Filter interviews by
Top trending discussions
I applied via Walk-in and was interviewed in May 2021. There was 1 interview round.
The principal of surveying involves accurately measuring and mapping the physical features of the land.
Surveying involves measuring and mapping land features such as boundaries, elevations, and distances.
The principal of surveying requires the use of specialized equipment such as total stations and GPS receivers.
Surveying is used in a variety of industries including construction, engineering, and land development.
Accur...
I applied via Recruitment Consulltant and was interviewed in Sep 2024. There were 2 interview rounds.
I have 8 years of experience working as a Land Surveyor.
8 years of experience in land surveying
Proficient in using surveying equipment and software
Experience in conducting boundary surveys, topographic surveys, and construction staking
Familiar with relevant laws and regulations in land surveying
As a Land Surveyor, my role is to accurately measure and map the land, including boundaries, topography, and features for construction or development projects.
Accurately measure and map land boundaries
Analyze topography and features of the land
Provide data for construction or development projects
posted on 7 Oct 2024
posted on 3 Aug 2023
I applied via Company Website and was interviewed in Jul 2023. There were 3 interview rounds.
An auto level machine is a surveying instrument used to measure height differences and level surfaces.
Auto level machines use a compensator to ensure accurate readings.
They are commonly used in construction, land surveying, and civil engineering.
Examples of auto level machines include Leica NA700 Series and Topcon AT-B Series.
True north is the direction towards the geographic North Pole, while magnetic north is the direction towards the north magnetic pole.
True north is fixed and does not change over time, while magnetic north constantly shifts due to changes in the Earth's magnetic field.
True north is used for navigation on maps and charts, while magnetic north is used by compasses.
The angle between true north and magnetic north is called ...
The first surveyor in India is George Everest, who served as the Surveyor General of India from 1830 to 1843.
George Everest was appointed as the Surveyor General of India in 1830.
He is known for his work in mapping the Indian subcontinent, including the measurement of the height of Mount Everest which was later named after him.
Everest's tenure as Surveyor General of India laid the foundation for modern mapping and surv
I applied via Referral and was interviewed before Oct 2022. There were 3 interview rounds.
Current CTC is $60,000 and Expected CTC is $70,000.
Current CTC is the current annual salary of the candidate.
Expected CTC is the annual salary the candidate is expecting from the new job.
It is important for the employer to know the candidate's salary expectations to assess if it aligns with the budget.
For example, if the candidate's Current CTC is $50,000 and Expected CTC is $65,000, there is a $15,000 difference.
Yes, I am actively involved in preparing cost estimations for construction projects. I typically prepare detailed estimates based on quantities, labor rates, material costs, and overhead expenses.
I prepare detailed estimates based on quantities of materials and labor required for a project.
I consider factors such as material costs, labor rates, equipment costs, and overhead expenses in my estimates.
I use software tools...
Verify the bill by checking quantities, rates, unit prices, supporting documents, and site measurements.
Check quantities mentioned in the bill against the actual work done on site.
Verify rates and unit prices for each item in the bill with the contract agreement.
Ensure all supporting documents such as invoices, receipts, and delivery notes are provided.
Conduct site measurements to confirm the work completed matches the
Evidential documents required for scrutinizing the RA Bill
Contract documents
Measurement sheets
Bills of quantities
Variation orders
Payment certificates
Justification of change of scope works involves thorough analysis, cost estimation, impact assessment, and communication with stakeholders.
Conduct a detailed analysis of the proposed changes in scope, including the reasons for the change and the potential impact on the project.
Estimate the additional costs and resources required for the change of scope works, taking into account materials, labor, and any other relevant...
Basic inputs for preparing the Bill of Quantities include drawings, specifications, and site visits.
Drawings: Architectural, structural, and MEP drawings are essential for accurately quantifying materials and labor.
Specifications: Detailed project specifications outline the quality and standards required for each item in the bill.
Site visits: Surveyors need to visit the site to assess existing conditions, access, and a...
I applied via Recruitment Consultant and was interviewed in May 2021. There were 4 interview rounds.
posted on 10 Nov 2021
I applied via Referral and was interviewed in Dec 2020. There were 4 interview rounds.
I applied via Walk-in and was interviewed in May 2021. There was 1 interview round.
The principal of surveying involves accurately measuring and mapping the physical features of the land.
Surveying involves measuring and mapping land features such as boundaries, elevations, and distances.
The principal of surveying requires the use of specialized equipment such as total stations and GPS receivers.
Surveying is used in a variety of industries including construction, engineering, and land development.
Accur...
based on 1 interview
Interview experience
Civil Site Engineer
15
salaries
| ₹3 L/yr - ₹8.2 L/yr |
Senior Engineer
14
salaries
| ₹5.4 L/yr - ₹10.4 L/yr |
Senior Civil Engineer
8
salaries
| ₹4.5 L/yr - ₹7.8 L/yr |
QA QC Engineer
7
salaries
| ₹2.6 L/yr - ₹5.2 L/yr |
Senior Manager
7
salaries
| ₹6.4 L/yr - ₹22 L/yr |
Larsen & Toubro Limited
GMR Group
Hindustan Construction Company
IRB Infrastructure