specific application and conditions.
It is important to consult the manufacturer's specifications for accurate information.
My execution work plan involves setting clear goals, creating a timeline, assigning tasks, monitoring progress, and adjusting as needed.
Set clear goals and objectives for the project
Create a detailed timeline with milestones and deadlines
Assign tasks to team members based on their strengths and expertise
Regularly monitor progress and make adjustments as needed
Communicate effectively with team members and stakeholders
Ut...
I applied via Walk-in and was interviewed in Jul 2024. There was 1 interview round.
Bar bending schedule is a document that provides details of reinforcement steel bars used in construction projects.
It includes details such as bar mark, bar size, quantity, shape, and bending dimensions.
Helps in estimating the quantity of steel required for construction.
Ensures proper placement and bending of reinforcement bars as per design specifications.
Used by contractors, engineers, and construction workers for re...
28 days concrete strength is the standard measure of concrete's compressive strength after 28 days of curing.
28 days concrete strength is the standard measure of concrete's compressive strength after 28 days of curing
It is important for assessing the quality of concrete and its ability to support structural loads
The strength of concrete typically continues to increase beyond 28 days, but 28 days is the standard testing
Mivan is a modern construction technique using aluminum formwork, while conventional construction involves traditional methods like brick and mortar.
Mivan is faster and more efficient than conventional construction methods.
Mivan requires skilled labor for installation of aluminum formwork.
Conventional construction is more labor-intensive and time-consuming.
Mivan provides better quality finishes compared to conventional...
Self leveling concrete is a type of concrete that has a high flow consistency and is used to create smooth and level surfaces.
Self leveling concrete is designed to flow easily and settle into place without the need for troweling or leveling.
It is commonly used to level uneven floors before installing flooring materials such as tile or carpet.
Self leveling concrete can be applied in thicknesses ranging from a featheredg...
The 1st Aluform mockup concreting typically takes 1-2 days to complete.
1-2 days is the usual timeframe for 1st Aluform mockup concreting
Factors such as weather conditions, size of the mockup, and availability of resources can affect the duration
Proper planning and coordination can help expedite the process
posted on 2 Aug 2024
I applied via Company Website
The company is currently in a stable financial position with ongoing projects and a strong reputation in the industry.
Company has a strong financial position
Ongoing projects are in progress
Company has a good reputation in the industry
Employee growth refers to the development and advancement of an individual within their career.
Employee growth involves acquiring new skills and knowledge
It includes taking on more responsibilities and challenges
Career progression and promotions are indicators of employee growth
Action points at site level refer to specific tasks or activities that need to be completed on the construction site.
Action points are typically identified during site inspections or progress meetings.
They can include tasks such as resolving design issues, coordinating with subcontractors, or ensuring compliance with regulations.
Examples of action points could be revising drawings to address conflicts, obtaining necess...
based on 8 interviews
Interview experience
based on 133 reviews
Rating in categories
Planning Engineer
35
salaries
| ₹3 L/yr - ₹7.6 L/yr |
Safety Officer
27
salaries
| ₹2 L/yr - ₹4.5 L/yr |
Junior Engineer Civil
18
salaries
| ₹1.2 L/yr - ₹3.5 L/yr |
Senior Engineer
18
salaries
| ₹4 L/yr - ₹7.4 L/yr |
Junior Engineer
17
salaries
| ₹1.8 L/yr - ₹4.8 L/yr |
Larsen & Toubro Limited
TCS
Hindustan Construction Company
BHEL