Filter interviews by
I was interviewed in Dec 2022.
Top trending discussions
I applied via LinkedIn and was interviewed in Jul 2024. There were 4 interview rounds.
Previous work clarity is essential for successful collaboration and understanding of project requirements.
Clearly explain the projects you have worked on in the past, including your role and responsibilities
Provide examples of how you communicated with team members to ensure clarity in project goals
Discuss any challenges you faced in previous projects and how you overcame them
Bit manipulation, memory layout, interrupts, semaphore mutex, implement memcpy, sorting, algo to share resource equally
I applied via Campus Placement and was interviewed in Jul 2024. There were 3 interview rounds.
Full c concept MCQ with IQ and Computaional Thinking
Number system conversion in C involves converting numbers between different bases, such as decimal to binary or hexadecimal.
Use functions like itoa() to convert integers to strings in different bases
Use strtol() to convert strings to integers in different bases
Remember to specify the base when converting numbers
1 angle and 2 angle are terms used in engineering design to describe the orientation of a part or feature relative to a reference surface.
1 angle refers to a feature that is oriented parallel to the primary datum plane
2 angle refers to a feature that is oriented perpendicular to the primary datum plane
These terms are commonly used in geometric dimensioning and tolerancing (GD&T) to specify the orientation of features o...
Geometry and tolerance in design refer to the dimensions and allowable variations in a part or product.
Geometry refers to the shape and size of a part or product.
Tolerance is the allowable variation in dimensions to ensure proper fit and function.
Tolerances are specified using symbols like +, -, or a range of values.
For example, a hole may have a diameter of 10mm with a tolerance of +/- 0.1mm.
Tolerances can affect the
1 angle and 2 angle are terms used in engineering to describe the orientation of a part or feature in relation to a reference plane.
1 angle refers to the orientation of a part or feature with respect to one reference plane
2 angle refers to the orientation of a part or feature with respect to two reference planes
These terms are commonly used in engineering drawings to specify the orientation of features for manufacturin
I applied via Recruitment Consulltant and was interviewed in Jun 2024. There was 1 interview round.
BRD stands for Business Requirements Document and SRS stands for Software Requirements Specification.
BRD outlines the business objectives and requirements for a project.
SRS details the software requirements needed to meet the business objectives.
BRD is more high-level and focuses on business needs, while SRS is more detailed and technical.
BRD is typically created by business analysts, while SRS is created by software d...
A flow chart is a visual representation of a process or workflow, showing the steps and decisions involved.
Flow charts use different shapes to represent different actions or steps in a process.
Arrows indicate the flow of the process from one step to another.
Decision points are represented by diamonds, with different paths depending on the outcome.
Examples: process of ordering a product online, steps in a software devel
A wireframe is a visual representation of a website or app layout that shows the basic structure and functionality without design elements.
Wireframes are used to plan and communicate the layout and functionality of a digital product.
They are typically created using simple shapes and placeholders for content.
Wireframes help stakeholders visualize the structure and flow of a project before investing in design and develop...
I use a variety of tools such as Microsoft Excel, SQL, Tableau, Jira, and Visio to analyze data and create visualizations for stakeholders.
Microsoft Excel for data analysis and manipulation
SQL for querying databases
Tableau for creating visualizations
Jira for project management
Visio for creating process flow diagrams
Leadership skills, team spirit, communication skills, problem-solving skills, analytical skills, and decision-making skills.
I am a dedicated Quality Engineer with a strong background in ensuring product quality and compliance with industry standards.
Experienced in conducting quality control tests and inspections
Skilled in identifying and resolving quality issues
Proficient in using quality management tools and techniques
Strong attention to detail and analytical skills
Excellent communication and teamwork abilities
My strengths include attention to detail, problem-solving skills, and strong communication. My weaknesses include a tendency to overthink and difficulty saying no.
Strengths: attention to detail
Strengths: problem-solving skills
Strengths: strong communication
Weaknesses: tendency to overthink
Weaknesses: difficulty saying no
I faced difficulty at work while working on a project due to conflicting requirements from different stakeholders.
Received conflicting feedback from different stakeholders on project requirements
Struggled to prioritize and balance the needs of each stakeholder
Had to facilitate meetings and negotiations to reach a consensus
Implemented a compromise solution that satisfied all parties involved
posted on 6 Oct 2024
I applied via Approached by Company and was interviewed in Sep 2024. There were 2 interview rounds.
The test about the aptitude questions asked normally
Design of system and electrical grid network
posted on 3 Apr 2024
I applied via Company Website and was interviewed in Mar 2024. There was 1 interview round.
Current is the flow of electric charge, measured in Amperes, while voltage is the potential difference between two points, measured in Volts.
Current is the rate of flow of electric charge in a circuit
Voltage is the potential difference between two points in a circuit
Current is measured in Amperes (A) while voltage is measured in Volts (V)
Ohm's Law relates current, voltage, and resistance: V = IR
A capacitor is an electronic component that stores and releases electrical energy.
Capacitors consist of two conductive plates separated by an insulating material called a dielectric.
They are used in circuits to store energy, filter out noise, and control the flow of current.
Capacitors are rated by their capacitance, measured in farads (F).
Common types of capacitors include ceramic, electrolytic, and tantalum capacitors
A transformer is an electrical device that transfers electrical energy between two or more circuits through electromagnetic induction.
Consists of two or more coils of insulated wire wound around a core
Primary coil receives electrical energy and induces a magnetic field in the core
Secondary coil receives the magnetic field and converts it back to electrical energy
Used in power distribution, voltage regulation, and isola
CRO full form in Electronics Engineering is Cathode Ray Oscilloscope.
CRO stands for Cathode Ray Oscilloscope
It is a type of electronic test instrument used to observe varying signal voltages
It displays a graph of an electrical signal in real-time
posted on 23 Sep 2024
I applied via Approached by Company and was interviewed in Mar 2024. There were 5 interview rounds.
I have over 15 years of experience in supply chain management, with a focus on the solar EPC business vertical.
Started my career in logistics and procurement roles
Progressed to managing end-to-end supply chain operations
Implemented cost-saving initiatives and optimized inventory management
Led cross-functional teams to improve supply chain efficiency
Experience in vendor management and contract negotiations
Successfully implemented cost-saving initiatives and streamlined supply chain processes, faced challenges with vendor reliability and fluctuating market conditions.
Implemented cost-saving initiatives such as renegotiating contracts with suppliers and optimizing transportation routes
Streamlined supply chain processes by implementing new technology and improving communication between departments
Challenges with vendor rel...
Zero base cost analysis is a method of budgeting in which all expenses must be justified for each new period.
Zero base cost analysis starts from a 'zero base' and every function within an organization is analyzed for its needs and costs.
It requires managers to justify all expenses, not just increases over the previous year's budget.
This method helps in identifying inefficiencies and unnecessary expenses, leading to bet...
Funds planning for a quarter of Procurement plan involves forecasting expenses, analyzing cash flow, setting budget targets, and adjusting as needed.
Forecast procurement needs based on project timelines and requirements
Analyze historical spending patterns to estimate costs for the quarter
Consider market trends and potential price fluctuations for materials
Set budget targets for each category of procurement
Regularly mon...
To save on procurement cost for regular items, negotiate bulk discounts, explore alternative suppliers, streamline the procurement process, and implement cost-saving strategies.
Negotiate bulk discounts with suppliers for regular items
Explore alternative suppliers to compare prices and quality
Streamline the procurement process to reduce inefficiencies and costs
Implement cost-saving strategies such as just-in-time invent
Interview experience
based on 16 reviews
Rating in categories
Sales Executive
6
salaries
| ₹1.5 L/yr - ₹3 L/yr |
Manager
4
salaries
| ₹3 L/yr - ₹7 L/yr |
Assistant Manager
4
salaries
| ₹2 L/yr - ₹3.8 L/yr |
Operations Executive
4
salaries
| ₹1.9 L/yr - ₹2.4 L/yr |
Accountant
3
salaries
| ₹2.4 L/yr - ₹3 L/yr |
Europa Locks
Interface Microsystems
Nisa Industrial Services
Mitsubishi Heavy Industries