i
Puranik Builders
Filter interviews by
I applied via Referral and was interviewed in Jul 2021. There was 1 interview round.
Density of common construction materials varies, with cement around 1440 kg/m3, steel around 7850 kg/m3, fine aggregate around 1600-1750 kg/m3, and coarse aggregate around 1200-1750 kg/m3.
Cement density: 1440 kg/m3
Steel density: 7850 kg/m3
Fine aggregate density: 1600-1750 kg/m3
Coarse aggregate density: 1200-1750 kg/m3
The weight of the cube used to check the strength of concrete is typically 15 cm x 15 cm x 15 cm and weighs around 29 kg.
Standard size of cube for testing concrete strength is 15 cm x 15 cm x 15 cm
Weight of the cube is usually around 29 kg
The cube is made of concrete from the same batch being tested
The ratio of cement mortar for outer and inner wall plastering varies depending on the type of wall and desired finish.
The ratio of cement mortar for outer wall plastering is usually 1:4 (1 part cement to 4 parts sand).
The ratio of cement mortar for inner wall plastering is typically 1:6 (1 part cement to 6 parts sand).
However, the ratio can vary based on factors such as the type of wall surface, desired finish, and lo...
My goal is to become a proficient Site Engineer by gaining experience, knowledge, and skills in the field.
Continuously seek opportunities to learn and improve technical skills
Work on various projects to gain practical experience
Seek mentorship from experienced engineers
Stay updated with industry trends and technologies
Obtain relevant certifications to enhance credibility
Set specific career milestones to track progress
I envision myself as a Senior Site Engineer leading projects and mentoring junior engineers.
Leading and managing multiple projects simultaneously
Mentoring and training junior engineers
Implementing innovative technologies and practices
Collaborating with cross-functional teams for successful project delivery
I applied via Referral and was interviewed in Jan 2021. There were 5 interview rounds.
I applied via Company Website and was interviewed in Oct 2023. There were 3 interview rounds.
Site engineers are responsible for overseeing construction projects, managing workers, ensuring safety regulations are followed, and coordinating with various stakeholders.
Managing construction projects from start to finish
Supervising and coordinating construction workers
Ensuring safety regulations and building codes are followed
Collaborating with architects, engineers, and subcontractors
Preparing and presenting progre
posted on 23 Aug 2023
I applied via Referral and was interviewed before Aug 2022. There were 3 interview rounds.
posted on 20 Sep 2021
I applied via Company Website and was interviewed in Apr 2021. There were 3 interview rounds.
I was interviewed before Nov 2022.
Tiles are laid following the arrows behind them to ensure proper alignment and pattern continuity.
Arrows indicate the direction in which the pattern on the tiles should be aligned.
Following the arrows helps maintain consistency in the pattern layout.
It ensures that the tiles are installed in the correct orientation for a visually appealing finish.
Tiles are laid by spreading adhesive on the surface and then placing the tiles in a desired pattern. They are leveled using a spirit level to ensure a flat surface.
Spread adhesive on the surface evenly
Place tiles in desired pattern, starting from the center and working outwards
Use a spirit level to ensure tiles are level and flat
Make adjustments as needed to maintain levelness
Allow adhesive to dry before grouting the t
I applied via LinkedIn and was interviewed before Sep 2021. There was 1 interview round.
based on 4 reviews
Rating in categories
Associate Sales Manager
47
salaries
| ₹4.6 L/yr - ₹8 L/yr |
Associate Manager
43
salaries
| ₹3 L/yr - ₹8.7 L/yr |
Assistant Manager
38
salaries
| ₹5.4 L/yr - ₹12 L/yr |
Sales Manager
27
salaries
| ₹3 L/yr - ₹9.6 L/yr |
Senior Engineer
25
salaries
| ₹5.8 L/yr - ₹10 L/yr |
Godrej Properties
Sobha
DLF
Tata Housing Development Company