Upload Button Icon Add office photos

Filter interviews by

S&T Interiors and Contracting Assistant Project Manager Interview Questions and Answers

Updated 26 Sep 2017

1 interview found

Sort by: Popular

1 Interview Round

Interview Questions

  • Q1. Its almost same as other companies, Tell me about yourself? Why you want to leave present company ? whats your present CTC ? What are the roles & Responsibiliti...read more Add Answer

Interview questions from similar companies

Interview experience
4
 Good
Difficulty level
 Moderate
Duration
 Less than 2 weeks
Result
Selected  Selected

I applied via Walk-in and was interviewed before Jun 2023.

2 Interview Rounds

1

Assignment Round

Inter connection in Sikar Project

2

Case Study Round

JHUNJHANU SEWER PROJECT

Interview Preparation Tips

Interview preparation tips for other job seekers - BE FRINENDLY

I applied via Walk-in and was interviewed in Jul 2021.

5 Interview Rounds

Interview Questions

  • Q1. All civil work related questions asked me. Add Answer
  • Q2. All civil work, quality, safety specification , technical method. Add Answer
  • Q3. Planning ( msp), work scheduling.project target capture planned. Add Answer

Interview Preparation Tips

Interview preparation tips for other job seekers - My interview very fine.our confidential very true. Work period satisfaction .
Interview experience
5
 Excellent
Difficulty level
 -
Duration
 -
Result
 -

3 Interview Rounds

1

Resume Shortlist Round

Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
2

Technical Round (4 Questions)

  • Q1. Detail process of building survey
  • Q2. What is development length
  • Q3. What about you know waterproofing of toilet area
  • Q4. Circumstances of handing over flat to Clint
3

HR Round (4 Questions)

  • Q1. Pls give information about your profile
  • Q2. What is your strength
  • Q3. During job are you comfortable of transfer
  • Q4. Why are you leaving your current company

Interview Preparation Tips

Interview preparation tips for other job seekers - Interviewer asked deep details questions of structural, finishing & hondover of high rise building project.
Interview experience
5
 Excellent
Difficulty level
 Moderate
Duration
 2-4 weeks
Result
Selected  Selected

I applied via Approached by Company and was interviewed before May 2023.

2 Interview Rounds

1

Aptitude Test Round

General aptitude of IQ

2

Technical Round (5 Questions)

  • Q1. QA and QC related
  • Q2. What is the criteria of acceptance of a concrete compressive strength
  • Q3. What is project management
  • Q4. How to handle the contractor if he is not performing
  • Q5. What do you mean By EPCcontractor

Interview Preparation Tips

Interview preparation tips for other job seekers - It's good company to perform and show your ability
Interview experience
5
 Excellent
Difficulty level
 -
Duration
 -
Result
 -

2 Interview Rounds

1

Resume Shortlist Round

Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
2

One-on-one Round (2 Questions)

  • Q1. Introduce yourself? This This question is just make you comfortable to boost your confidence because you surely know the answer.?
  • Q2. Why do you want to change?

Interview Preparation Tips

Interview preparation tips for other job seekers - Prepare impressive CV, you can include some graphics or pics of your work from earlier employment such as pic with team .. which indirectly explain team size you handled, site pics containing yourself.. explains your site visits. Some KOMs showing formal approach... but ensure, you do not break the confidential requirements...!
Interview experience
4
 Good
Difficulty level
 Moderate
Duration
 Less than 2 weeks
Result
Selected  Selected

I applied via Walk-in and was interviewed before Jun 2023.

2 Interview Rounds

1

Assignment Round

Inter connection in Sikar Project

2

Case Study Round

JHUNJHANU SEWER PROJECT

Interview Preparation Tips

Interview preparation tips for other job seekers - BE FRINENDLY

I applied via Naukri.com and was interviewed in Nov 2022.

1 Interview Round

1

Technical Round (2 Questions)

  • Q1. Sewerage System - Design Standards
  • Q2. Load distribution method

Interview Preparation Tips

Interview preparation tips for other job seekers - Hydraulic Design of sewerage & drainage system.
Longitudinal section of Hydraulic line
Interview experience
5
 Excellent
Difficulty level
 -
Duration
 -
Result
 -

2 Interview Rounds

1

Resume Shortlist Round

Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all tips
2

Civil engineer Round (2 Questions)

  • Q1. Block work, plastering, putty, painting, gypsum, Tile,
  • Q2. Block work plastering putty , painting , gypsum, tile marble,

Interview Preparation Tips

Interview preparation tips for other job seekers - Every question I can speak

I applied via Referral and was interviewed in May 2022.

2 Interview Rounds

1

Resume Shortlist Round

Pro Tip by AmbitionBox:
Double-check your resume for any spelling mistakes. The recruiter may consider spelling mistakes as careless behavior or poor communication skills.
View all tips
2

Technical Round (2 Questions)

  • Q1. I had been interviewed for Project engineer role. The interview was conducted by Two portfolio managers. It was around 1 hour & they had asked related to projec...read more
  • Q2. What is the FEED? What is the flow of work in engineering? What is Hazop & Hazid? SIL? Any clashes u observed in engineering & actual execution? How 3D model is...read more

Interview Preparation Tips

Topics to prepare for Worley Deputy Project Manager interview:
  • Engineering
Interview preparation tips for other job seekers - Interview somehow is not so hard. Asked basic things related to engineering management. Salary negotiation is important. They offer low salaries.

Skills evaluated in this interview

Tell us how to improve this page.

Interview Questions from Similar Companies

Tata Technologies Interview Questions
3.7
 • 246 Interviews
Saint-Gobain Interview Questions
4.0
 • 167 Interviews
LivSpace Interview Questions
3.6
 • 135 Interviews
AECOM Interview Questions
4.3
 • 109 Interviews
Worley Interview Questions
4.2
 • 104 Interviews
HomeLane Interview Questions
3.5
 • 83 Interviews
View all

S&T Interiors and Contracting Assistant Project Manager Reviews and Ratings

based on 1 review

2.0/5

Rating in categories

2.0

Skill development

1.0

Work-Life balance

1.0

Salary & Benefits

1.0

Job Security

2.0

Company culture

1.0

Promotions/Appraisal

1.0

Work Satisfaction

Explore 1 Review and Rating
Quantity Surveyor
5 salaries
unlock blur

₹2.4 L/yr - ₹3.8 L/yr

Executive
4 salaries
unlock blur

₹4 L/yr - ₹8 L/yr

Senior Quantity Surveyor
4 salaries
unlock blur

₹4.7 L/yr - ₹13.6 L/yr

Assistant Construction Manager
4 salaries
unlock blur

₹8.1 L/yr - ₹8.1 L/yr

Interior Project Manager
4 salaries
unlock blur

₹12 L/yr - ₹14.4 L/yr

Explore more salaries
Compare S&T Interiors and Contracting with

DesignCafe

3.4
Compare

LivSpace

3.6
Compare

HomeLane

3.5
Compare

Pepperfry

3.3
Compare

Calculate your in-hand salary

Confused about how your in-hand salary is calculated? Enter your annual salary (CTC) and get your in-hand salary
Did you find this page helpful?
Yes No
write
Share an Interview