Upload Button Icon Add office photos
Premium Employer

i

This company page is being actively managed by ReNew Team. If you also belong to the team, you can get access from here

ReNew Verified Tick

Compare button icon Compare button icon Compare

Proud winner of ABECA 2024 - AmbitionBox Employee Choice Awards

zig zag pattern zig zag pattern

Filter interviews by

ReNew Site Engineer Interview Questions and Answers

Updated 15 Jan 2023

ReNew Site Engineer Interview Experiences

1 interview found

Site Engineer Interview Questions & Answers

user image Anonymous

posted on 15 Jan 2023

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed before Jan 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Transformers and generators at wtg questions
  • Q2. HT and WTG G-97 & G-114 wtg model questions

Interview Preparation Tips

Topics to prepare for ReNew Site Engineer interview:
  • Electricals
Interview preparation tips for other job seekers - My favorite wtg claiming doing hard work, good job holder at any work.

Interview questions from similar companies

Round 1 - Technical 

(1 Question)

  • Q1. Codes, materials, concrete

Interview Preparation Tips

Interview preparation tips for other job seekers - Prepare well before going for interview
Specifically technical questions
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Aptitude Test 

Nothing much , rest is basically technical

Round 3 - Group Discussion 

We have to talk on a subject for log time thats all

Round 4 - One-on-one 

(2 Questions)

  • Q1. How to speed control on motor and generator.
  • Ans. 

    Speed control on motors and generators can be achieved through various methods.

    • For motors, speed control can be achieved by adjusting the voltage, frequency, or the number of poles.

    • For generators, speed control can be achieved by adjusting the mechanical input or the load connected to the generator.

    • In motors, variable frequency drives (VFDs) can be used to control the speed by adjusting the frequency of the power suppl...

  • Answered by AI
  • Q2. What is IDFT controller ?
  • Ans. 

    IDFT controller stands for Inverse Discrete Fourier Transform controller.

    • IDFT controller is used in signal processing to convert frequency domain signals to time domain signals.

    • It is the inverse of the Discrete Fourier Transform (DFT) controller.

    • IDFT controller is commonly used in audio and video processing applications.

    • It is also used in communication systems to convert frequency domain signals to time domain signals ...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Have a great confidence and idea . answer only those you know dont blabber

I applied via Naukri.com and was interviewed in Nov 2021. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. What is impedance ,reacance
  • Ans. 

    Impedance is the total opposition to the flow of alternating current in a circuit, while reactance is the opposition to the flow of alternating current caused by capacitance or inductance.

    • Impedance is a combination of resistance and reactance in a circuit.

    • Reactance is the opposition to the flow of alternating current caused by capacitance or inductance.

    • Capacitive reactance is the opposition to the flow of alternating c...

  • Answered by AI
  • Q2. How calculate plant load factors
  • Ans. 

    Plant load factor is calculated by dividing the actual energy generated by the maximum possible energy that could have been generated.

    • Plant load factor = Actual energy generated / Maximum possible energy that could have been generated

    • Maximum possible energy is calculated by multiplying the rated capacity of the plant with the number of hours in a given time period

    • Plant load factor is expressed as a percentage

    • It is used...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Focus on fundamental, And answer with clear mindset
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Company Website and was interviewed before Apr 2023. There were 2 interview rounds.

Round 1 - HR 

(1 Question)

  • Q1. Discuss about your total experience and current working company
Round 2 - Technical 

(1 Question)

  • Q1. Asking about transmission line and power transformer testing and other technical questions

I applied via Company Website and was interviewed before May 2021. There was 1 interview round.

Round 1 - Technical 

(1 Question)

  • Q1. What is impidance,DGR FUNDAMENTAL AND BASICS
  • Ans. 

    Impedance is the measure of opposition to the flow of electric current in a circuit. DGR fundamental refers to the Dielectric Withstand Voltage test.

    • Impedance is measured in ohms and is the combination of resistance, capacitance, and inductance in a circuit.

    • DGR fundamental is a test to determine the maximum voltage a material can withstand without breaking down.

    • Basics of impedance include understanding the relationship...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Clear basics fundamental of electrical
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Apr 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. TECHNICAL AND OTHER QUESTION
  • Q2. CIVIL REALETED AND GK QUESTION
Round 3 - Group Discussion 

GK AND OTHER KNOWLEDGE

Interview Preparation Tips

Topics to prepare for Adani Green Energy Site Engineer interview:
  • Civil Works
  • General Administration
  • Construction
Interview preparation tips for other job seekers - I WISH SELECTED MY JOB
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. Detailed Drawing
  • Q2. What is the unit weight of steel
  • Ans. 

    The unit weight of steel is typically around 7850 kg/m^3.

    • The unit weight of steel is commonly used in construction and engineering to calculate the weight of steel structures.

    • The unit weight of steel is typically around 7850 kg/m^3, but can vary depending on the type of steel.

    • For example, the unit weight of stainless steel is around 7480 kg/m^3, while the unit weight of carbon steel is around 7850 kg/m^3.

  • Answered by AI
Round 2 - HR 

(1 Question)

  • Q1. Discuss about CTC
  • Ans. 

    CTC stands for Cost to Company, which includes all expenses related to an employee's salary and benefits.

    • CTC includes salary, bonuses, benefits, and any other perks provided by the company.

    • It is the total amount of money a company spends on an employee in a year.

    • CTC is different from take-home salary as it includes all expenses incurred by the company for the employee.

    • Employer's contribution to PF, insurance, and other...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Constructive environment

I appeared for an interview before Nov 2016.

Interview Questionnaire 

3 Questions

  • Q1. About yourself
  • Q2. Will you work at any location
  • Ans. 

    Yes, I am willing to work at any location for the Senior Engineer position.

    • I am open to relocating for the right opportunity

    • I have experience working in different locations

    • I am flexible and adaptable to new environments

  • Answered by AI
  • Q3. Why you think you can work in any adverse situation
  • Ans. 

    I have a proven track record of staying calm and focused in challenging situations, allowing me to problem-solve effectively.

    • I have experience working in high-pressure environments and have successfully delivered projects on time despite obstacles.

    • I am adaptable and can quickly assess a situation to determine the best course of action.

    • I have strong problem-solving skills and can think creatively to find solutions in ad

  • Answered by AI

Interview Preparation Tips

Round: Test
Duration: 1 hour
Total Questions: 100

Round: Group Discussion
Duration: 20 minutes

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(2 Questions)

  • Q1. About salary and about experience,etc
  • Q2. About salary accommodation transportation
Round 3 - Aptitude Test 

About experience about cell and SOP,MSDS, etc.

Round 4 - Aptitude Test 

About experience about and how to improve quality, efficiency,

Interview Preparation Tips

Interview preparation tips for other job seekers - I have 5.3 years experience in solar cell manufacturing i know how to improve efficiency, control rework, manpower handle, production plan, new manpower training, and i have complete QCC project certificate and reduce zero efficiency cell and get the gold in QQC project in vadodara

ReNew Interview FAQs

How many rounds are there in ReNew Site Engineer interview?
ReNew interview process usually has 2 rounds. The most common rounds in the ReNew interview process are Resume Shortlist and Technical.
How to prepare for ReNew Site Engineer interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at ReNew. The most common topics and skills that interviewers at ReNew expect are Solar Energy, Renewable Energy, Solar, Operations and Electrical Engineering.
What are the top questions asked in ReNew Site Engineer interview?

Some of the top questions asked at the ReNew Site Engineer interview -

  1. transformers and generators at wtg questi...read more
  2. HT and WTG G-97 & G-114 wtg model questi...read more

Tell us how to improve this page.

ReNew Site Engineer Interview Process

based on 1 interview

Interview experience

4
  
Good
View more
ReNew Site Engineer Salary
based on 20 salaries
₹3.5 L/yr - ₹5.6 L/yr
29% more than the average Site Engineer Salary in India
View more details

ReNew Site Engineer Reviews and Ratings

based on 5 reviews

4.1/5

Rating in categories

3.7

Skill development

3.8

Work-life balance

4.1

Salary

4.2

Job security

4.2

Company culture

3.4

Promotions

3.7

Work satisfaction

Explore 5 Reviews and Ratings
Assistant Manager
409 salaries
unlock blur

₹5.6 L/yr - ₹15.5 L/yr

Senior Engineer
351 salaries
unlock blur

₹3.9 L/yr - ₹10.5 L/yr

Deputy Manager
318 salaries
unlock blur

₹7.5 L/yr - ₹23 L/yr

Engineer
265 salaries
unlock blur

₹3 L/yr - ₹8 L/yr

Manager
165 salaries
unlock blur

₹8.3 L/yr - ₹28 L/yr

Explore more salaries
Compare ReNew with

Adani Power

3.9
Compare

Adani Green Energy

4.1
Compare

Vestas

4.3
Compare

Jakson Group

4.2
Compare
Did you find this page helpful?
Yes No
write
Share an Interview