Redco Construction Almana General Supervisor Interview Questions and Answers

Updated 8 Jul 2023

Redco Construction Almana General Supervisor Interview Experiences

1 interview found

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(4 Questions)

  • Q1. All questions about civil work
  • Q2. About civil work like how apply water tank water proofing
  • Q3. About construction beem tai beem
  • Q4. About pailing works and general civil work

Interview Preparation Tips

Interview preparation tips for other job seekers - I have good experience in Gcc with driving licence last 18 years as general supervisor in saudiya and Qatar and Bahrain

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed before May 2023. There were 2 interview rounds.

Round 1 - Aptitude Test 

General aptitude of IQ

Round 2 - Technical 

(5 Questions)

  • Q1. QA and QC related
  • Q2. What is the criteria of acceptance of a concrete compressive strength
  • Ans. 

    Concrete compressive strength acceptance criteria is based on specified strength, testing frequency, and acceptance criteria.

    • Specified strength should be determined by the project requirements or standards.

    • Testing frequency should be established to ensure consistent quality control.

    • Acceptance criteria may include minimum strength requirements and statistical analysis.

    • Example: Specified strength of 28 MPa, testing every...

  • Answered by AI
  • Q3. What is project management
  • Ans. 

    Project management is the practice of initiating, planning, executing, controlling, and closing the work of a team to achieve specific goals and meet specific success criteria.

    • Involves initiating, planning, executing, controlling, and closing a project

    • Focuses on achieving specific goals and meeting success criteria

    • Requires effective communication, coordination, and resource management

    • Utilizes tools and techniques such ...

  • Answered by AI
  • Q4. How to handle the contractor if he is not performing
  • Ans. 

    Address the issue directly with the contractor and set clear expectations for improvement.

    • Schedule a meeting with the contractor to discuss performance concerns

    • Clearly communicate the areas where the contractor is not meeting expectations

    • Set specific goals and deadlines for improvement

    • Offer support or resources to help the contractor improve

    • Consider consequences if performance does not improve, such as termination of c

  • Answered by AI
  • Q5. What do you mean By EPCcontractor
  • Ans. 

    EPC stands for Engineering, Procurement, and Construction. An EPC contractor is a company that provides all services required for a project from design to completion.

    • EPC stands for Engineering, Procurement, and Construction

    • EPC contractors are responsible for designing, procuring materials, and constructing projects

    • They are often hired for large-scale projects such as power plants, refineries, and infrastructure project

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - It's good company to perform and show your ability
Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Recruitment Consulltant and was interviewed in Mar 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - One-on-one 

(2 Questions)

  • Q1. Technical and managerial
  • Q2. Management related question
Round 3 - HR 

(2 Questions)

  • Q1. Regarding team management
  • Q2. How to manage team
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-

I applied via Recruitment Consulltant

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - HR 

(1 Question)

  • Q1. Work related and current responsibility
Round 3 - Technical 

(1 Question)

  • Q1. Faculty and experience related
Interview experience
4
Good
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed before Apr 2023. There was 1 interview round.

Round 1 - One-on-one 

(5 Questions)

  • Q1. Based on experience
  • Q2. How could you achieve your coal
  • Q3. How will you face your problem
  • Q4. In time completion of project
  • Q5. Economical and quality work

I applied via Company Website and was interviewed before Apr 2021. There were 2 interview rounds.

Round 1 - Group Discussion 
Pro Tip by AmbitionBox:
Don’t treat group discussions as an argument. Group discussion is about reaching a meaningful conclusion.
View all tips
Round 2 - One-on-one 

(1 Question)

  • Q1. About ourselves and job knowledge

Interview Preparation Tips

Topics to prepare for Saint-Gobain HR Generalist interview:
  • Current Job
Interview preparation tips for other job seekers - Immediate joiners .. About job
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(1 Question)

  • Q1. Current project details
Interview experience
4
Good
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Recruitment Consulltant and was interviewed before Jan 2022. There was 1 interview round.

Round 1 - Technical 

(7 Questions)

  • Q1. Type of Experience with Company Target Achievement on Timely Basis to Complete assignments
  • Q2. Achived Great Target
  • Ans. 

    Yes, I have achieved great targets in my previous roles.

    • In my previous role as Sales Manager, I exceeded the sales target by 20% in the first quarter.

    • I implemented a new marketing strategy that resulted in a 30% increase in customer acquisition.

    • I led a team that successfully launched a new product line, which generated $1 million in revenue within the first month.

  • Answered by AI
  • Q3. Commercial & Costing with Productivity Working
  • Q4. Final Salary Negotiations
  • Q5. Billing & Cost Working for Organization
  • Ans. 

    Billing and cost working is crucial for any organization to maintain financial stability.

    • Billing and cost working involves tracking expenses and revenue to ensure financial stability.

    • It includes creating invoices, managing accounts payable and receivable, and budgeting.

    • Effective billing and cost working can help identify areas for cost savings and improve profitability.

    • For example, implementing a new billing system tha...

  • Answered by AI
  • Q6. Proffit & loss ,MIS Preparation etc
  • Q7. Job Posting Period for further

Interview Preparation Tips

Interview preparation tips for other job seekers - Need to Create Safe Working with Team Building for Project with Organization

I applied via Company Website and was interviewed before Apr 2020. There were 3 interview rounds.

Interview Questionnaire 

12 Questions

  • Q1. 1. Make a layout of combined cycle power plant with different structures and components.
  • Ans. 

    Layout of combined cycle power plant with different structures and components.

    • Combined cycle power plant consists of gas turbine, heat recovery steam generator, and steam turbine.

    • Gas turbine generates electricity by burning natural gas or oil.

    • Heat recovery steam generator recovers waste heat from gas turbine exhaust and generates steam.

    • Steam turbine generates additional electricity using the steam produced by heat reco...

  • Answered by AI
  • Q2. 2 How you design machine foundation for Gas turbine. which are the different types of machine foundations.
  • Ans. 

    Designing machine foundation for gas turbine involves several factors and types of foundations.

    • Factors to consider include soil type, turbine size and weight, seismic activity, and environmental conditions.

    • Types of foundations include block, pile, and raft foundations.

    • Block foundations are suitable for smaller turbines on stable soil.

    • Pile foundations are used for larger turbines or unstable soil.

    • Raft foundations are us...

  • Answered by AI
  • Q3. 3. How you do ductile detailing for beam , column and foundation . which are the IS code you use for ductile detailing.
  • Ans. 

    Ductile detailing for beam, column, and foundation involves following IS codes and ensuring proper reinforcement placement.

    • For beams, IS 13920 is followed and reinforcement is placed at the bottom of the beam.

    • For columns, IS 13920 and IS 456 are followed and reinforcement is placed in a spiral pattern.

    • For foundations, IS 13920 and IS 2911 are followed and reinforcement is placed in a specific pattern based on the type ...

  • Answered by AI
  • Q4. 4.what are the different type of pile foundation and how you design them .
  • Ans. 

    Pile foundations are used to transfer loads from structures to soil. Different types include driven piles, bored piles, and screw piles.

    • Driven piles are installed by hammering or vibrating them into the ground.

    • Bored piles are created by drilling a hole and then filling it with concrete and steel reinforcement.

    • Screw piles are twisted into the ground using a hydraulic motor.

    • Design considerations include soil type, load c...

  • Answered by AI
  • Q5. 5. How you design shear wall and how you detail it .
  • Ans. 

    Shear walls are designed to resist lateral forces. Detailing includes reinforcement placement and anchorage.

    • Design shear walls based on the building code requirements and structural analysis.

    • Select appropriate materials and thickness for the shear wall.

    • Detail the reinforcement placement and anchorage to ensure proper load transfer.

    • Provide adequate boundary elements and openings for ducts and pipes.

    • Consider seismic and ...

  • Answered by AI
  • Q6. 6. which are the different software you are using for structural analysis.
  • Ans. 

    I have experience with various software for structural analysis.

    • STAAD.Pro

    • SAP2000

    • ETABS

    • ANSYS

    • AutoCAD Structural Detailing

  • Answered by AI
  • Q7. 7. How you model raft foundation or shear wall in finet element method.
  • Ans. 

    To model raft foundation or shear wall in finite element method, one needs to follow certain steps.

    • First, create a 3D model of the foundation or wall using a CAD software.

    • Next, import the model into a finite element analysis software.

    • Define the material properties and boundary conditions.

    • Mesh the model to create finite elements.

    • Solve the model to obtain the stresses and displacements.

    • Finally, analyze the results and ma...

  • Answered by AI
  • Q8. 8. How you design water retaining structures. which is the IS code you use for water retaining structures. and what is the crack width for water retaining structures.
  • Ans. 

    Water retaining structures are designed as per IS code and crack width is limited to ensure safety.

    • Design of water retaining structures involves determining the loads, selecting materials, and ensuring stability.

    • IS 3370 is the code used for design of water retaining structures in India.

    • The crack width for water retaining structures is limited to 0.2 mm to ensure safety and prevent leakage.

    • Various types of water retaini...

  • Answered by AI
  • Q9. 9. Have you worked with international codes like American and British codes .
  • Ans. 

    Yes, I have worked with both American and British codes.

    • I have experience working with the International Building Code (IBC) which is based on American codes.

    • I have also worked with British Standards (BS) such as BS 5950 for structural steel design.

    • I am familiar with the differences between the two codes and can adapt accordingly.

  • Answered by AI
  • Q10. 10. What are the different load combination for RCC and Steal structures .
  • Ans. 

    Different load combinations for RCC and Steel structures.

    • Load combinations for RCC structures include dead load, live load, wind load, earthquake load, and temperature load.

    • Load combinations for Steel structures include dead load, live load, wind load, earthquake load, temperature load, and snow load.

    • Load combinations are determined based on the design codes and standards applicable to the project.

    • The load combinations...

  • Answered by AI
  • Q11. 11. Do you have exposure of site inspection and can you make progress and quality report .
  • Ans. 

    Yes, I have extensive experience in site inspections and creating progress and quality reports.

    • I have conducted site inspections for various projects in my previous roles.

    • I am proficient in creating detailed progress and quality reports based on my observations during site inspections.

    • I have also implemented corrective actions based on the findings of my inspections to ensure project success.

    • For example, in my previous...

  • Answered by AI
  • Q12. 12. Draw a bending moment and shear fonce diagram for portal frame with lateral force and UDL .
  • Ans. 

    To draw a bending moment and shear force diagram for a portal frame with lateral force and UDL.

    • Calculate the reactions at the supports

    • Determine the shear force and bending moment at each section

    • Plot the shear force and bending moment diagrams

    • Identify the maximum shear force and bending moment

    • Consider the sign conventions for shear force and bending moment

    • Use appropriate software or tools for accurate results

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - you should be perfect in design aspect and fundamentals, different codes and state of art software which you using.

Skills evaluated in this interview

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral and was interviewed before Apr 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all tips
Round 2 - One-on-one 

(2 Questions)

  • Q1. How would you boost trailing site works
  • Ans. 

    Boost trailing site works by implementing efficient project management strategies and fostering effective communication.

    • Implement a clear project timeline and set realistic deadlines

    • Assign dedicated project managers to oversee and coordinate site works

    • Ensure regular communication and collaboration between different teams and stakeholders

    • Provide necessary resources and equipment to expedite site works

    • Regularly monitor a...

  • Answered by AI
  • Q2. How will you avoid Malpractice (referance to geotagging etc for projects
  • Ans. 

    To avoid malpractice in geotagging projects, follow these pointers:

    • Ensure accurate and reliable geotagging data

    • Implement strict quality control measures

    • Regularly update and maintain geotagging systems

    • Train employees on proper geotagging procedures

    • Conduct audits and inspections to identify and rectify any malpractice

    • Establish clear guidelines and protocols for geotagging projects

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - To the point answers
Avoid debates
Be Brief but accurate to convey your important achievements

Redco Construction Almana Interview FAQs

How many rounds are there in Redco Construction Almana General Supervisor interview?
Redco Construction Almana interview process usually has 2 rounds. The most common rounds in the Redco Construction Almana interview process are Technical and Resume Shortlist.
What are the top questions asked in Redco Construction Almana General Supervisor interview?

Some of the top questions asked at the Redco Construction Almana General Supervisor interview -

  1. About civil work like how apply water tank water proof...read more
  2. About pailing works and general civil w...read more
  3. About construction beem tai b...read more

Tell us how to improve this page.

Interview Questions from Similar Companies

Tata Technologies Interview Questions
3.7
 • 249 Interviews
Saint-Gobain Interview Questions
4.0
 • 169 Interviews
AECOM Interview Questions
4.3
 • 109 Interviews
Worley Interview Questions
4.1
 • 106 Interviews
Bechtel Interview Questions
4.0
 • 65 Interviews
Samsung E&A Interview Questions
4.1
 • 58 Interviews
View all
QA QC Engineer
3 salaries
unlock blur

₹18 L/yr - ₹20 L/yr

Document Controller
3 salaries
unlock blur

₹1 L/yr - ₹10 L/yr

Explore more salaries
Compare Redco Construction Almana with

Megha Engineering & Infrastructures

3.9
Compare

Shapoorji Pallonji Group

4.2
Compare

Alstom Transportation

3.8
Compare

Tata Technologies

3.7
Compare

Calculate your in-hand salary

Confused about how your in-hand salary is calculated? Enter your annual salary (CTC) and get your in-hand salary
Did you find this page helpful?
Yes No
write
Share an Interview