Premium Employer

i

This company page is being actively managed by Rohan Builders Team. If you also belong to the team, you can get access from here

Rohan Builders Verified Tick Work with us arrow

Compare button icon Compare button icon Compare

Filter interviews by

Rohan Builders Billing Engineer Interview Questions and Answers

Be the first one to contribute and help others!

Interview questions from similar companies

Interview Questionnaire 

1 Question

  • Q1. Past work experience and some technical work related questions
Interview experience
3
Average
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(1 Question)

  • Q1. Introduction, previous experience
Round 3 - Technical 

(1 Question)

  • Q1. Past experience and rates

Interview Preparation Tips

Interview preparation tips for other job seekers - Pressure will be more, since i worked in engineering team compare to others contracts department will be feeling the pressure more
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in Mar 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. LT Side Equipments
Round 3 - HR 

(1 Question)

  • Q1. Introduction & Salary
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed before Aug 2023. There was 1 interview round.

Round 1 - One-on-one 

(6 Questions)

  • Q1. Use of shunt relay in acb.
  • Ans. 

    A shunt relay in an ACB is used to provide protection against overcurrents by diverting excess current away from the main circuit.

    • Shunt relay is connected in parallel with the main circuit of the ACB.

    • It detects overcurrents and activates to divert the excess current through a shunt path.

    • This helps in protecting the main circuit from damage due to overcurrents.

    • Shunt relays are commonly used in Air Circuit Breakers (ACBs...

  • Answered by AI
  • Q2. What is coc in hvac.
  • Ans. 

    CoC in HVAC stands for Certificate of Conformance, which is a document certifying that a product meets specified requirements.

    • CoC in HVAC is a Certificate of Conformance that ensures a product meets specific requirements.

    • It is often required in HVAC projects to ensure quality and compliance.

    • CoC may include details such as product specifications, testing results, and manufacturer information.

  • Answered by AI
  • Q3. What is Biological oxygen demand and Carbonic oxygen demand in STP Plant.
  • Ans. 

    Biological oxygen demand (BOD) and Chemical oxygen demand (COD) are important parameters in wastewater treatment plants.

    • Biological oxygen demand (BOD) is a measure of the amount of dissolved oxygen needed by aerobic biological organisms to break down organic material in water.

    • Carbonaceous oxygen demand (COD) is a measure of the amount of oxygen required to oxidize all the organic and inorganic matter in water.

    • BOD is a ...

  • Answered by AI
  • Q4. What is voltage monitoring relay.
  • Ans. 

    A voltage monitoring relay is a device that monitors voltage levels and triggers an alarm or protective action if the voltage exceeds or falls below a set threshold.

    • Monitors voltage levels in electrical systems

    • Triggers alarm or protective action if voltage exceeds or falls below set threshold

    • Used to protect equipment from damage due to voltage fluctuations

  • Answered by AI
  • Q5. Working principle of wtp plant.
  • Ans. 

    WTP plant works on the principle of physical and chemical processes to remove impurities from water.

    • Water enters the plant and goes through processes like coagulation, flocculation, sedimentation, filtration, and disinfection.

    • Coagulation involves adding chemicals to water to make impurities clump together.

    • Flocculation helps in forming larger particles called floc for easier removal.

    • Sedimentation allows the floc to sett...

  • Answered by AI
  • Q6. What is your daily and monthly Reports.
  • Ans. 

    I provide daily and monthly reports on project progress, issues, and key metrics to track performance.

    • Daily reports include updates on tasks completed, challenges faced, and plans for the next day.

    • Monthly reports summarize overall progress, budget status, and any potential risks or delays.

    • Reports may also include key performance indicators (KPIs) such as project milestones achieved, budget variance, and resource utiliz...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - keep mind relax interview time. And focus your daily work activities .

Senior Engineer Interview Questions & Answers

DLF user image MRITUNJAY KUMAR

posted on 15 Mar 2024

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Campus Placement and was interviewed before Mar 2023. There was 1 interview round.

Round 1 - Technical 

(5 Questions)

  • Q1. Structure work going on at site
  • Ans. 

    The structure work at the site involves the construction of a new building using steel beams and concrete columns.

    • Steel beams are being used for the framework of the building

    • Concrete columns are being installed to support the structure

    • The construction process includes pouring concrete, welding steel beams, and erecting walls

  • Answered by AI
  • Q2. Survey related questions
  • Q3. Planning related
  • Q4. About Relocation nearby site
  • Q5. Manage site works
  • Ans. 

    Managing site works involves overseeing construction activities, coordinating with contractors, ensuring safety regulations are followed, and meeting project deadlines.

    • Coordinate with contractors and subcontractors to ensure work is completed on time and within budget

    • Monitor progress of construction activities and address any issues that may arise

    • Ensure compliance with safety regulations and quality standards

    • Communicat...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Be ready with your portfolio,and manage
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Aptitude Test 

Dressing and personality

Round 2 - Technical 

(1 Question)

  • Q1. Site questions and finishing work
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
  • Q1. Waterproofing layer
  • Q2. Plaster quantity
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I appeared for an interview before Mar 2024, where I was asked the following questions.

  • Q1. Previous experience
  • Ans. 

    I have over 10 years of experience in software engineering, focusing on system architecture and team leadership.

    • Led a team of 5 engineers in developing a scalable microservices architecture for a financial application, improving performance by 30%.

    • Implemented CI/CD pipelines that reduced deployment time from hours to minutes, enhancing team productivity.

    • Worked on a cross-functional team to integrate machine learning al...

  • Answered by AI
  • Q2. About previous project
  • Ans. 

    Led a team to develop a scalable web application for real-time data processing, enhancing user experience and performance.

    • Implemented microservices architecture, improving system scalability and maintainability.

    • Utilized AWS for cloud deployment, reducing infrastructure costs by 30%.

    • Integrated real-time data processing using Apache Kafka, enabling instant data updates.

    • Collaborated with cross-functional teams to gather r...

  • Answered by AI
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(1 Question)

  • Q1. Estimation and budget related
Round 2 - Technical 

(1 Question)

  • Q1. Basic process follows while billing and budgeting
Round 3 - HR 

(1 Question)

  • Q1. Salary negotiations
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
  • Q1. Reconciliation format with example of construction materials
  • Q2. Types of foundation

Rohan Builders Interview FAQs

How to prepare for Rohan Builders Billing Engineer interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at Rohan Builders. The most common topics and skills that interviewers at Rohan Builders expect are Billing Engineering, Client Billing, Quantity Surveying, Billing and AutoCAD.

Tell us how to improve this page.

Join Rohan Builders Great Living Engineered

Interview Questions from Similar Companies

Sobha Interview Questions
3.8
 • 148 Interviews
Kalpataru Limited Interview Questions
4.1
 • 143 Interviews
Lodha Group Interview Questions
4.0
 • 140 Interviews
Godrej Properties Interview Questions
3.6
 • 106 Interviews
DLF Interview Questions
3.9
 • 86 Interviews
Colliers India Interview Questions
3.9
 • 76 Interviews
Casagrand Interview Questions
3.8
 • 61 Interviews
View all
Rohan Builders Billing Engineer Salary
based on 22 salaries
₹2 L/yr - ₹7.5 L/yr
21% less than the average Billing Engineer Salary in India
View more details

Rohan Builders Billing Engineer Reviews and Ratings

based on 5 reviews

3.7/5

Rating in categories

2.5

Skill development

2.5

Work-life balance

3.4

Salary

2.9

Job security

3.2

Company culture

3.0

Promotions

2.5

Work satisfaction

Explore 5 Reviews and Ratings
Billing Engineer

Ankleshwar

4-9 Yrs

Not Disclosed

Explore more jobs
Senior Engineer
94 salaries
unlock blur

₹3.5 L/yr - ₹9.5 L/yr

Safety Officer
78 salaries
unlock blur

₹2.4 L/yr - ₹6.1 L/yr

Assistant Engineer
54 salaries
unlock blur

₹3.5 L/yr - ₹6.5 L/yr

Junior Engineer
45 salaries
unlock blur

₹2.4 L/yr - ₹4.3 L/yr

Senior Civil Engineer
43 salaries
unlock blur

₹4.5 L/yr - ₹10.1 L/yr

Explore more salaries
Compare Rohan Builders with

Sobha

3.8
Compare

Lodha Group

4.0
Compare

Cushman & Wakefield

4.1
Compare

Godrej Properties

3.6
Compare
write
Share an Interview