Filter interviews by
The project has a total area of 10,000 sq ft.
Total area of the project is 10,000 sq ft
Sq ft value is important for determining materials and resources needed
Sq ft value can also impact project timeline and budget
Seeking new challenges and opportunities for growth in my career.
Looking for a new challenge to expand my skills and knowledge
Seeking opportunities for career advancement and growth
Interested in working on different types of projects to broaden my experience
The sq ft cost of my previous project was $150 per square foot.
The sq ft cost can vary depending on the location, materials used, and complexity of the project.
Factors such as labor costs, permits, and site conditions can also impact the sq ft cost.
For example, a high-end residential project in a prime location may have a sq ft cost of $300, while a basic commercial project in a suburban area may have a sq ft cost of $
I applied via Company Website and was interviewed in Sep 2023. There were 3 interview rounds.
Column lap length is the length of overlap between two reinforcing bars in a column.
Column lap length is important for ensuring proper structural integrity in a column.
It is typically specified in construction drawings or codes.
The lap length is determined based on the diameter of the reinforcing bars and the structural requirements.
For example, a column may require a lap length of 40 times the diameter of the bar.
2D and 4D refer to dimensions in geometry and physics.
2D refers to two-dimensional space, like a flat surface with length and width.
4D refers to four-dimensional space, which includes the three dimensions of space (length, width, height) and the dimension of time.
Examples of 2D objects include a square or a circle, while examples of 4D concepts include spacetime in physics.
Average problems, time, train, ven daiharms, simple intrest
I applied via Walk-in and was interviewed in Apr 2024. There were 3 interview rounds.
Conduct the offline test
Density of common construction materials
Steel: 7850 kg/m^3
Cement: 1440 kg/m^3
Concrete: 2400 kg/m^3
Sand: 1600-1700 kg/m^3
Aggregates: 1500-1750 kg/m^3
Triangle concrete quantity can be found using the formula: 1/2 * base * height * thickness.
Calculate the area of the triangle using the formula: 1/2 * base * height.
Multiply the area by the thickness to get the concrete quantity.
For example, if the base of the triangle is 5 meters, height is 8 meters, and thickness is 0.2 meters, the concrete quantity would be: 1/2 * 5 * 8 * 0.2 = 4 cubic meters.
Circular column concrete quantity can be found using the formula: Volume = πr^2h
Calculate the area of the circular column using the formula A = πr^2
Measure the height of the column
Multiply the area by the height to get the volume of concrete needed
Consider any additional factors such as wastage or reinforcement bars
Slump test is a method to measure the consistency of concrete before it sets.
Slump test is used to determine the workability of fresh concrete.
It involves filling a cone-shaped mold with concrete, then lifting the mold to see how much the concrete slumps or settles.
The amount of slump indicates the consistency of the concrete - a higher slump means a more workable mix.
Slump test helps in ensuring that the concrete mix ...
Compressive strength of concrete is typically measured after 14 and 28 days to assess its strength development.
Compressive strength of concrete is usually measured in pounds per square inch (psi) or megapascals (MPa).
After 14 days, the average compressive strength of concrete is around 60-75% of its ultimate strength.
After 28 days, the concrete typically reaches about 90-95% of its ultimate strength.
The percentage of s...
Mix ratios of concrete refer to the proportions of cement, sand, and aggregate used in a concrete mix.
Mix ratios are typically expressed as a ratio of cement:sand:aggregate, such as 1:2:4.
The mix ratio will vary depending on the strength and durability requirements of the concrete.
Common mix ratios include 1:2:3 for low strength concrete and 1:1.5:3 for high strength concrete.
Water is also added to the mix to achieve t
I applied via Referral and was interviewed in May 2024. There was 1 interview round.
The quantity of steel required per sqm varies depending on the type of structure and design specifications.
The quantity of steel required per sqm is typically calculated based on the structural design drawings and specifications.
Factors such as the type of structure, load requirements, and design codes influence the amount of steel needed per sqm.
For example, in a reinforced concrete structure, the quantity of steel pe...
posted on 1 Oct 2023
I applied via Referral and was interviewed in Apr 2023. There were 3 interview rounds.
Dressing and personality
I applied via Campus Placement and was interviewed before Mar 2023. There was 1 interview round.
The structure work at the site involves the construction of a new building using steel beams and concrete columns.
Steel beams are being used for the framework of the building
Concrete columns are being installed to support the structure
The construction process includes pouring concrete, welding steel beams, and erecting walls
Managing site works involves overseeing construction activities, coordinating with contractors, ensuring safety regulations are followed, and meeting project deadlines.
Coordinate with contractors and subcontractors to ensure work is completed on time and within budget
Monitor progress of construction activities and address any issues that may arise
Ensure compliance with safety regulations and quality standards
Communicat...
I applied via Recruitment Consulltant and was interviewed in Dec 2023. There was 1 interview round.
The slab cycle of aluminium shuttering refers to the process of using aluminium formwork for casting slabs in construction projects.
Aluminium shuttering is lightweight and durable, making it ideal for repetitive use in slab construction.
The slab cycle involves setting up the aluminium formwork, pouring concrete, allowing it to cure, and then dismantling the formwork for reuse.
Aluminium shuttering can be easily assemble...
based on 3 interviews
Interview experience
based on 12 reviews
Rating in categories
Site Engineer
7
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Site Engineer
4
salaries
| ₹0 L/yr - ₹0 L/yr |
Assistant Manager
3
salaries
| ₹0 L/yr - ₹0 L/yr |
Assistant Engineer
3
salaries
| ₹0 L/yr - ₹0 L/yr |
Assistant Manager - MEP
3
salaries
| ₹0 L/yr - ₹0 L/yr |
Prestige Group
Godrej Properties
DLF
Sobha