Shuttering work involves creating temporary structures to support concrete during construction.
Shuttering work is essential for creating formwork to hold concrete in place until it sets.
Types of shuttering work include timber formwork, steel formwork, and plastic formwork.
Properly designed shuttering work ensures the concrete retains its shape and strength.
Examples of shuttering work include building molds for columns,...
Work schedule planning involves creating a timeline for project tasks and allocating resources efficiently.
Identifying project milestones and deadlines
Allocating resources such as manpower and equipment
Creating a Gantt chart or project schedule
Adjusting the schedule as needed based on progress and unforeseen circumstances
Top trending discussions
I applied via Newspaper Ad and was interviewed before Aug 2021. There were 2 interview rounds.
I applied via Approached by Company and was interviewed in Apr 2022. There was 1 interview round.
I applied via Referral and was interviewed before Mar 2023. There was 1 interview round.
Mivan formwork is a construction technique that uses aluminum formwork system for casting concrete structures.
Mivan formwork involves setting up aluminum formwork panels, fixing reinforcement bars, pouring concrete, and removing the formwork after the concrete has set.
It is a fast and efficient construction method commonly used for high-rise buildings and large residential projects.
The system allows for smooth finishes...
I applied via LinkedIn and was interviewed in Feb 2022. There were 2 interview rounds.
I am a civil engineer with experience in designing and managing construction projects.
I have a Bachelor's degree in Civil Engineering from XYZ University.
I have worked on various projects including designing bridges, roads, and buildings.
I am skilled in using software such as AutoCAD and Revit for designing.
I have experience in managing construction projects and ensuring they are completed on time and within budget.
I a...
posted on 22 Nov 2023
I applied via Naukri.com and was interviewed before Nov 2022. There were 3 interview rounds.
posted on 11 May 2018
I applied via Naukri.com and was interviewed before May 2017. There was 1 interview round.
The density of soil in the embankment layer varies depending on the type of soil and compaction methods used.
The density of soil in the embankment layer is typically measured in terms of dry density or wet density.
Dry density refers to the mass of solid soil particles per unit volume of soil, while wet density includes the mass of water as well.
The density of soil in the embankment layer is influenced by factors such a...
posted on 17 Jul 2017
I appeared for an interview before Jul 2016.
I applied via Naukri.com and was interviewed in Oct 2021. There were 3 interview rounds.
posted on 12 Jul 2023
I applied via Walk-in
In these round we just screening the students for next round GD is the process in which we just see the attitude, discipline and how they expressed there idea towards the topic that we give to them.
I have more knowledge in structural engineering.
Specialization in structural analysis and design
Extensive experience in designing buildings, bridges, and other structures
Knowledge of various materials and construction techniques
Familiarity with relevant codes and standards
Ability to perform structural calculations and simulations
based on 1 interview
Interview experience
based on 2 reviews
Rating in categories
Civil Site Engineer
7
salaries
| ₹2.4 L/yr - ₹5.8 L/yr |
Civil Engineer
4
salaries
| ₹1.8 L/yr - ₹3.8 L/yr |
Safety Officer
4
salaries
| ₹3 L/yr - ₹3 L/yr |
Billing Engineer
4
salaries
| ₹4.2 L/yr - ₹7.8 L/yr |
Project Manager
3
salaries
| ₹4 L/yr - ₹7.2 L/yr |
Lea Associates South Asia
McNally Bharat Engineering
R.V.R. PROJECTS
ABCI Infrastructures