Filter interviews by
Clear (1)
I applied via Walk-in and was interviewed in Oct 2023. There were 2 interview rounds.
I am an experienced Shift Incharge with strong leadership skills and a proven track record of successfully managing teams and ensuring smooth operations.
Experienced Shift Incharge
Strong leadership skills
Proven track record of managing teams
Ensuring smooth operations
Transformer safety alarms are warning systems that indicate potential issues or dangers in the operation of a transformer.
Overtemperature alarm: Indicates when the transformer temperature exceeds a safe limit.
Oil level alarm: Alerts when the transformer oil level is below the recommended level.
Pressure relief alarm: Activates when the pressure inside the transformer exceeds a certain threshold.
Gas detection alarm: Dete...
Top trending discussions
I applied via Naukri.com and was interviewed before Jun 2022. There were 3 interview rounds.
I applied via Naukri.com and was interviewed before Jul 2023. There was 1 interview round.
posted on 1 Oct 2023
I applied via Referral and was interviewed in Apr 2023. There were 3 interview rounds.
I applied via Walk-in and was interviewed in Jun 2021. There were 3 interview rounds.
I applied via Approached by Company and was interviewed in Oct 2023. There were 4 interview rounds.
I applied via Approached by Company and was interviewed in Jan 2023. There were 4 interview rounds.
Copy Monitor is a Revit tool that allows users to monitor and synchronize changes made to linked models.
Copy Monitor is used in Revit to ensure that changes made to linked models are reflected in the current model.
It allows users to monitor and synchronize changes made to linked models.
Copy Monitor can be used to track changes to elements such as walls, floors, and roofs.
It can also be used to monitor changes to parame...
Revit models can be linked using the 'Link Revit' tool in the 'Insert' tab.
Open the host model and go to the 'Insert' tab.
Click on 'Link Revit' and select the model to be linked.
Choose the appropriate settings for the link, such as positioning and visibility.
Repeat the process for any additional models to be linked.
Save the host model to ensure the links are maintained.
They gave an architectural model to create a structural model
I applied via Naukri.com and was interviewed in May 2021. There were 4 interview rounds.
I applied via Walk-in and was interviewed in Jan 2024. There was 1 interview round.
Types of paints and tiles commonly used in construction projects.
Types of paints: acrylic, latex, oil-based, enamel, spray paint
Types of tiles: ceramic, porcelain, glass, natural stone, mosaic
based on 1 interview
Interview experience
Site Engineer
58
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Engineer
45
salaries
| ₹0 L/yr - ₹0 L/yr |
Assistant Manager
40
salaries
| ₹0 L/yr - ₹0 L/yr |
Civil Site Engineer
40
salaries
| ₹0 L/yr - ₹0 L/yr |
Executive Accountant
40
salaries
| ₹0 L/yr - ₹0 L/yr |
Prestige Group
Brigade Group
Godrej Properties
DLF