Filter interviews by
Be the first one to contribute and help others!
I applied via Indeed and was interviewed in Nov 2024. There was 1 interview round.
It is important for a Public Limited company to provide facilities to employees regardless of the literacy level of the Departmental HOD.
It is essential for a Public Limited company to adhere to labor laws and regulations regarding employee rights and facilities.
Providing facilities to employees, such as proper working conditions, safety measures, and benefits, is crucial for employee satisfaction and productivity.
Igno...
posted on 21 Jul 2024
GD&T stands for Geometric Dimensioning and Tolerancing, a system for defining and communicating engineering tolerances.
GD&T is a symbolic language used on engineering drawings to specify the allowable variations in form, size, and orientation of features.
It helps ensure that parts fit together properly and function as intended.
GD&T uses symbols such as concentricity, flatness, perpendicularity, and position to communic...
Surface finish symbol indicates the type of surface treatment required on a part for manufacturing purposes.
Surface finish symbols are typically found on engineering drawings to specify the type of finish needed on a part.
The symbol consists of a horizontal line with various geometric shapes and numbers that indicate the required finish.
Examples of surface finish symbols include Ra for roughness average, Rz for maximum...
posted on 28 Jul 2024
posted on 12 May 2024
I applied via Job Fair and was interviewed in Apr 2024. There were 2 interview rounds.
Production productivity type refers to the method or approach used to measure and improve productivity in a manufacturing setting.
Different types include labor productivity, machine productivity, and overall equipment effectiveness (OEE).
Labor productivity measures the output per worker or per labor hour.
Machine productivity measures the output per machine or equipment.
OEE measures the overall efficiency of a productio...
Production productivity type refers to the method used to measure and improve efficiency in manufacturing processes.
Different types include OEE (Overall Equipment Effectiveness), Takt time, and Cycle time
OEE measures the percentage of planned production time that is truly productive
Takt time is the rate at which a product must be produced to meet customer demand
Cycle time is the total time it takes to complete a proces
I have over 10 years of experience working in various companies, ranging from startups to multinational corporations.
Started my career at a small startup where I learned the importance of agility and adaptability
Moved on to a mid-sized company where I honed my leadership skills and managed cross-functional teams
Currently working at a multinational corporation where I have gained experience in global operations and stra
I applied via LinkedIn and was interviewed in Apr 2024. There was 1 interview round.
I applied via Indeed and was interviewed in Apr 2024. There were 2 interview rounds.
Very easy questions. Consist of quants and reasoning and one analytical question (not mandatory to answer seriously)
I am a detail-oriented professional with experience in managing catalogues and ensuring accuracy in product listings.
I have a strong attention to detail and organizational skills
I am proficient in data management and analysis
I have experience in creating and updating product catalogues
I prioritize accuracy and consistency in product listings