posted on 28 Jun 2024
I applied via Walk-in and was interviewed before Jun 2023. There were 2 interview rounds.
Inter connection in Sikar Project
JHUNJHANU SEWER PROJECT
I applied via Walk-in and was interviewed in Jul 2021. There were 5 interview rounds.
posted on 11 Dec 2023
The process of building survey involves several steps to assess the condition and suitability of a building.
Determine the purpose of the survey and the scope of work
Conduct a visual inspection of the building's exterior and interior
Identify any structural issues, such as cracks or signs of deterioration
Assess the building's systems, including electrical, plumbing, and HVAC
Evaluate the building's compliance with buildin...
Development length is the minimum length of reinforcement required to transfer the stress between the concrete and the reinforcement.
Development length is determined by factors such as the type of reinforcement, concrete strength, and bond strength.
It is necessary to ensure that the reinforcement bars are properly embedded in the concrete to provide structural integrity.
The development length can vary depending on the ...
Waterproofing of toilet area is essential to prevent water damage and maintain hygiene.
Waterproofing involves applying a waterproof membrane or coating to the walls, floors, and joints of the toilet area.
It helps to prevent water leakage, seepage, and dampness, which can lead to structural damage and mold growth.
Various materials like waterproofing membranes, sealants, and grouts are used for effective waterproofing.
Pr...
The circumstances of handing over the flat to Clint
The flat was handed over to Clint after completing all necessary paperwork
The condition of the flat was documented before handing it over to Clint
Keys and access cards were provided to Clint
Any outstanding payments or dues were settled before the handover
posted on 4 May 2024
I applied via Approached by Company and was interviewed before May 2023. There were 2 interview rounds.
General aptitude of IQ
Concrete compressive strength acceptance criteria is based on specified strength, testing frequency, and acceptance criteria.
Specified strength should be determined by the project requirements or standards.
Testing frequency should be established to ensure consistent quality control.
Acceptance criteria may include minimum strength requirements and statistical analysis.
Example: Specified strength of 28 MPa, testing every...
Project management is the practice of initiating, planning, executing, controlling, and closing the work of a team to achieve specific goals and meet specific success criteria.
Involves initiating, planning, executing, controlling, and closing a project
Focuses on achieving specific goals and meeting success criteria
Requires effective communication, coordination, and resource management
Utilizes tools and techniques such ...
Address the issue directly with the contractor and set clear expectations for improvement.
Schedule a meeting with the contractor to discuss performance concerns
Clearly communicate the areas where the contractor is not meeting expectations
Set specific goals and deadlines for improvement
Offer support or resources to help the contractor improve
Consider consequences if performance does not improve, such as termination of c
EPC stands for Engineering, Procurement, and Construction. An EPC contractor is a company that provides all services required for a project from design to completion.
EPC stands for Engineering, Procurement, and Construction
EPC contractors are responsible for designing, procuring materials, and constructing projects
They are often hired for large-scale projects such as power plants, refineries, and infrastructure project
posted on 14 Feb 2023
posted on 28 Jun 2024
I applied via Walk-in and was interviewed before Jun 2023. There were 2 interview rounds.
Inter connection in Sikar Project
JHUNJHANU SEWER PROJECT
I applied via Naukri.com and was interviewed in Nov 2022. There was 1 interview round.
Design standards for sewerage system
Design standards vary based on location and regulations
Consideration should be given to factors such as population density, topography, and soil type
Standards may include minimum pipe diameter, slope, and depth
Examples of design standards include ASCE 15 and EPA guidelines
posted on 24 Jul 2023
I applied via Referral and was interviewed in May 2022. There were 2 interview rounds.
FEED is Front End Engineering Design, the initial phase of engineering design. Hazop & Hazid are safety studies. 3D model is finalised after multiple reviews.
FEED is the initial phase of engineering design where the project scope is defined and preliminary designs are developed.
Hazop & Hazid are safety studies conducted during the design phase to identify and mitigate potential hazards.
SIL (Safety Integrity Level) is a...
based on 1 review
Rating in categories
Quantity Surveyor
5
salaries
| ₹2.4 L/yr - ₹3.8 L/yr |
Executive
4
salaries
| ₹4 L/yr - ₹8 L/yr |
Senior Quantity Surveyor
4
salaries
| ₹4.7 L/yr - ₹13.6 L/yr |
Assistant Construction Manager
4
salaries
| ₹8.1 L/yr - ₹8.1 L/yr |
Interior Project Manager
4
salaries
| ₹12 L/yr - ₹14.4 L/yr |
DesignCafe
LivSpace
HomeLane
Pepperfry