Filter interviews by
What is depreciation
What is the sec 2(22)(e)
Ind AS 115 and leases are accounting standards related to revenue recognition and lease accounting respectively.
Ind AS 115 is a new revenue recognition standard that replaces the existing Ind AS 18 and Ind AS 11.
It provides a single, comprehensive framework for revenue recognition from contracts with customers.
Lease accounting standard, Ind AS 116, requires lessees to recognize all leases on their balance sheet, while ...
I applied via Referral and was interviewed before Apr 2021. There were 2 interview rounds.
posted on 2 Mar 2021
I applied via Naukri.com and was interviewed before Mar 2020. There were 6 interview rounds.
posted on 15 Jun 2024
Check point of plastering is a crucial step in ensuring a smooth and even finish on walls or ceilings.
Check for any uneven areas or bumps in the plaster surface
Ensure that the plaster is fully dried before proceeding to the next step
Use a straight edge or level to check for any dips or high spots in the plaster
Inspect the corners and edges for any rough or unfinished areas
Make sure to sand down any rough patches before
Check points of water proofing involves inspecting areas prone to water leakage and ensuring proper sealing and protection.
Inspecting roof for cracks or missing shingles
Checking windows and doors for gaps or faulty seals
Examining foundation for signs of water seepage
Testing waterproofing membranes in basements or bathrooms
posted on 4 Apr 2021
Handled residential projects worth $X and sold Y units.
Managed residential projects worth $X and sold Y units.
Successfully handled X number of residential projects with a total value of $Y.
Sold Y units in residential projects worth $X.
Managed and sold units in residential projects worth $X and Y respectively.
As a sales person, I can add value to Aparna Constructions by utilizing my diverse experience in sales and marketing.
I have experience in developing and implementing successful sales strategies.
I can leverage my network and relationships to generate leads and increase sales.
I have a track record of exceeding sales targets and delivering results.
I am skilled in customer relationship management and can ensure customer sa...
I applied via Naukri.com and was interviewed in Oct 2024. There were 2 interview rounds.
I applied via Recruitment Consulltant and was interviewed in Dec 2023. There was 1 interview round.
The slab cycle of aluminium shuttering refers to the process of using aluminium formwork for casting slabs in construction projects.
Aluminium shuttering is lightweight and durable, making it ideal for repetitive use in slab construction.
The slab cycle involves setting up the aluminium formwork, pouring concrete, allowing it to cure, and then dismantling the formwork for reuse.
Aluminium shuttering can be easily assemble...
I can join within two weeks of receiving a job offer.
I can start within two weeks of receiving a job offer
I need to give notice at my current job
I may need time to relocate if necessary
I applied via Job Portal and was interviewed in Apr 2022. There were 2 interview rounds.
based on 1 interview
Interview experience
based on 1 review
Rating in categories
Site Engineer
58
salaries
| ₹3.2 L/yr - ₹5.5 L/yr |
Senior Engineer
45
salaries
| ₹4.3 L/yr - ₹8.5 L/yr |
Civil Site Engineer
40
salaries
| ₹3.2 L/yr - ₹5.7 L/yr |
Executive Accountant
39
salaries
| ₹2.2 L/yr - ₹5.5 L/yr |
Assistant Manager
37
salaries
| ₹4.8 L/yr - ₹10.2 L/yr |
Sobha
Lodha Group
Cushman & Wakefield
Godrej Properties