Filter interviews by
Top trending discussions
posted on 29 Jun 2015
posted on 29 Jun 2015
posted on 14 Jul 2017
I was interviewed before Jul 2016.
I applied via Approached by Company and was interviewed before Oct 2022. There were 2 interview rounds.
Extra Dose bridge has additional support structures while cable stay bridge uses cables to support the bridge deck.
Extra Dose bridge has additional piers or columns for support.
Cable stay bridge uses cables attached to towers to support the bridge deck.
Extra Dose bridge is more common for shorter spans while cable stay bridge is used for longer spans.
Cable stay bridges have a more modern and sleek appearance compared t
Types of contracts include express, implied, unilateral, bilateral, and voidable contracts.
Express contract: Clearly stated terms and conditions, either written or verbal.
Implied contract: Terms inferred from the actions or conduct of the parties involved.
Unilateral contract: One party makes a promise in exchange for the performance of an act by the other party.
Bilateral contract: Both parties exchange promises to perf...
I applied via Walk-in and was interviewed before Jun 2022. There were 4 interview rounds.
Total 3 rounds of interview were conducted
I applied via Walk-in and was interviewed in Jun 2023. There were 2 interview rounds.
The process of making a minor bridge involves planning, design, construction, and inspection.
1. Planning phase involves determining the location, size, and type of bridge needed.
2. Design phase includes creating detailed drawings and calculations for the bridge structure.
3. Construction phase involves building the foundation, supports, and deck of the bridge.
4. Inspection phase ensures the bridge meets safety and quali...
Piling point can be assured by conducting thorough soil investigation, using appropriate piling equipment, and monitoring the piling process.
Conduct soil investigation to determine soil conditions and suitability for piling.
Select appropriate piling equipment based on soil conditions and project requirements.
Monitor the piling process to ensure proper installation and alignment of piles.
Perform load tests on completed
The execution of an elevated viaduct involves various tasks such as pile foundation, pier construction, post-tensioning girders, and bridge structures.
Tasks include pile foundation construction for the viaduct, pier construction for support, post-tensioning of girders for strength, and bridge structure assembly.
Activities also involve conducting load tests, NDT tests, deflection tests, and steel reconciliation for qual...
I applied via Naukri.com and was interviewed in Feb 2021. There were 3 interview rounds.
based on 1 interview
Interview experience
based on 12 reviews
Rating in categories
Engineer
4
salaries
| ₹0 L/yr - ₹0 L/yr |
Project Manager
4
salaries
| ₹0 L/yr - ₹0 L/yr |
Accountant
4
salaries
| ₹0 L/yr - ₹0 L/yr |
Junior Engineer
4
salaries
| ₹0 L/yr - ₹0 L/yr |
Civil Site Engineer
4
salaries
| ₹0 L/yr - ₹0 L/yr |
Megha Engineering & Infrastructures
Shapoorji Pallonji Group
Alstom Transportation
Tata Technologies