Filter interviews by
posted on 8 Jul 2022
To gland cable and connect instrument cables, follow proper cable routing and termination techniques.
Select the appropriate cable gland size and type for the cable being installed
Ensure the cable is properly routed and secured to prevent damage or strain on the connections
Strip the cable insulation to the appropriate length and prepare the conductors for termination
Connect the conductors to the appropriate terminals on...
Yes, location drawing is a detailed plan or map that shows the exact location of electrical and instrumentation equipment.
Location drawing is used to identify the exact location of electrical and instrumentation equipment in a facility.
It helps in maintenance and troubleshooting of equipment.
Location drawing includes details such as equipment tag numbers, cable routing, and junction box locations.
It is important for sa...
Cable tray fabrication in existing gas plant involves careful planning and execution.
Determine the required cable tray size and material
Identify the location and route of the cable tray
Ensure proper support and grounding of the cable tray
Fabricate the cable tray according to industry standards and specifications
Install the cable tray and secure it in place
Test the cable tray for functionality and safety
The process of pulling electrical cables involves planning, preparation, and execution.
Plan the route and determine the cable length needed
Prepare the cable by attaching pulling grips and lubrication
Use a cable puller to pull the cable through conduit or trays
Terminate the cable at both ends and test for continuity
Document the installation for future reference
Safety at work refers to the measures taken to prevent accidents, injuries, and illnesses in the workplace.
Safety protocols and procedures should be established and followed by all employees.
Regular safety inspections and audits should be conducted to identify and address potential hazards.
Personal protective equipment (PPE) should be provided and used when necessary.
Training and education on safety practices should be...
Permit to work is a formal written system used to control high-risk activities.
It is a safety procedure used in industries such as oil and gas, construction, and manufacturing.
It involves obtaining permission from a supervisor or manager before starting a high-risk activity.
The permit outlines the specific steps and precautions that must be taken to ensure the safety of workers and the environment.
Examples of high-risk...
Question asked form mechanical field
Types of analysis for topside structure include static analysis, dynamic analysis, fatigue analysis, and finite element analysis.
Static analysis to determine stresses and deformations under static loads
Dynamic analysis to assess response to dynamic loads such as wind, waves, and earthquakes
Fatigue analysis to evaluate the structure's ability to withstand repeated loading over time
Finite element analysis to model comple
I applied via Campus Placement and was interviewed before Mar 2023. There were 3 interview rounds.
30 question and , more numerical questions
My favorite subject is art history. I enjoy learning about different art movements and the impact of art on society.
I love studying the Renaissance period and how it influenced art for centuries.
I find the connection between art and politics during the 20th century fascinating.
Learning about the symbolism in religious art is always intriguing to me.
Samsung Heavy Industries interview questions for popular designations
I applied via Campus Placement and was interviewed in Nov 2022. There were 5 interview rounds.
This having 50 questions in 50 minute's in physical mode.
I applied via Recruitment Consulltant
1. Ensure you are adequately prepared for the interview or job discussions. 2. Go early to allow for time for settling down before commencement of interview. 3. Endeavor to research about the organization, know their core businesses, and why you are being invited for the opportunity. 4.Know your employer's need for your services and demonstrate your understanding and how prepared you are to improve the current situation, 5. Discussion value addition to the existing project or management team. 6. Emphasize your core strength and how you'll deploy that to the service of your employer. 7. Do not rundown anyone, you former company, colleagues, supervisor and managers.
Top trending discussions
I applied via Naukri.com and was interviewed before Feb 2020. There were 3 interview rounds.
Structured Change Management process ensures smooth and controlled changes in application support functions.
Reduces the risk of errors and downtime during changes
Ensures proper documentation and communication of changes
Helps in prioritizing and scheduling changes
Enables tracking and reporting of changes
Facilitates stakeholder involvement and buy-in
Example: ITIL Change Management process
Example: Agile Change Management
Agile is my preferred way of accepting changes from the customer.
Agile allows for continuous feedback and collaboration with the customer
Waterfall can lead to delays and misunderstandings
Agile promotes flexibility and adaptability to changing requirements
Examples: Scrum, Kanban, Lean
Agile Manifesto subsets include customer collaboration, responding to change, and working software.
Customer collaboration over contract negotiation
Responding to change over following a plan
Working software over comprehensive documentation
I appeared for an interview in Dec 2016.
Experienced business analyst with a background in data analysis and process improvement.
Over 5 years of experience in analyzing business processes and identifying areas for improvement
Proficient in data analysis tools such as Excel, SQL, and Tableau
Strong communication skills, able to effectively communicate with stakeholders to gather requirements and present findings
Certified in Business Analysis Professional (CBAP)
P...
I left my last job to pursue new opportunities for growth and development.
Seeking new challenges and opportunities for career advancement
Desire for professional growth and development
Company restructuring or downsizing
Relocation to a new city or country
Toxic work environment or lack of job satisfaction
Yes, I am able to work in shifts as required for the role of a Business Analyst.
I am flexible and adaptable to different work schedules.
I have previous experience working in shifts in my previous roles.
I understand the importance of meeting project deadlines and am willing to work outside regular hours if needed.
I applied via Campus Placement and was interviewed in Dec 2016. There were 2 interview rounds.
I applied via Campus Placement and was interviewed in Dec 2016. There were 4 interview rounds.
based on 6 interviews
Interview experience
based on 62 reviews
Rating in categories
Deputy Manager
39
salaries
| ₹9 L/yr - ₹18.7 L/yr |
Manager
15
salaries
| ₹18 L/yr - ₹24.5 L/yr |
Senior Engineer
11
salaries
| ₹7.5 L/yr - ₹14.4 L/yr |
Graduate Engineer Trainee (Get)
10
salaries
| ₹6.7 L/yr - ₹6.7 L/yr |
Senior Piping Designer
8
salaries
| ₹7.1 L/yr - ₹18 L/yr |
ExxonMobil
Baker Hughes
Schlumberger
Shell