Filter interviews by
I applied via Walk-in and was interviewed in Apr 2022. There were 3 interview rounds.
M20 grade concrete proportion is 1:1.5:3 (cement:sand:aggregate) with a compressive strength of 20 MPa.
M20 grade concrete is commonly used for residential and commercial construction.
The proportion of cement, sand, and aggregate is 1:1.5:3 by volume.
The compressive strength of M20 grade concrete is 20 MPa.
The water-cement ratio for M20 grade concrete is typically 0.5.
M40 concrete has a compressive strength of 40 megapascals (MPa).
M40 concrete is a high-strength concrete mix commonly used in construction.
It has a compressive strength of 40 MPa, which means it can withstand heavy loads and pressure.
M40 concrete is typically used in the construction of bridges, high-rise buildings, and other structures that require high strength and durability.
The unit weight of a 20mm dia rod varies depending on the material it is made of.
The unit weight of a 20mm dia rod made of steel is approximately 2.47 kg/m
The unit weight of a 20mm dia rod made of brass is approximately 3.68 kg/m
The unit weight of a 20mm dia rod made of aluminum is approximately 1.57 kg/m
posted on 28 Oct 2024
I applied via Approached by Company and was interviewed in Apr 2024. There were 2 interview rounds.
I applied via Walk-in
Site work involves preparing the construction site for building, including clearing, grading, and excavation.
Clearing the site of any existing structures or debris
Grading the land to ensure proper drainage and foundation stability
Excavating for foundations, utilities, and other underground structures
Installing erosion control measures to prevent soil erosion
Preparing access roads and parking areas for construction vehi...
I applied via Naukri.com and was interviewed in Feb 2022. There were 2 interview rounds.
RNS INFRASTRUCTURE interview questions for popular designations
I applied via Walk-in and was interviewed in Aug 2021. There were 2 interview rounds.
Top trending discussions
System implementation process involves planning, designing, testing, and deploying new software or hardware systems.
Planning phase involves defining project scope, setting goals, and creating a timeline.
Design phase includes creating system architecture, database design, and user interface.
Testing phase involves conducting various tests to ensure system functionality and performance.
Deployment phase includes installing...
Monitoring performance involves setting clear expectations, providing feedback, tracking progress, and addressing any issues that arise.
Set clear performance expectations for team members
Provide regular feedback on performance
Track progress towards goals and objectives
Address any performance issues promptly and constructively
posted on 21 Mar 2023
I applied via Referral and was interviewed in Feb 2023. There were 2 interview rounds.
I was interviewed in Jan 2025.
I worked at a software development company specializing in cloud solutions.
Developed and maintained cloud-based applications
Collaborated with cross-functional teams to troubleshoot and resolve technical issues
Participated in regular code reviews and testing processes
I have 5 years of experience in IT, specializing in network infrastructure and system administration.
5 years of experience in IT
Specializing in network infrastructure and system administration
Certifications in Cisco CCNA and Microsoft MCSA
I am looking for a job in IRB because of the company's reputation for innovation and growth opportunities.
Interested in working for a company known for innovation
Seeking growth opportunities within the organization
Impressed by IRB's reputation in the industry
I am looking for a competitive salary that reflects my skills and experience in the industry.
Research the average salary range for System Engineers in the industry and location
Consider your level of experience, certifications, and skills when determining your salary expectations
Be prepared to negotiate based on the benefits package offered by the company
Provide a salary range rather than a specific number to allow for
I applied via Walk-in and was interviewed before Dec 2020. There were 5 interview rounds.
The neutral axis is the line where the stress is zero in a reinforced concrete structure.
The neutral axis divides the cross-section of the structure into two parts: the compression zone and the tension zone.
The depth of the neutral axis depends on the moment of resistance of the section and the bending moment applied.
The position of the neutral axis affects the amount of reinforcement required in the tension zone.
The n...
based on 2 interviews
Interview experience
based on 58 reviews
Rating in categories
Civil Site Engineer
23
salaries
| ₹0 L/yr - ₹0 L/yr |
Civil Engineer
17
salaries
| ₹0 L/yr - ₹0 L/yr |
Site Engineer
17
salaries
| ₹0 L/yr - ₹0 L/yr |
Quaity Control Engineer
8
salaries
| ₹0 L/yr - ₹0 L/yr |
QS Engineer
8
salaries
| ₹0 L/yr - ₹0 L/yr |
Larsen & Toubro Limited
Tata Projects
GMR Group
Reliance Infrastructure