Filter interviews by
I applied via Naukri.com and was interviewed before Jan 2024. There were 2 interview rounds.
Top trending discussions
posted on 12 Aug 2024
I applied via Company Website and was interviewed in Jul 2024. There was 1 interview round.
Maintaining machinery spares involves proper storage, inventory management, regular inspections, and timely replacements.
Create a detailed inventory of all machinery spares including part numbers, quantities, and locations.
Store spares in a designated area that is clean, organized, and easily accessible.
Implement a system for regular inspections to check for wear and tear, damage, or expiration dates.
Establish a schedu...
Motivate the technical team by setting clear goals, providing recognition, offering training opportunities, and fostering a positive work environment.
Set clear goals and expectations for the team to work towards.
Provide recognition for their hard work and achievements.
Offer training opportunities to help them develop their skills and advance in their careers.
Foster a positive work environment by promoting teamwork, com...
Maintaining discipline requires clear expectations, consistent enforcement, positive reinforcement, and effective communication.
Set clear expectations for behavior and performance.
Consistently enforce rules and policies.
Provide positive reinforcement for good behavior.
Communicate effectively with team members about expectations and consequences.
Lead by example and demonstrate the behavior you expect from others.
posted on 10 Apr 2024
I applied via Job Fair and was interviewed in Mar 2024. There was 1 interview round.
posted on 1 Aug 2023
Communication skills
I was interviewed in Sep 2023.
I applied via campus placement at GH Patel College of Engineering and Technology, Vallabh Vidyanagar and was interviewed before Jun 2021. There were 3 interview rounds.
The questions were basics to your domain not so hard not so easy.
I applied via Naukri.com and was interviewed in Apr 2023. There were 2 interview rounds.
Yes, PLC can be repaired by troubleshooting, replacing faulty components, and reprogramming if necessary.
PLC can be repaired by troubleshooting to identify the root cause of the issue.
Faulty components can be replaced to restore the functionality of the PLC.
Reprogramming may be necessary if the issue is related to the software or logic of the PLC.
Regular maintenance and timely repairs can help prevent major breakdowns
DG maintenance process involves regular inspections, testing, and servicing of diesel generators to ensure optimal performance and reliability.
Regularly inspecting the diesel generator for any signs of wear or damage
Testing the generator's components such as fuel system, cooling system, and electrical system
Servicing the generator by changing oil, filters, and spark plugs as needed
Keeping maintenance records and schedu...
The pump dismantling procedure involves several steps to safely disassemble the pump for maintenance or repair.
Start by isolating the pump from the power source and draining any remaining fluid from the system.
Remove the pump casing and impeller carefully to access the internal components.
Inspect each component for wear or damage, and replace any faulty parts as needed.
Clean all parts thoroughly before reassembling the...
posted on 31 Mar 2024
I applied via Campus Placement and was interviewed in Oct 2023. There were 2 interview rounds.
They will give you a problem statement and best solution will win
Sales Executive
63
salaries
| ₹3.6 L/yr - ₹7 L/yr |
Senior Sales Executive
30
salaries
| ₹3 L/yr - ₹7.8 L/yr |
Production Officer
20
salaries
| ₹2.8 L/yr - ₹4.5 L/yr |
Sales Manager
17
salaries
| ₹7.5 L/yr - ₹21.2 L/yr |
Area Sales Manager
12
salaries
| ₹6.9 L/yr - ₹11 L/yr |
Britannia
Parle Products
ITC
Dabur