Filter interviews by
Types of analysis for topside structure include static analysis, dynamic analysis, fatigue analysis, and finite element analysis.
Static analysis to determine stresses and deformations under static loads
Dynamic analysis to assess response to dynamic loads such as wind, waves, and earthquakes
Fatigue analysis to evaluate the structure's ability to withstand repeated loading over time
Finite element analysis to model comple
Top trending discussions
I applied via Naukri.com and was interviewed in Oct 2020. There were 3 interview rounds.
I applied via Recruitment Consultant and was interviewed in Dec 2020. There were 6 interview rounds.
I applied via Recruitment Consulltant and was interviewed in Jan 2022. There were 3 interview rounds.
I applied via Recruitment Consulltant and was interviewed before Oct 2021. There were 3 interview rounds.
I applied via Campus Placement and was interviewed in Sep 2023. There were 3 interview rounds.
It was quite hard and lengthy
General topic and 6 people each panel
I applied via Company Website and was interviewed in May 2024. There were 2 interview rounds.
Behavioral questions and resume delve
Pmi - product management information
I applied via Company Website and was interviewed before Aug 2023. There was 1 interview round.
Well integrity and well barrier elements are crucial components in ensuring the safety and efficiency of oil and gas wells.
Well integrity refers to the ability of a well to contain fluids within the intended zones and prevent any leaks or failures.
Well barrier elements are physical or mechanical barriers that are put in place to prevent the escape of fluids from the wellbore.
Examples of well barrier elements include ca...
Upstream processes involve exploration, drilling, and production of oil and gas.
Exploration: Involves searching for potential oil and gas reserves using seismic surveys and other techniques.
Drilling: Once a potential reserve is identified, wells are drilled to extract the oil and gas.
Production: Oil and gas are extracted from the wells and processed for distribution.
Examples: Offshore drilling in the Gulf of Mexico, sh
No conflicts with supervisor or others.
I have not had any conflicts with my supervisor or colleagues.
I believe in open communication and resolving issues professionally.
I prioritize teamwork and collaboration to prevent conflicts from arising.
I applied via Recruitment Consulltant and was interviewed before Nov 2022. There were 2 interview rounds.
Spare maintenance philosophy focuses on maintaining spare parts to minimize downtime and ensure efficient operations.
Spare maintenance philosophy aims to have a sufficient inventory of spare parts to quickly replace any faulty components.
It involves regular inspections and maintenance of spare parts to ensure their functionality and readiness.
The philosophy emphasizes proactive planning and forecasting to anticipate th...
posted on 7 Feb 2023
based on 1 interview
Interview experience
based on 2 reviews
Rating in categories
Deputy Manager
39
salaries
| ₹9 L/yr - ₹18.7 L/yr |
Manager
15
salaries
| ₹18 L/yr - ₹24.5 L/yr |
Senior Engineer
11
salaries
| ₹7.5 L/yr - ₹14.4 L/yr |
Graduate Engineer Trainee (Get)
10
salaries
| ₹6.7 L/yr - ₹6.7 L/yr |
Senior Piping Designer
8
salaries
| ₹7.1 L/yr - ₹18 L/yr |
ExxonMobil
Baker Hughes
Schlumberger
Shell