posted on 20 Nov 2021
I applied via Naukri.com and was interviewed before Nov 2020. There were 3 interview rounds.
posted on 28 Jun 2024
Dtr & PSS structure of SLD refers to Distribution Transformer and Package Substation structure in Single Line Diagram.
Dtr stands for Distribution Transformer which is used to step down voltage for distribution purposes.
PSS stands for Package Substation which is a compact unit containing transformers, switchgear, and control equipment.
In a Single Line Diagram (SLD), Dtr and PSS are represented by symbols to show their l...
posted on 2 Mar 2024
posted on 2 Jun 2023
PTR stands for Project Technical Report.
PTR is a document that summarizes the technical aspects of a project.
It includes details such as project scope, objectives, methodology, results, and conclusions.
PTRs are often used to communicate project progress and findings to stakeholders.
LT pole election rule refers to the guidelines and regulations for selecting and installing low tension electrical poles.
LT pole election rule specifies the criteria for selecting the appropriate location for installing low tension electrical poles.
It includes factors such as distance from buildings, roadways, and other structures, as well as soil conditions and accessibility.
Compliance with LT pole election rule ensur...
Coil earthing is a method of grounding electrical systems to prevent electric shock and ensure safety.
Coil earthing involves burying a coil of wire in the ground to create a low-resistance path for electrical currents to flow safely.
The depth at which the coil should be buried depends on factors such as soil type, moisture content, and local regulations.
Proper installation of coil earthing is essential to protect equip...
posted on 11 Sep 2022
I was interviewed in Aug 2022.
Bituminous laying temperature is 130-150°C and rolling temperature is 80-100°C.
Bituminous laying requires higher temperature than rolling.
Temperature range ensures proper compaction and adhesion.
Temperature can vary based on the type of bitumen and aggregate used.
Proper temperature control is crucial for quality bituminous pavement.
Material suitability criteria for aggregate in construction projects.
Aggregate size should be 26.5 mm or less.
Water absorption should not exceed 2%.
Soundness test should show Naso4 not more than 12% and Mgso4 not more than 18%.
Angle of abrasion should be less than 35% with max FI & EI less than 35%.
Equivalent weight of sand should not be less than 50%.
Aggregate should not be alkaline reactive.
MDD & MCC should be as per
The design procedure for DLC mix includes using M15 grade concrete, minimum cement content of 150 kg/cum, and achieving a compressive strength of at least 10 MPA after 7 days of curing.
Use M15 grade concrete with aggregate and cement ratio of 12:1
Minimum cement content of 150 kg/cum, or 120 kg/cum if fly ash content is over 20%
Achieve a compressive strength of at least 10 MPA after 7 days of curing
DLC mix should be hom...
The question is about the suitability of aggregate size and water absorption for PQC with a total thickness of 300mm and tolerance of +/-6mm.
Aggregate size of 31.5mm is suitable for PQC with a total thickness of 300mm and tolerance of +/-6mm.
Water absorption to GSB DLC being the same for PQC is also suitable.
The suitability of the material is important for the successful completion of the project.
The design procedure for cement concrete includes minimum cement content, strength requirements, dowel bar and tie bar specifications, and surface preparation and curing techniques.
Minimum cement content of 360 kg/cum if fly ash is more than 20%, and 310 kg/cum otherwise
Flexural strength of cement concrete after 28-day curing should be 4.5 MPa, and compressive strength should be 40 MPa
Dowel bar size of 32mm dia and 300...
posted on 26 Jan 2022
posted on 24 Jun 2021
I applied via Referral and was interviewed in Dec 2020. There were 3 interview rounds.
Testing and commissioning of TVS system involves various activities to ensure its proper functioning.
Verification of wiring and connections
Functional testing of individual components
Integration testing of the entire system
Performance testing under different load conditions
Verification of safety features
Documentation of test results and commissioning procedures
posted on 20 Nov 2021
I applied via Naukri.com and was interviewed before Nov 2020. There were 3 interview rounds.
Interview experience
based on 19 reviews
Rating in categories
Senior Project Engineer
153
salaries
| ₹4.2 L/yr - ₹14.3 L/yr |
Project Engineer
137
salaries
| ₹3.6 L/yr - ₹9.8 L/yr |
Project Lead
57
salaries
| ₹7.5 L/yr - ₹16.4 L/yr |
Validation Engineer
37
salaries
| ₹2.6 L/yr - ₹6.3 L/yr |
Assistant Manager - Business Development
13
salaries
| ₹9.8 L/yr - ₹16.8 L/yr |
Bharat Electronics
HCLTech
TCS
Wipro