Upload Button Icon Add office photos

Filter interviews by

S&T Interiors and Contracting Assistant Project Manager Interview Questions and Answers

Updated 26 Sep 2017

S&T Interiors and Contracting Assistant Project Manager Interview Experiences

Interview questions from similar companies

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed before Jun 2023. There were 2 interview rounds.

Round 1 - Assignment 

Inter connection in Sikar Project

Round 2 - Case Study 

JHUNJHANU SEWER PROJECT

Interview Preparation Tips

Interview preparation tips for other job seekers - BE FRINENDLY

I applied via Walk-in and was interviewed in Jul 2021. There were 5 interview rounds.

Interview Questionnaire 

3 Questions

  • Q1. All civil work related questions asked me.
  • Q2. All civil work, quality, safety specification , technical method.
  • Q3. Planning ( msp), work scheduling.project target capture planned.

Interview Preparation Tips

Interview preparation tips for other job seekers - My interview very fine.our confidential very true. Work period satisfaction .
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(4 Questions)

  • Q1. Detail process of building survey
  • Ans. 

    The process of building survey involves several steps to assess the condition and suitability of a building.

    • Determine the purpose of the survey and the scope of work

    • Conduct a visual inspection of the building's exterior and interior

    • Identify any structural issues, such as cracks or signs of deterioration

    • Assess the building's systems, including electrical, plumbing, and HVAC

    • Evaluate the building's compliance with buildin...

  • Answered by AI
  • Q2. What is development length
  • Ans. 

    Development length is the minimum length of reinforcement required to transfer the stress between the concrete and the reinforcement.

    • Development length is determined by factors such as the type of reinforcement, concrete strength, and bond strength.

    • It is necessary to ensure that the reinforcement bars are properly embedded in the concrete to provide structural integrity.

    • The development length can vary depending on the ...

  • Answered by AI
  • Q3. What about you know waterproofing of toilet area
  • Ans. 

    Waterproofing of toilet area is essential to prevent water damage and maintain hygiene.

    • Waterproofing involves applying a waterproof membrane or coating to the walls, floors, and joints of the toilet area.

    • It helps to prevent water leakage, seepage, and dampness, which can lead to structural damage and mold growth.

    • Various materials like waterproofing membranes, sealants, and grouts are used for effective waterproofing.

    • Pr...

  • Answered by AI
  • Q4. Circumstances of handing over flat to Clint
  • Ans. 

    The circumstances of handing over the flat to Clint

    • The flat was handed over to Clint after completing all necessary paperwork

    • The condition of the flat was documented before handing it over to Clint

    • Keys and access cards were provided to Clint

    • Any outstanding payments or dues were settled before the handover

  • Answered by AI
Round 3 - HR 

(4 Questions)

  • Q1. Pls give information about your profile
  • Q2. What is your strength
  • Q3. During job are you comfortable of transfer
  • Q4. Why are you leaving your current company

Interview Preparation Tips

Interview preparation tips for other job seekers - Interviewer asked deep details questions of structural, finishing & hondover of high rise building project.
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed before May 2023. There were 2 interview rounds.

Round 1 - Aptitude Test 

General aptitude of IQ

Round 2 - Technical 

(5 Questions)

  • Q1. QA and QC related
  • Q2. What is the criteria of acceptance of a concrete compressive strength
  • Ans. 

    Concrete compressive strength acceptance criteria is based on specified strength, testing frequency, and acceptance criteria.

    • Specified strength should be determined by the project requirements or standards.

    • Testing frequency should be established to ensure consistent quality control.

    • Acceptance criteria may include minimum strength requirements and statistical analysis.

    • Example: Specified strength of 28 MPa, testing every...

  • Answered by AI
  • Q3. What is project management
  • Ans. 

    Project management is the practice of initiating, planning, executing, controlling, and closing the work of a team to achieve specific goals and meet specific success criteria.

    • Involves initiating, planning, executing, controlling, and closing a project

    • Focuses on achieving specific goals and meeting success criteria

    • Requires effective communication, coordination, and resource management

    • Utilizes tools and techniques such ...

  • Answered by AI
  • Q4. How to handle the contractor if he is not performing
  • Ans. 

    Address the issue directly with the contractor and set clear expectations for improvement.

    • Schedule a meeting with the contractor to discuss performance concerns

    • Clearly communicate the areas where the contractor is not meeting expectations

    • Set specific goals and deadlines for improvement

    • Offer support or resources to help the contractor improve

    • Consider consequences if performance does not improve, such as termination of c

  • Answered by AI
  • Q5. What do you mean By EPCcontractor
  • Ans. 

    EPC stands for Engineering, Procurement, and Construction. An EPC contractor is a company that provides all services required for a project from design to completion.

    • EPC stands for Engineering, Procurement, and Construction

    • EPC contractors are responsible for designing, procuring materials, and constructing projects

    • They are often hired for large-scale projects such as power plants, refineries, and infrastructure project

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - It's good company to perform and show your ability
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - One-on-one 

(2 Questions)

  • Q1. Introduce yourself? This This question is just make you comfortable to boost your confidence because you surely know the answer.?
  • Ans. Prepare your introduction and speak. Ensure that your speak naturally - touch upon your education, family, academic & experience. Keep some thread which will generate another related questions & if successful then gobwith flow
  • Answered Anonymously
  • Q2. Why do you want to change?
  • Ans. Multiple answers.. Stagnant, better remuneration, better position, change of location... and many.. see what suits you. Try to avoid talking against any current & previous employer
  • Answered Anonymously

Interview Preparation Tips

Interview preparation tips for other job seekers - Prepare impressive CV, you can include some graphics or pics of your work from earlier employment such as pic with team .. which indirectly explain team size you handled, site pics containing yourself.. explains your site visits. Some KOMs showing formal approach... but ensure, you do not break the confidential requirements...!
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed before Jun 2023. There were 2 interview rounds.

Round 1 - Assignment 

Inter connection in Sikar Project

Round 2 - Case Study 

JHUNJHANU SEWER PROJECT

Interview Preparation Tips

Interview preparation tips for other job seekers - BE FRINENDLY

I applied via Naukri.com and was interviewed in Nov 2022. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. Sewerage System - Design Standards
  • Ans. 

    Design standards for sewerage system

    • Design standards vary based on location and regulations

    • Consideration should be given to factors such as population density, topography, and soil type

    • Standards may include minimum pipe diameter, slope, and depth

    • Examples of design standards include ASCE 15 and EPA guidelines

  • Answered by AI
  • Q2. Load distribution method

Interview Preparation Tips

Interview preparation tips for other job seekers - Hydraulic Design of sewerage & drainage system.
Longitudinal section of Hydraulic line
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all tips
Round 2 - Civil engineer 

(2 Questions)

  • Q1. Block work, plastering, putty, painting, gypsum, Tile,
  • Q2. Block work plastering putty , painting , gypsum, tile marble,

Interview Preparation Tips

Interview preparation tips for other job seekers - Every question I can speak

I applied via Referral and was interviewed in May 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Double-check your resume for any spelling mistakes. The recruiter may consider spelling mistakes as careless behavior or poor communication skills.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. I had been interviewed for Project engineer role. The interview was conducted by Two portfolio managers. It was around 1 hour & they had asked related to project management & engineering services.
  • Q2. What is the FEED? What is the flow of work in engineering? What is Hazop & Hazid? SIL? Any clashes u observed in engineering & actual execution? How 3D model is finalised? Various standards for oil & gas ?
  • Ans. 

    FEED is Front End Engineering Design, the initial phase of engineering design. Hazop & Hazid are safety studies. 3D model is finalised after multiple reviews.

    • FEED is the initial phase of engineering design where the project scope is defined and preliminary designs are developed.

    • Hazop & Hazid are safety studies conducted during the design phase to identify and mitigate potential hazards.

    • SIL (Safety Integrity Level) is a...

  • Answered by AI

Interview Preparation Tips

Topics to prepare for Worley Deputy Project Manager interview:
  • Engineering
Interview preparation tips for other job seekers - Interview somehow is not so hard. Asked basic things related to engineering management. Salary negotiation is important. They offer low salaries.

Skills evaluated in this interview

Tell us how to improve this page.

Interview Questions from Similar Companies

Tata Technologies Interview Questions
3.6
 • 252 Interviews
Saint-Gobain Interview Questions
4.0
 • 170 Interviews
LivSpace Interview Questions
3.6
 • 137 Interviews
AECOM Interview Questions
4.3
 • 111 Interviews
Worley Interview Questions
4.1
 • 108 Interviews
HomeLane Interview Questions
3.5
 • 86 Interviews
View all

S&T Interiors and Contracting Assistant Project Manager Reviews and Ratings

based on 1 review

2.0/5

Rating in categories

2.0

Skill development

1.0

Work-life balance

1.0

Salary

1.0

Job security

2.0

Company culture

1.0

Promotions

1.0

Work satisfaction

Explore 1 Review and Rating
Quantity Surveyor
5 salaries
unlock blur

₹2.4 L/yr - ₹3.8 L/yr

Executive
4 salaries
unlock blur

₹4 L/yr - ₹8 L/yr

Senior Quantity Surveyor
4 salaries
unlock blur

₹4.7 L/yr - ₹13.6 L/yr

Assistant Construction Manager
4 salaries
unlock blur

₹8.1 L/yr - ₹8.1 L/yr

Interior Project Manager
4 salaries
unlock blur

₹12 L/yr - ₹14.4 L/yr

Explore more salaries
Compare S&T Interiors and Contracting with

DesignCafe

3.4
Compare

LivSpace

3.6
Compare

HomeLane

3.5
Compare

Pepperfry

3.2
Compare
Did you find this page helpful?
Yes No
write
Share an Interview