Ground mounted solar power execution involves site selection, design, installation, and maintenance.
Site selection involves assessing the land for factors such as sun exposure, soil type, and accessibility.
Design includes determining the number and placement of solar panels, as well as the type of mounting system to be used.
Installation involves preparing the site, installing the mounting system, and connecting the pan...
I applied via Referral and was interviewed before Sep 2021. There were 2 interview rounds.
Failure of material & IS standard
Failure of material refers to the inability of a material to perform its intended function
IS standard refers to Indian Standards which are set by the Bureau of Indian Standards (BIS)
The failure of a material can be due to various reasons such as improper design, manufacturing defects, or environmental factors
IS standards ensure that products meet certain quality and safety requirements
I...
Failure of welding procedure & PWHT
The failure of welding procedure can lead to defects in the weld joint
PWHT (Post Weld Heat Treatment) is done to relieve residual stresses and improve the properties of the weld joint
If PWHT is not done properly, it can lead to cracking or distortion of the weld joint
Proper documentation and inspection of welding procedure and PWHT is crucial for quality assurance
I applied via Walk-in and was interviewed before Apr 2020. There were 5 interview rounds.
I applied via Campus Placement and was interviewed before Jan 2020. There were 4 interview rounds.
I applied via Campus Placement and was interviewed before May 2020. There were 4 interview rounds.
I applied via Campus Placement and was interviewed before Feb 2020. There were 4 interview rounds.
I applied via Campus Placement and was interviewed before Jul 2020. There were 4 interview rounds.
The project involved designing and implementing a new network infrastructure for a large corporation.
Conducted a thorough analysis of the existing network infrastructure
Designed a new network architecture that met the company's needs
Implemented the new network infrastructure with minimal disruption to business operations
Tested and optimized the new network to ensure optimal performance
Provided ongoing support and maint
I applied via Walk-in and was interviewed before Feb 2020. There were 4 interview rounds.
I applied via Campus Placement and was interviewed before Feb 2020. There was 1 interview round.
I applied via Recruitment Consultant and was interviewed before Aug 2020. There was 1 interview round.
based on 2 interviews
Interview experience
based on 12 reviews
Rating in categories
Assistant Engineer Mechanical
5
salaries
| ₹3 L/yr - ₹4.8 L/yr |
Electrical Engineer
4
salaries
| ₹1.8 L/yr - ₹4 L/yr |
Junior Engineer Electrical
4
salaries
| ₹2.2 L/yr - ₹4 L/yr |
Senior General Manager
4
salaries
| ₹26 L/yr - ₹31.5 L/yr |
HSE Manager
4
salaries
| ₹8.8 L/yr - ₹10.8 L/yr |
TCS
Accenture
Wipro
Cognizant