The quantity of concrete needed for one time concreting depends on the volume of the area to be concreted.
The quantity of concrete needed is calculated by multiplying the volume of the area to be concreted by the density of concrete.
For example, if the volume of the area is 100 cubic meters and the density of concrete is 2400 kg/m^3, then the quantity of concrete needed would be 240,000 kg or 240 metric tons.
Factors su...
The project cost varies depending on the scope, size, materials, labor, and other factors involved.
Project cost is determined by factors such as materials, labor, equipment, permits, and overhead expenses.
Cost estimates are typically prepared during the planning phase and may be adjusted as the project progresses.
Examples of project costs include construction materials, equipment rental, labor wages, permits, and consu
Different types of cement tests are conducted to ensure quality and strength of the cement.
Some common types of cement tests include compressive strength test, fineness test, soundness test, setting time test, and heat of hydration test.
Compressive strength test is conducted by applying a compressive load to a cement cube or cylinder until failure occurs.
Fineness test measures the particle size of the cement and is imp...
One type of concrete test is the slump test, which measures the consistency of fresh concrete.
Slump test measures the workability of concrete by determining the consistency of fresh concrete.
Another type of concrete test is the compressive strength test, which measures the ability of concrete to withstand loads.
Concrete permeability test measures the ability of concrete to resist penetration by water or other liquids.
C...
I applied via Walk-in and was interviewed in Oct 2024. There was 1 interview round.
OHT stands for Overhead Tank. It is a water storage tank placed at a height to provide water pressure for distribution.
OHT is typically placed on the roof of a building or on a tower to ensure gravity-fed water supply.
The water is pumped into the OHT from a water source like a borewell or municipal supply.
The height of the OHT determines the water pressure available for distribution.
Pipes are connected from the OHT to ...
FHTC stands for First Horizontal Tangent Point, a key element in highway design.
FHTC marks the beginning of a horizontal curve on a highway.
It is typically located at the point where the road transitions from a straight section to a curved section.
Proper placement of FHTC is crucial for ensuring safe and efficient traffic flow.
Design considerations at FHTC include curve radius, superelevation, and sight distance.
FHTC i...
I applied via Recruitment Consulltant and was interviewed before Oct 2022. There were 2 interview rounds.
Construction and maintenance of GIS buildings involves planning, design, construction, and ongoing upkeep of the facility.
GIS building construction requires detailed planning and design to ensure the facility meets the specific needs of the project.
Regular maintenance is essential to keep the GIS building in optimal condition and prevent costly repairs in the future.
Maintenance tasks may include HVAC system checks, roo...
I applied via Naukri.com and was interviewed before Dec 2022. There were 2 interview rounds.
I applied via Walk-in and was interviewed in May 2022. There were 2 interview rounds.
M20 grade of concrete has a compressive strength of 20 N/mm² after 28 days.
M20 grade of concrete is a mix of 1:1.5:3 cement, sand, and aggregate respectively.
It is commonly used for residential and commercial construction.
The compressive strength of M20 grade concrete after 28 days is 20 N/mm².
This strength can be achieved by proper curing and water-cement ratio.
I applied via Recruitment Consulltant and was interviewed before Dec 2021. There were 2 interview rounds.
I applied via Naukri.com and was interviewed in Oct 2021. There were 3 interview rounds.
I applied via Company Website and was interviewed in Feb 2021. There were 3 interview rounds.
I applied via Indeed and was interviewed before Aug 2020. There was 1 interview round.
Piling is a construction procedure used to strengthen the foundation of a building. It involves various methods and the time taken depends on several factors.
Piling is done using methods like driven piles, bored piles, and auger cast piles.
Driven piles involve hammering precast concrete or steel piles into the ground.
Bored piles are created by drilling a hole into the ground and filling it with concrete.
Auger cast pile...
HR Executive
5
salaries
| ₹2.4 L/yr - ₹3.4 L/yr |
Purchase Executive
4
salaries
| ₹2.2 L/yr - ₹3.6 L/yr |
Assistant Manager
3
salaries
| ₹6 L/yr - ₹7.2 L/yr |
Assistant Engineer - Civil
3
salaries
| ₹3 L/yr - ₹4.8 L/yr |
Reliance Communications
GAO Tek
Tata Teleservices
Henry Harvin Education