I applied via Approached by Company and was interviewed before May 2023. There were 2 interview rounds.
General aptitude of IQ
Concrete compressive strength acceptance criteria is based on specified strength, testing frequency, and acceptance criteria.
Specified strength should be determined by the project requirements or standards.
Testing frequency should be established to ensure consistent quality control.
Acceptance criteria may include minimum strength requirements and statistical analysis.
Example: Specified strength of 28 MPa, testing every...
Project management is the practice of initiating, planning, executing, controlling, and closing the work of a team to achieve specific goals and meet specific success criteria.
Involves initiating, planning, executing, controlling, and closing a project
Focuses on achieving specific goals and meeting success criteria
Requires effective communication, coordination, and resource management
Utilizes tools and techniques such ...
Address the issue directly with the contractor and set clear expectations for improvement.
Schedule a meeting with the contractor to discuss performance concerns
Clearly communicate the areas where the contractor is not meeting expectations
Set specific goals and deadlines for improvement
Offer support or resources to help the contractor improve
Consider consequences if performance does not improve, such as termination of c
EPC stands for Engineering, Procurement, and Construction. An EPC contractor is a company that provides all services required for a project from design to completion.
EPC stands for Engineering, Procurement, and Construction
EPC contractors are responsible for designing, procuring materials, and constructing projects
They are often hired for large-scale projects such as power plants, refineries, and infrastructure project
posted on 22 Apr 2023
I applied via Recruitment Consulltant and was interviewed in Mar 2023. There were 3 interview rounds.
I applied via Recruitment Consulltant
posted on 26 Apr 2024
I applied via Walk-in and was interviewed before Apr 2023. There was 1 interview round.
I applied via Company Website and was interviewed before Apr 2021. There were 2 interview rounds.
posted on 27 Feb 2024
posted on 6 Jan 2023
I applied via Recruitment Consulltant and was interviewed before Jan 2022. There was 1 interview round.
Yes, I have achieved great targets in my previous roles.
In my previous role as Sales Manager, I exceeded the sales target by 20% in the first quarter.
I implemented a new marketing strategy that resulted in a 30% increase in customer acquisition.
I led a team that successfully launched a new product line, which generated $1 million in revenue within the first month.
Billing and cost working is crucial for any organization to maintain financial stability.
Billing and cost working involves tracking expenses and revenue to ensure financial stability.
It includes creating invoices, managing accounts payable and receivable, and budgeting.
Effective billing and cost working can help identify areas for cost savings and improve profitability.
For example, implementing a new billing system tha...
I applied via Company Website and was interviewed before Apr 2020. There were 3 interview rounds.
Layout of combined cycle power plant with different structures and components.
Combined cycle power plant consists of gas turbine, heat recovery steam generator, and steam turbine.
Gas turbine generates electricity by burning natural gas or oil.
Heat recovery steam generator recovers waste heat from gas turbine exhaust and generates steam.
Steam turbine generates additional electricity using the steam produced by heat reco...
Designing machine foundation for gas turbine involves several factors and types of foundations.
Factors to consider include soil type, turbine size and weight, seismic activity, and environmental conditions.
Types of foundations include block, pile, and raft foundations.
Block foundations are suitable for smaller turbines on stable soil.
Pile foundations are used for larger turbines or unstable soil.
Raft foundations are us...
Ductile detailing for beam, column, and foundation involves following IS codes and ensuring proper reinforcement placement.
For beams, IS 13920 is followed and reinforcement is placed at the bottom of the beam.
For columns, IS 13920 and IS 456 are followed and reinforcement is placed in a spiral pattern.
For foundations, IS 13920 and IS 2911 are followed and reinforcement is placed in a specific pattern based on the type ...
Pile foundations are used to transfer loads from structures to soil. Different types include driven piles, bored piles, and screw piles.
Driven piles are installed by hammering or vibrating them into the ground.
Bored piles are created by drilling a hole and then filling it with concrete and steel reinforcement.
Screw piles are twisted into the ground using a hydraulic motor.
Design considerations include soil type, load c...
Shear walls are designed to resist lateral forces. Detailing includes reinforcement placement and anchorage.
Design shear walls based on the building code requirements and structural analysis.
Select appropriate materials and thickness for the shear wall.
Detail the reinforcement placement and anchorage to ensure proper load transfer.
Provide adequate boundary elements and openings for ducts and pipes.
Consider seismic and ...
I have experience with various software for structural analysis.
STAAD.Pro
SAP2000
ETABS
ANSYS
AutoCAD Structural Detailing
To model raft foundation or shear wall in finite element method, one needs to follow certain steps.
First, create a 3D model of the foundation or wall using a CAD software.
Next, import the model into a finite element analysis software.
Define the material properties and boundary conditions.
Mesh the model to create finite elements.
Solve the model to obtain the stresses and displacements.
Finally, analyze the results and ma...
Water retaining structures are designed as per IS code and crack width is limited to ensure safety.
Design of water retaining structures involves determining the loads, selecting materials, and ensuring stability.
IS 3370 is the code used for design of water retaining structures in India.
The crack width for water retaining structures is limited to 0.2 mm to ensure safety and prevent leakage.
Various types of water retaini...
Yes, I have worked with both American and British codes.
I have experience working with the International Building Code (IBC) which is based on American codes.
I have also worked with British Standards (BS) such as BS 5950 for structural steel design.
I am familiar with the differences between the two codes and can adapt accordingly.
Different load combinations for RCC and Steel structures.
Load combinations for RCC structures include dead load, live load, wind load, earthquake load, and temperature load.
Load combinations for Steel structures include dead load, live load, wind load, earthquake load, temperature load, and snow load.
Load combinations are determined based on the design codes and standards applicable to the project.
The load combinations...
Yes, I have extensive experience in site inspections and creating progress and quality reports.
I have conducted site inspections for various projects in my previous roles.
I am proficient in creating detailed progress and quality reports based on my observations during site inspections.
I have also implemented corrective actions based on the findings of my inspections to ensure project success.
For example, in my previous...
To draw a bending moment and shear force diagram for a portal frame with lateral force and UDL.
Calculate the reactions at the supports
Determine the shear force and bending moment at each section
Plot the shear force and bending moment diagrams
Identify the maximum shear force and bending moment
Consider the sign conventions for shear force and bending moment
Use appropriate software or tools for accurate results
posted on 11 Apr 2023
I applied via Referral and was interviewed before Apr 2022. There were 2 interview rounds.
Boost trailing site works by implementing efficient project management strategies and fostering effective communication.
Implement a clear project timeline and set realistic deadlines
Assign dedicated project managers to oversee and coordinate site works
Ensure regular communication and collaboration between different teams and stakeholders
Provide necessary resources and equipment to expedite site works
Regularly monitor a...
To avoid malpractice in geotagging projects, follow these pointers:
Ensure accurate and reliable geotagging data
Implement strict quality control measures
Regularly update and maintain geotagging systems
Train employees on proper geotagging procedures
Conduct audits and inspections to identify and rectify any malpractice
Establish clear guidelines and protocols for geotagging projects
QA QC Engineer
3
salaries
| ₹18 L/yr - ₹20 L/yr |
Document Controller
3
salaries
| ₹1 L/yr - ₹10 L/yr |
Megha Engineering & Infrastructures
Shapoorji Pallonji Group
Alstom Transportation
Tata Technologies