Upload Button Icon Add office photos

SCON Projects

Compare button icon Compare button icon Compare

Filter interviews by

SCON Projects Interview Questions, Process, and Tips

Updated 10 Oct 2023

Top SCON Projects Interview Questions and Answers

View all 7 questions

SCON Projects Interview Experiences

Popular Designations

5 interviews found

MEP Engineer Interview Questions & Answers

user image Anonymous

posted on 10 Oct 2023

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Sep 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(1 Question)

  • Q1. Basic information about yourself
Round 3 - Technical 

(1 Question)

  • Q1. Asked questions regy MEP services and installation

MEP Engineer Interview Questions asked at other Companies

Q1. Work method statement of slab conduiting, Plumbing pipe installation, Fire Fighting pipe installation.
View answer (4)
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed before Mar 2022. There were 4 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - One-on-one 

(2 Questions)

  • Q1. Basic technical questions Unit conversion Grade of Steel, Cement, concrete their proportion Types of Bricks, brickwork bonds, types of plaster Activity with sequences Quantification for simple example
  • Q2. Your Background, Location preference, Salary expectation
Round 3 - One-on-one 

(2 Questions)

  • Q1. More in depth technical questions regarding your job profile, with salary negotiation
  • Q2. Prepare a small given example site schedule with sequencing and duration determine project duration in MSP/on Paper What is critical path method? How will you identify while making on paper rather than MSP...
  • Ans. 

    Answering questions related to Planning Engineer role

    • Prepare a site schedule with sequencing and duration to determine project duration in MSP/on paper

    • Critical Path Method (CPM) is a project management technique to identify the longest path of planned activities to determine the shortest possible project duration

    • To identify critical path on paper, draw a network diagram and calculate the earliest start and finish times...

  • Answered by AI
Round 4 - One-on-one 

(1 Question)

  • Q1. Final round with management in which discuss about your Goals, your expectation out of this job, location preference and final salary negotiation.

Interview Preparation Tips

Topics to prepare for SCON Projects Planning Engineer interview:
  • Advanced Excel
  • AutoCAD
  • Project Management
  • Project Planning
  • Project Coordination
  • MS Project
  • Rate Analysis
  • Reconciliation
  • Billing
  • Cost monitoring
Interview preparation tips for other job seekers - Show your hunger and enthusiasm towards your job/work and then negotiate for salary and other facilities
Be flexible about your job location preference, and slightly rigid in terms of salary expectation.

Be sure to explain your extra skills and your proficiency and feel free to express your interest in terms of which department you want to work (management is very supportive).

After joining focus on your skill development rather than salary and after you prove yourself then discuss about your salary with PM or directly with management.

Planning Engineer Interview Questions asked at other Companies

Q1. Prepare a small given example site schedule with sequencing and duration determine project duration in MSP/on Paper What is critical path method? How will you identify while making on paper rather than MSP? How would you track schedule-Proc... read more
View answer (1)
Interview experience
3
Average
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral and was interviewed before Jul 2022. There were 2 interview rounds.

Round 1 - HR 

(2 Questions)

  • Q1. Salary in previous company
  • Q2. Why u leave a company
Round 2 - Technical 

(2 Questions)

  • Q1. Construction related quality questions
  • Q2. Why curing done, how much carpentor can do work
  • Ans. 

    Curing is done to strengthen and protect the wood, a carpenter can work efficiently depending on their skills and experience.

    • Curing is done to remove moisture from the wood, preventing warping and cracking.

    • Carpenters with experience can work faster and more efficiently due to their knowledge of different techniques and tools.

    • The amount of work a carpenter can do also depends on the complexity of the project and the ava...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Give answer confidently

Senior Engineer Interview Questions asked at other Companies

Q1. what is the meaning of M in M20,M25,M30 grade of concrete?
View answer (56)

MEP Engineer Interview Questions & Answers

user image Anonymous

posted on 30 Aug 2021

I applied via Naukri.com and was interviewed in Jul 2021. There was 1 interview round.

Interview Questionnaire 

6 Questions

  • Q1.  Building SLD FROM HT PANEL TO METER ROOM
  • Ans. 

    The Single Line Diagram (SLD) shows the electrical connections from the HT panel to the meter room.

    • The SLD should include all the electrical components and their interconnections.

    • It should show the main HT panel, distribution boards, transformers, cables, and meters.

    • The SLD should indicate the ratings, sizes, and types of equipment used.

    • It should follow the electrical code and standards applicable to the project.

    • The SL...

  • Answered by AI
  • Q2. Transformer testing and commissioning
  • Q3. Difference between earthing and grounding
  • Ans. 

    Earthing and grounding are terms used interchangeably, but they have different meanings and applications.

    • Earthing refers to the process of connecting electrical systems to the ground to prevent electric shock and protect against lightning strikes.

    • Grounding, on the other hand, involves creating a low-resistance path between an electrical circuit and the earth to ensure proper functioning and safety.

    • Earthing is primarily...

  • Answered by AI
  • Q4. 1bhk flat Load calculation
  • Q5. 1bhk ,2bhk 3bhk flat SLD
  • Q6. Work method statement of slab conduiting, Plumbing pipe installation, Fire Fighting pipe installation.
  • Ans. 

    A work method statement outlines the procedures and steps involved in slab conduiting, plumbing pipe installation, and fire fighting pipe installation.

    • Slab conduiting involves the installation of conduits within the concrete slab to accommodate electrical and communication wiring.

    • Plumbing pipe installation includes the fitting and connection of pipes for water supply and drainage systems.

    • Fire fighting pipe installation...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Stay clam and be confident

MEP Engineer Interview Questions asked at other Companies

Q1. Work method statement of slab conduiting, Plumbing pipe installation, Fire Fighting pipe installation.
View answer (4)

SCON Projects interview questions for popular designations

 MEP Engineer

 (2)

 Planning Engineer

 (1)

 Senior Engineer

 (1)

 Site Engineer

 (1)

Site Engineer Interview Questions & Answers

user image Ganesh Ahirrao

posted on 26 Jul 2021

I applied via Walk-in and was interviewed before Jul 2020. There was 1 interview round.

Interview Questionnaire 

2 Questions

  • Q1. What is density of steel, cement?
  • Ans. 

    The density of steel and cement varies depending on the type and composition.

    • The density of steel ranges from 7,750 to 8,050 kg/m³.

    • The density of cement ranges from 1,100 to 1,500 kg/m³.

    • Different types of steel and cement may have slightly different densities.

    • Density is an important property to consider in construction and engineering calculations.

  • Answered by AI
  • Q2. Cutting length of beam ring
  • Ans. 

    Cutting length of beam ring is the length of steel required to form a complete ring around the beam.

    • The cutting length of beam ring is calculated by adding the circumference of the beam to twice the development length of the steel.

    • The development length of the steel is the length required for the steel to fully bond with the concrete.

    • The cutting length of beam ring is important for determining the amount of steel requi...

  • Answered by AI

Site Engineer Interview Questions asked at other Companies

Q1. 1.BBS calculation of slab? 2.Stairs case riser and tread dimension? 3.Types of cement? 4.Full form of tmt, pcc, rcc, tmx, dpc 5.Definition of plinth area, courtyard area, built-up area? 6.function of dpc 8.standard size of brick? 9. Write g... read more
View answer (3)

Interview questions from similar companies

Detailer,modeller, Checker Interview Questions & Answers

Cadeploy Engineering user image Anonymous

posted on 10 Feb 2025

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I was interviewed in Jan 2025.

Round 1 - HR 

(1 Question)

  • Q1. No questions from hr
Round 2 - Technical 

(2 Questions)

  • Q1. Tool test given
  • Q2. For our role related...input or task given
Round 3 - One-on-one 

(1 Question)

  • Q1. Technical questions asked

Interview Preparation Tips

Interview preparation tips for other job seekers - Prepare AISC standards and familiarize yourself with Tekla tools.
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
-
Result
Selected Selected
Round 1 - Aptitude Test 

Quantitative reasoning

Round 2 - One-on-one 

(5 Questions)

  • Q1. About yourself and past experiences.
  • Q2. Managerial round
  • Q3. About company information
  • Q4. About yourself and extracurricular activities
  • Q5. See yourself in the next 5 yrs

Interview Preparation Tips

Interview preparation tips for other job seekers - be prepared for questions.
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
Not Selected
Round 1 - Technical 

(2 Questions)

  • Q1. What is the output voltage of an AAAC Rabbit conductor?
  • Ans. 

    The output voltage of an AAAC Rabbit conductor is typically around 600 volts.

    • The output voltage of an AAAC Rabbit conductor is usually around 600 volts.

    • The exact output voltage may vary depending on the specific application and conditions.

    • It is important to consult the manufacturer's specifications for accurate information.

  • Answered by AI
  • Q2. What is your execution work plan?
  • Ans. 

    My execution work plan involves setting clear goals, creating a timeline, assigning tasks, monitoring progress, and adjusting as needed.

    • Set clear goals and objectives for the project

    • Create a detailed timeline with milestones and deadlines

    • Assign tasks to team members based on their strengths and expertise

    • Regularly monitor progress and make adjustments as needed

    • Communicate effectively with team members and stakeholders

    • Ut...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Normal interview the materials and workmanship
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Jul 2024. There was 1 interview round.

Round 1 - Technical 

(5 Questions)

  • Q1. What is bar bending schedule
  • Ans. 

    Bar bending schedule is a document that provides details of reinforcement steel bars used in construction projects.

    • It includes details such as bar mark, bar size, quantity, shape, and bending dimensions.

    • Helps in estimating the quantity of steel required for construction.

    • Ensures proper placement and bending of reinforcement bars as per design specifications.

    • Used by contractors, engineers, and construction workers for re...

  • Answered by AI
  • Q2. 28 days concrete strength
  • Ans. 

    28 days concrete strength is the standard measure of concrete's compressive strength after 28 days of curing.

    • 28 days concrete strength is the standard measure of concrete's compressive strength after 28 days of curing

    • It is important for assessing the quality of concrete and its ability to support structural loads

    • The strength of concrete typically continues to increase beyond 28 days, but 28 days is the standard testing

  • Answered by AI
  • Q3. Difference between mivan and conventional
  • Ans. 

    Mivan is a modern construction technique using aluminum formwork, while conventional construction involves traditional methods like brick and mortar.

    • Mivan is faster and more efficient than conventional construction methods.

    • Mivan requires skilled labor for installation of aluminum formwork.

    • Conventional construction is more labor-intensive and time-consuming.

    • Mivan provides better quality finishes compared to conventional...

  • Answered by AI
  • Q4. What is self leveling concrete
  • Ans. 

    Self leveling concrete is a type of concrete that has a high flow consistency and is used to create smooth and level surfaces.

    • Self leveling concrete is designed to flow easily and settle into place without the need for troweling or leveling.

    • It is commonly used to level uneven floors before installing flooring materials such as tile or carpet.

    • Self leveling concrete can be applied in thicknesses ranging from a featheredg...

  • Answered by AI
  • Q5. How many days will take 1st Aluform mockup Concreting
  • Ans. 

    The 1st Aluform mockup concreting typically takes 1-2 days to complete.

    • 1-2 days is the usual timeframe for 1st Aluform mockup concreting

    • Factors such as weather conditions, size of the mockup, and availability of resources can affect the duration

    • Proper planning and coordination can help expedite the process

  • Answered by AI

Interview Preparation Tips

Topics to prepare for Shimizu Senior Site Engineer interview:
  • Construction
  • Structural
  • Quality Control
  • Quality Assurance
  • Bar Bending Schedule
  • Project Execution
Interview preparation tips for other job seekers - Be active and action to learn every step and work hard and smart . Please ensure technical criticis and how it resolve it
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-

I applied via Company Website

Round 1 - Technical 

(9 Questions)

  • Q1. What is status of company
  • Ans. 

    The company is currently in a stable financial position with ongoing projects and a strong reputation in the industry.

    • Company has a strong financial position

    • Ongoing projects are in progress

    • Company has a good reputation in the industry

  • Answered by AI
  • Q2. What is job responsibilities
  • Q3. What is employee growth
  • Ans. 

    Employee growth refers to the development and advancement of an individual within their career.

    • Employee growth involves acquiring new skills and knowledge

    • It includes taking on more responsibilities and challenges

    • Career progression and promotions are indicators of employee growth

  • Answered by AI
  • Q4. What is action points at site level
  • Ans. 

    Action points at site level refer to specific tasks or activities that need to be completed on the construction site.

    • Action points are typically identified during site inspections or progress meetings.

    • They can include tasks such as resolving design issues, coordinating with subcontractors, or ensuring compliance with regulations.

    • Examples of action points could be revising drawings to address conflicts, obtaining necess...

  • Answered by AI
  • Q5. Talking with politely with client
  • Q6. Very day site round, observation point noted and review with team
  • Q7. Communication with our team, project achievements as per client requirement
  • Q8. Project target as per the P O terms
  • Q9. Internal discussion with project team and vendor

SCON Projects Interview FAQs

How many rounds are there in SCON Projects interview?
SCON Projects interview process usually has 3-4 rounds. The most common rounds in the SCON Projects interview process are Resume Shortlist, One-on-one Round and HR.
What are the top questions asked in SCON Projects interview?

Some of the top questions asked at the SCON Projects interview -

  1. Prepare a small given example site schedule with sequencing and duration determ...read more
  2. Work method statement of slab conduiting, Plumbing pipe installation, Fire Figh...read more
  3. Difference between earthing and groundi...read more

Tell us how to improve this page.

SCON Projects Interview Process

based on 8 interviews

Interview experience

4.8
  
Excellent
View more

Interview Questions from Similar Companies

TCS Interview Questions
3.7
 • 10.4k Interviews
Infosys Interview Questions
3.6
 • 7.6k Interviews
Wipro Interview Questions
3.7
 • 5.6k Interviews
Tech Mahindra Interview Questions
3.5
 • 3.8k Interviews
Adani Group Interview Questions
3.9
 • 182 Interviews
BHEL Interview Questions
4.1
 • 109 Interviews
View all

SCON Projects Reviews and Ratings

based on 133 reviews

4.5/5

Rating in categories

4.2

Skill development

3.9

Work-life balance

4.4

Salary

4.5

Job security

4.4

Company culture

4.2

Promotions

4.1

Work satisfaction

Explore 133 Reviews and Ratings
Planning Engineer
35 salaries
unlock blur

₹3 L/yr - ₹7.6 L/yr

Safety Officer
27 salaries
unlock blur

₹2 L/yr - ₹4.5 L/yr

Junior Engineer Civil
18 salaries
unlock blur

₹1.2 L/yr - ₹3.5 L/yr

Senior Engineer
18 salaries
unlock blur

₹4 L/yr - ₹7.4 L/yr

Junior Engineer
17 salaries
unlock blur

₹1.8 L/yr - ₹4.8 L/yr

Explore more salaries
Compare SCON Projects with

Larsen & Toubro Limited

4.0
Compare

TCS

3.7
Compare

Hindustan Construction Company

4.2
Compare

BHEL

4.1
Compare
Did you find this page helpful?
Yes No
write
Share an Interview